| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - COVINGTON PAVING CO. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,212   |
LNFT |
5.00 |
6,060.00 |
4.10 |
4,969.20 |
3.00 |
3,636.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,655   |
CUYD |
7.00 |
11,585.00 |
16.00 |
26,480.00 |
10.00 |
16,550.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
5,710   |
CUYD |
5.44 |
31,062.40 |
18.00 |
102,780.00 |
20.00 |
114,200.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
15,606.4 |
TON |
50.00 |
780,320.00 |
51.00 |
795,926.40 |
54.20 |
845,866.88 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
1,272.0 |
TON |
5.00 |
6,360.00 |
60.00 |
76,320.00 |
60.00 |
76,320.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
121,975   |
SQYD |
1.00 |
121,975.00 |
1.00 |
121,975.00 |
1.06 |
129,293.50 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
560.0 |
LNFT |
32.00 |
17,920.00 |
31.00 |
17,360.00 |
30.00 |
16,800.00 |
|
|
| 704-03 |
blocked out guard rail
|
350.0 |
LNFT |
17.00 |
5,950.00 |
17.00 |
5,950.00 |
16.50 |
5,775.00 |
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
75.0 |
LNFT |
32.00 |
2,400.00 |
31.00 |
2,325.00 |
30.00 |
2,250.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
400.0 |
LNFT |
42.00 |
16,800.00 |
41.00 |
16,400.00 |
40.00 |
16,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
16   |
EACH |
2,000.00 |
32,000.00 |
1,900.00 |
30,400.00 |
1,850.00 |
29,600.00 |
|
|
| 707-04 |
asphaltic curb
|
160.0 |
LNFT |
9.00 |
1,440.00 |
16.00 |
2,560.00 |
15.00 |
2,400.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
11,000.00 |
11,000.00 |
35,000.00 |
35,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
17.520 |
MILE |
140.00 |
2,452.80 |
128.00 |
2,242.56 |
650.00 |
11,388.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.400 |
MILE |
10.00 |
134.00 |
300.00 |
4,020.00 |
265.00 |
3,551.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
51.420 |
MILE |
20.00 |
1,028.40 |
1.00 |
51.42 |
529.00 |
27,201.18 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
200   |
SQYD |
65.00 |
13,000.00 |
100.00 |
20,000.00 |
50.00 |
10,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
106,000.00 |
106,000.00 |
60,000.00 |
60,000.00 |
35,000.00 |
35,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
75.00 |
1,200.00 |
72.00 |
1,152.00 |
70.00 |
1,120.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,158   |
EACH |
5.00 |
5,790.00 |
5.00 |
5,790.00 |
4.41 |
5,106.78 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
25.710 |
MILE |
1,800.00 |
46,278.00 |
1,900.00 |
48,849.00 |
1,784.00 |
45,866.64 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.700 |
MILE |
650.00 |
4,355.00 |
720.00 |
4,824.00 |
622.00 |
4,167.40 |
|
|
| 735-01 |
mailboxes
|
88   |
EACH |
2.00 |
176.00 |
12.00 |
1,056.00 |
10.00 |
880.00 |
|
|
| 735-02 |
mailbox supports (single)
|
88   |
EACH |
125.00 |
11,000.00 |
130.00 |
11,440.00 |
125.00 |
11,000.00 |
|
|
| 739-01 |
hydro-seeding
|
0.62 |
ACRE |
1,000.00 |
620.00 |
2,600.00 |
1,612.00 |
3,000.00 |
1,860.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
18,000.00 |
18,000.00 |
12,700.00 |
12,700.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
50,000.00 |
50,000.00 |
28,000.00 |
28,000.00 |
29,000.00 |
29,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,335,906.60 |
|
1,421,482.58 |
|
1,492,532.38 |
|
|
|