Error processing SSI file
Error processing SSI file
Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 7/27/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 052-01-0018
Parish: POINTE COUPEE
Routes: LA 1
Description: OSCAR - S. JCT. LA 3131
Type Const: grading, drain struct, cold planing acp, class ii bc, pvmt patch, superpave acp
ovly, and related work.
 
RankLicenseBidderAmount
100849 F.G. SULLIVAN, JR. CONTRACTOR LLC $3,050,709.60
200046 BARBER BROS. CONTRACTING CO., L.L.C $3,149,118.40
300481 COASTAL BRIDGE CO., L.L.C. $3,172,729.54
 
Item Number Item Description Quantity Unit of Measure - 1 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 2 -
BARBER BROS. CONTRACTING CO., L.L.C
- 3 -
COASTAL BRIDGE CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 87      SQYD 10.00 870.00 20.00 1,740.00 15.00 1,305.00    
202-02-E removal of concrete curbs 106.2    LNFT 5.00 531.00 25.00 2,655.00 20.00 2,124.00    
202-02-G removal of surfacing & stabilized base 1,293.9    SQYD 5.00 6,469.50 8.00 10,351.20 10.00 12,939.00    
203-08 borrow (vehicular measurement) 2,287      CUYD 10.00 22,870.00 15.00 34,305.00 12.00 27,444.00    
302-02-D-01 class ii base course (12" thick) (crushed stone or
recycled pccp)
1,489.9    SQYD 25.00 37,247.50 25.00 37,247.50 30.00 44,697.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
980      CUYD 40.00 39,200.00 45.00 44,100.00 15.00 14,700.00    
502-01 superpave asphaltic concrete 26,920.6    TON 37.00 996,062.20 46.00 1,238,347.60 52.00 1,399,871.20    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,632.1    TON 37.00 97,387.70 75.00 197,407.50 75.00 197,407.50    
509-01-A cold planing asphaltic pavement (1 1/2" average depth) 2,278      SQYD 3.00 6,834.00 2.00 4,556.00 2.00 4,556.00    
509-01-B cold planing asphaltic pavement (2" average depth) 136,770      SQYD 1.50 205,155.00 2.00 273,540.00 2.60 355,602.00    
509-02 contractor retained reclaimed asphaltic pavement - 3,462      CUYD 0.10 - 346.20 FREE FREE 1.00 - 3,462.00    
701-01-K cross drain pipe (30" rpvccp only) 80      LNFT 150.00 12,000.00 150.00 12,000.00 200.00 16,000.00    
701-05-I-01 side drain pipe (24" rcp) 40      LNFT 75.00 3,000.00 75.00 3,000.00 125.00 5,000.00    
702-03-A catch basins (cb-01) 1      EACH 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00    
702-04-A adjusting manholes 1      EACH 1,700.00 1,700.00 1,200.00 1,200.00 500.00 500.00    
702-04-B adjusting catch basins 1      EACH 2,500.00 2,500.00 2,000.00 2,000.00 2,500.00 2,500.00    
702-07-A cross drain safety end (type 1) 1      EACH 3,000.00 3,000.00 3,500.00 3,500.00 4,500.00 4,500.00    
702-08-A side drain safety end (type 1) 2      EACH 3,500.00 7,000.00 3,500.00 7,000.00 2,500.00 5,000.00    
706-02-C concrete drive (6" thick) 59.5    SQYD 40.00 2,380.00 45.00 2,677.50 65.00 3,867.50    
707-03 combination concrete curb & gutter 226.0    LNFT 25.00 5,650.00 25.00 5,650.00 35.00 7,910.00    
710-01 flowable fill 42      CUYD 100.00 4,200.00 150.00 6,300.00 200.00 8,400.00    
713-01 temporary signs & barricades lump      LUMP 220,000.00 220,000.00 100,000.00 100,000.00 65,000.00 65,000.00    
713-03-C temporary pavement markings (8" width) 762      LNFT 0.20 152.40 0.50 381.00 0.40 304.80    
713-03-E temporary pavement markings (24" width) 822      LNFT 0.50 411.00 1.50 1,233.00 1.25 1,027.50    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
17.520  MILE 500.00 8,760.00 400.00 7,008.00 300.00 5,256.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
14.916  MILE 100.00 1,491.60 300.00 4,474.80 260.00 3,878.16    
713-05-A temporary pavement markings (solid line)(4" width) 71.484  MILE 100.00 7,148.40 300.00 21,445.20 1.00 71.48    
720-01-A erosion control system, slope protection (type a) 600      SQYD 1.50 900.00 2.00 1,200.00 1.50 900.00    
724-01-A pavement patching (6" minimum thickness) 2,218      SQYD 20.00 44,360.00 30.00 66,540.00 10.00 22,180.00    
726-01 bedding material 40.8    CUYD FREE FREE FREE FREE 65.00 2,652.00    
727-01 mobilization lump      LUMP 225,000.00 225,000.00 100,000.00 100,000.00 200,000.00 200,000.00    
729-16-B object marker assembly (type 2) 4      EACH 60.00 240.00 75.00 300.00 65.00 260.00    
731-02 reflectorized raised pavement markers 1,819      EACH 6.00 10,914.00 6.00 10,914.00 5.00 9,095.00    
732-01-C plastic pavement striping (8" width) 254      LNFT 1.00 254.00 1.00 254.00 1.00 254.00    
732-01-E plastic pavement striping (24" width) 274      LNFT 4.00 1,096.00 3.00 822.00 3.00 822.00    
732-02-A plastic pavement striping (solid line) (4" width) 17.988  MILE 2,300.00 41,372.40 2,250.00 40,473.00 2,000.00 35,976.00    
732-03-A plastic pavement striping (broken line)(4" width) 4.972  MILE 800.00 3,977.60 800.00 3,977.60 700.00 3,480.40    
732-04-A plastic pavement legends & symbols (arrow) 6      EACH 200.00 1,200.00 160.00 960.00 150.00 900.00    
732-04-C plastic pavement legends & symbols (only) 3      EACH 200.00 600.00 180.00 540.00 150.00 450.00    
735-01 mailboxes 186      EACH 1.00 186.00 6.00 1,116.00 1.00 186.00    
735-02 mailbox supports (single) 170      EACH 110.00 18,700.00 100.00 17,000.00 150.00 25,500.00    
735-03 mailbox supports (double) 6      EACH 200.00 1,200.00 175.00 1,050.00 200.00 1,200.00    
735-04 mailbox supports (multiple) 1      EACH 300.00 300.00 275.00 275.00 300.00 300.00    
739-01 hydro-seeding 21.50   ACRE 800.00 17,200.00 1,000.00 21,500.00 800.00 17,200.00    
740-01 construction layout lump      LUMP 50,000.00 50,000.00 10,000.00 10,000.00 10,000.00 10,000.00    
741-11 adjusting water valve and meter box 1      EACH 200.00 200.00 200.00 200.00 500.00 500.00    
744-01 traffic control management lump      LUMP 99,000.00 99,000.00 60,000.00 60,000.00 40,000.00 40,000.00    
805-12-Y-01 reinforced concrete box culverts (2'x 1 1/2')
(extension)
6.0    LNFT 600.00 3,600.00 600.00 3,600.00 1,500.00 9,000.00    
S-001 roadway reinforcing mesh (complete road system) 82,796      SQYD 5.50 455,378.00 5.00 413,980.00 5.00 413,980.00    
S-002 removal of grassed area (24" minimum thickness) 150.5    SQYD 15.00 2,257.50 15.00 2,257.50 10.00 1,505.00    
S-003 rumble strips (ground-in) 11.8    MILE 1,000.00 11,800.00 900.00 10,620.00 850.00 10,030.00    
S-004 cleaning existing ditches 400      LNFT 10.00 4,000.00 15.00 6,000.00 10.00 4,000.00    
S-005 dynamic message sign unit 2      EACH 20,000.00 40,000.00 30,000.00 60,000.00 12,000.00 24,000.00    
S-006 pavement patching (18" minimum thickness) 3,188.0    SQYD 100.00 318,800.00 90.00 286,920.00 45.00 143,460.00    
S-007 plugging existing 18" rcp cross drain pipe lump      LUMP 3,000.00 3,000.00 3,000.00 3,000.00 5,000.00 5,000.00    
                       
 CONTRACTOR TOTAL       3,050,709.60   3,149,118.40   3,172,729.54    

Error processing SSI file