| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - FORBY CONTRACTING, INC. |
- 2 - HARD ROCK CONSTRUCTION CO. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
400   |
SQYD |
20.00 |
8,000.00 |
15.00 |
6,000.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
300.0 |
LNFT |
10.00 |
3,000.00 |
5.00 |
1,500.00 |
|
|
|
|
| 302-02-D |
class ii base course (12" thick)
|
274.5 |
SQYD |
45.00 |
12,352.50 |
30.00 |
8,235.00 |
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
274.5 |
SQYD |
85.00 |
23,332.50 |
50.00 |
13,725.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
17,904   |
LNFT |
1.10 |
19,694.40 |
1.25 |
22,380.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
14,596   |
LNFT |
1.25 |
18,245.00 |
1.25 |
18,245.00 |
|
|
|
|
| 602-05-G-01 |
full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under) |
889.6 |
SQYD |
105.00 |
93,408.00 |
107.00 |
95,187.20 |
|
|
|
|
| 602-05-G-02 |
full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds) |
1,702.1 |
SQYD |
95.00 |
161,699.50 |
107.00 |
182,124.70 |
|
|
|
|
| 602-05-G-03 |
full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over) |
1,184.2 |
SQYD |
85.00 |
100,657.00 |
107.00 |
126,709.40 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
8   |
EACH |
750.00 |
6,000.00 |
150.00 |
1,200.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
7   |
EACH |
2,000.00 |
14,000.00 |
1,500.00 |
10,500.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
128.0 |
SQYD |
60.00 |
7,680.00 |
70.00 |
8,960.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
528.0 |
SQYD |
60.00 |
31,680.00 |
60.00 |
31,680.00 |
|
|
|
|
| 707-01 |
concrete curb
|
2,533.0 |
LNFT |
10.00 |
25,330.00 |
8.00 |
20,264.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
17,000.00 |
17,000.00 |
|
|
|
|
| 713-02 |
temporary pavement markings
|
lump |
LUMP |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
55,000.00 |
55,000.00 |
73,000.00 |
73,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,482   |
EACH |
5.20 |
7,706.40 |
5.00 |
7,410.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
130   |
LNFT |
0.90 |
117.00 |
1.00 |
130.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.428 |
MILE |
2,120.00 |
9,387.36 |
2,000.00 |
8,856.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.214 |
MILE |
680.00 |
1,505.52 |
700.00 |
1,549.80 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
145.00 |
290.00 |
150.00 |
300.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
165.00 |
330.00 |
160.00 |
320.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
1.107 |
MILE |
5,400.00 |
5,977.80 |
5,000.00 |
5,535.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
1,500.00 |
1,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
2,500.00 |
2,500.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| S-001 |
clean and inspect drainage structures
|
3,556   |
LNFT |
5.00 |
17,780.00 |
7.00 |
24,892.00 |
|
|
|
|
| S-002 |
repair drainage structures
|
25   |
EACH |
1,250.00 |
31,250.00 |
1,500.00 |
37,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
710,422.98 |
|
736,203.10 |
|
|
|
|
|