Letting of 7/27/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 041-01-0035
Parish: CATAHOULA
Routes: LA 124
Description: JONESVILLE - 4.54 MILES NORTH
Type Const: grading, drainage structures, cold planing asphaltic concrete pavement, superpave
asphaltic concrete pavement, pavement patching and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $2,249,286.85
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,543,000.55
312312 GILCHRIST CONSTRUCTION CO. LLC $2,679,562.11
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures and obstructions lump      LUMP 1,000.00 1,000.00 12,200.00 12,200.00 15,000.00 15,000.00    
202-02-G removal of surfacing & stabilized base 754.0    SQYD 12.00 9,048.00 9.00 6,786.00 7.00 5,278.00    
203-01 general excavation 6,656      CUYD 4.00 26,624.00 12.55 83,532.80 5.00 33,280.00    
203-08 borrow (vehicular measurement) 26,313      CUYD 12.00 315,756.00 12.00 315,756.00 12.00 315,756.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
284      CUYD 20.00 5,680.00 29.00 8,236.00 35.00 9,940.00    
502-01 superpave asphaltic concrete 20,667.0    TON 48.00 992,016.00 53.48 1,105,271.16 56.00 1,157,352.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
318.1    TON 100.00 31,810.00 106.00 33,718.60 95.00 30,219.50    
509-01 cold planing asphaltic pavement 65,258      SQYD 1.10 71,783.80 1.10 71,783.80 1.20 78,309.60    
509-02 contractor retained reclaimed asphaltic pavement - 1,812      CUYD 0.01 - 18.12 0.10 - 181.20 1.00 - 1,812.00    
701-01-Q cross drain pipe (60" cmp) 190      LNFT 700.00 133,000.00 610.00 115,900.00 1,400.00 266,000.00    
701-10-I reinforced concrete pipe (extension)(24") 44      LNFT 100.00 4,400.00 85.50 3,762.00 100.00 4,400.00    
701-10-M reinforced concrete pipe (extension)(36") 32      LNFT 150.00 4,800.00 146.50 4,688.00 160.00 5,120.00    
701-15 concrete collar 6      EACH 600.00 3,600.00 1,219.00 7,314.00 1,000.00 6,000.00    
713-01 temporary signs & barricades lump      LUMP 35,000.00 35,000.00 32,100.00 32,100.00 30,000.00 30,000.00    
713-03-C temporary pavement markings (8" width) 105      LNFT 1.00 105.00 0.24 25.20 0.28 29.40    
713-03-E temporary pavement markings (24" width) 945      LNFT 0.50 472.50 0.73 689.85 0.55 519.75    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
15.676  MILE 155.00 2,429.78 155.00 2,429.78 300.00 4,702.80    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
11.691  MILE 350.00 4,091.85 366.00 4,278.90 110.00 1,286.01    
713-05-A temporary pavement markings (solid line)(4" width) 39.190  MILE 1.00 39.19 610.00 23,905.90 200.00 7,838.00    
713-06-A temporary pavement legends and symbols (arrow) 6      EACH 65.00 390.00 61.00 366.00 90.00 540.00    
716-01-A mulch (vegetative) 62.10   ACRE 325.00 20,182.50 735.00 45,643.50 900.00 55,890.00    
717-01 seeding 3,726      LB 1.65 6,147.90 7.31 27,237.06 8.00 29,808.00    
718-01 fertilizer 62,100      LB 0.17 10,557.00 0.27 16,767.00 0.55 34,155.00    
724-01-A pavement patching (6" minimum thickness) 1,013      SQYD 50.00 50,650.00 69.00 69,897.00 50.00 50,650.00    
724-01-B pavement patching (12" minimum thickness) 1,450      SQYD 80.00 116,000.00 79.00 114,550.00 75.00 108,750.00    
724-01-C pavement patching (24" minimum thickness) 414      SQYD 100.00 41,400.00 154.00 63,756.00 125.00 51,750.00    
726-01 bedding material 198.8    CUYD 75.00 14,910.00 36.00 7,156.80 75.00 14,910.00    
727-01 mobilization lump      LUMP 154,000.00 154,000.00 147,200.00 147,200.00 130,000.00 130,000.00    
731-02 reflectorized raised pavement markers 690      EACH 8.00 5,520.00 6.00 4,140.00 5.50 3,795.00    
732-01-C plastic pavement striping (8" width) 35      LNFT 35.00 1,225.00 1.00 35.00 1.70 59.50    
732-01-E plastic pavement striping (24" width) 315      LNFT 6.00 1,890.00 3.75 1,181.25 4.00 1,260.00    
732-02-A plastic pavement striping (solid line) (4" width) 13.063  MILE 3,250.00 42,454.75 2,260.00 29,522.38 2,200.00 28,738.60    
732-03-A plastic pavement striping (broken line)(4" width) 3.897  MILE 1,100.00 4,286.70 855.00 3,331.93 850.00 3,312.45    
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 450.00 900.00 185.00 370.00 250.00 500.00    
735-01 mailboxes 23      EACH 1.00 23.00 13.00 299.00 50.00 1,150.00    
735-02 mailbox supports (single) 21      EACH 125.00 2,625.00 137.00 2,877.00 150.00 3,150.00    
735-03 mailbox supports (double) 1      EACH 175.00 175.00 470.00 470.00 200.00 200.00    
740-01 construction layout lump      LUMP 12,000.00 12,000.00 15,250.00 15,250.00 15,000.00 15,000.00    
744-01 traffic control management lump      LUMP 15,000.00 15,000.00 24,150.00 24,150.00 36,000.00 36,000.00    
805-01-B class a concrete (box culvert headwalls) 37.78   CUYD 800.00 30,224.00 855.00 32,301.90 1,000.00 37,780.00    
805-12-I reinforced concrete box culverts (5'x5') 64.0    LNFT 700.00 44,800.00 735.00 47,040.00 750.00 48,000.00    
806-01 deformed reinforcing steel 2,595      LB 2.00 5,190.00 3.66 9,497.70 1.50 3,892.50    
S-001 plugging existing box culvert 1      EACH 100.00 100.00 6,100.00 6,100.00 2,500.00 2,500.00    
S-002 roadway reinforcing mesh 4,444      SQYD 4.50 19,998.00 5.46 24,264.24 8.00 35,552.00    
S-003 dynamic message sign 2      EACH 3,500.00 7,000.00 8,700.00 17,400.00 6,500.00 13,000.00    
                       
 CONTRACTOR TOTAL       2,249,286.85   2,543,000.55   2,679,562.11    

Error processing SSI file