| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DENTON-JAMES LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - W. E. MCDONALD & SON, LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
900,000.00 |
900,000.00 |
375,000.00 |
375,000.00 |
200,000.00 |
200,000.00 |
125,000.00 |
125,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
184,000.00 |
184,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
132,000.00 |
132,000.00 |
| 202-02-A-01 |
removal of bridges (sta. 217+50, 27.7'x100', concrete
slab bridge) |
1   |
EACH |
18,000.00 |
18,000.00 |
30,000.00 |
30,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
| 202-02-A-02 |
removal of bridges (sta. 357+39.5, 27.8'x81', concrete
slab bridge) |
1   |
EACH |
16,000.00 |
16,000.00 |
30,000.00 |
30,000.00 |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
| 202-02-A-03 |
removal of bridges (sta. 363+00, 27.6'x222.1',
concrete slab bridge) |
1   |
EACH |
28,000.00 |
28,000.00 |
40,000.00 |
40,000.00 |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
| 202-02-A-04 |
removal of bridges (sta. 376+00, 27.6'x262.1',
concrete slab bridge) |
1   |
EACH |
32,000.00 |
32,000.00 |
40,000.00 |
40,000.00 |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
| 202-02-B-01 |
removal of concrete box culverts (sta. 124+79,
3'x3'x56' r. c. box) |
1   |
EACH |
2,000.00 |
2,000.00 |
6,000.00 |
6,000.00 |
1,800.00 |
1,800.00 |
7,500.00 |
7,500.00 |
| 202-02-B-02 |
removal of concrete box culverts (sta. 146+90,
2-4'x4'x55.5' r. c. box) |
1   |
EACH |
4,000.00 |
4,000.00 |
8,000.00 |
8,000.00 |
3,000.00 |
3,000.00 |
7,500.00 |
7,500.00 |
| 202-02-B-03 |
removal of concrete box culverts (sta. 184+46,
4'x4'x77' r. c. box) |
1   |
EACH |
3,500.00 |
3,500.00 |
6,000.00 |
6,000.00 |
1,500.00 |
1,500.00 |
7,500.00 |
7,500.00 |
| 202-02-B-04 |
removal of concrete box culverts (sta. 190+73,
4-5'x5'x75.7' r. c. box) |
1   |
EACH |
8,000.00 |
8,000.00 |
16,000.00 |
16,000.00 |
6,000.00 |
6,000.00 |
7,500.00 |
7,500.00 |
| 202-02-B-05 |
removal of concrete box culverts (sta. 204+90,
4'x5'x76' r. c. box) |
1   |
EACH |
3,000.00 |
3,000.00 |
6,000.00 |
6,000.00 |
1,500.00 |
1,500.00 |
7,500.00 |
7,500.00 |
| 202-02-B-06 |
removal of concrete box culverts (sta. 233+48,
3'x3'x63.5' r. c. box) |
1   |
EACH |
2,000.00 |
2,000.00 |
6,000.00 |
6,000.00 |
1,500.00 |
1,500.00 |
7,500.00 |
7,500.00 |
| 202-02-B-07 |
removal of concrete box culverts (sta. 240+00,
4'x4'x53.7' r. c. box) |
1   |
EACH |
2,500.00 |
2,500.00 |
6,000.00 |
6,000.00 |
1,500.00 |
1,500.00 |
7,500.00 |
7,500.00 |
| 202-02-B-08 |
removal of concrete box culverts (sta. 249+45,
4'x4'x55' r. c. box) |
1   |
EACH |
2,500.00 |
2,500.00 |
6,000.00 |
6,000.00 |
1,500.00 |
1,500.00 |
7,500.00 |
7,500.00 |
| 202-02-B-09 |
removal of concrete box culverts (sta. 255+57,
3-4'x4'x55.3' r. c. box) |
1   |
EACH |
5,000.00 |
5,000.00 |
11,000.00 |
11,000.00 |
6,000.00 |
6,000.00 |
7,500.00 |
7,500.00 |
| 202-02-B-10 |
removal of concrete box culverts (sta. 324+11,
2'x3'x64' r. c. box) |
1   |
EACH |
2,000.00 |
2,000.00 |
6,000.00 |
6,000.00 |
1,500.00 |
1,500.00 |
7,500.00 |
7,500.00 |
| 202-02-B-11 |
removal of concrete box culverts (sta. 451+43.5,
3'x3'x46.5' r. c. box) |
1   |
EACH |
2,000.00 |
2,000.00 |
6,000.00 |
6,000.00 |
1,500.00 |
1,500.00 |
7,500.00 |
7,500.00 |
| 202-02-B-12 |
removal of concrete box culverts (sta. 457+71,
2'x6'x46.6' r. c. box) |
1   |
EACH |
3,000.00 |
3,000.00 |
6,000.00 |
6,000.00 |
1,500.00 |
1,500.00 |
7,500.00 |
7,500.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
68,760   |
SQYD |
5.50 |
378,180.00 |
6.00 |
412,560.00 |
3.25 |
223,470.00 |
5.00 |
343,800.00 |
| 202-02-D |
removal of concrete walks & drives
|
1,566   |
SQYD |
8.00 |
12,528.00 |
5.00 |
7,830.00 |
4.00 |
6,264.00 |
25.00 |
39,150.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
670.0 |
LNFT |
3.00 |
2,010.00 |
7.00 |
4,690.00 |
8.00 |
5,360.00 |
20.00 |
13,400.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,380.9 |
SQYD |
7.00 |
9,666.30 |
8.00 |
11,047.20 |
5.00 |
6,904.50 |
6.00 |
8,285.40 |
| 202-02-H |
removal of guard rail
|
1,428   |
LNFT |
2.00 |
2,856.00 |
4.00 |
5,712.00 |
6.00 |
8,568.00 |
4.00 |
5,712.00 |
| 202-02-I |
removal of asphalt widening
|
23,409   |
SQYD |
3.00 |
70,227.00 |
2.00 |
46,818.00 |
3.25 |
76,079.25 |
1.50 |
35,113.50 |
| 202-02-J |
removal of temporary junction box
|
2   |
EACH |
500.00 |
1,000.00 |
5,000.00 |
10,000.00 |
2,000.00 |
4,000.00 |
2,000.00 |
4,000.00 |
| 202-02-K |
removal of temporary guardrail
|
250   |
LNFT |
2.00 |
500.00 |
6.00 |
1,500.00 |
5.00 |
1,250.00 |
4.00 |
1,000.00 |
| 202-02-L |
removal of temporary detour roads
|
2,059.0 |
LNFT |
20.00 |
41,180.00 |
8.00 |
16,472.00 |
15.00 |
30,885.00 |
33.00 |
67,947.00 |
| 202-02-M |
removal of stone check dams
|
43   |
EACH |
250.00 |
10,750.00 |
500.00 |
21,500.00 |
50.00 |
2,150.00 |
250.00 |
10,750.00 |
| 202-02-N |
removal of temporary striping (type i removable tape)
|
4.500 |
MILE |
5,300.00 |
23,850.00 |
5,500.00 |
24,750.00 |
5,500.00 |
24,750.00 |
5,280.00 |
23,760.00 |
| 203-01 |
general excavation
|
427,430   |
CUYD |
2.60 |
1,111,318.00 |
4.63 |
1,979,000.90 |
3.75 |
1,602,862.50 |
3.00 |
1,282,290.00 |
| 203-02 |
drainage excavation
|
5,813   |
CUYD |
6.00 |
34,878.00 |
10.00 |
58,130.00 |
6.00 |
34,878.00 |
12.00 |
69,756.00 |
| 203-03 |
muck excavation
|
12,801   |
CUYD |
6.00 |
76,806.00 |
7.00 |
89,607.00 |
8.00 |
102,408.00 |
12.00 |
153,612.00 |
| 203-04 |
embankment
|
398,996   |
CUYD |
3.80 |
1,516,184.80 |
4.00 |
1,595,984.00 |
6.75 |
2,693,223.00 |
6.00 |
2,393,976.00 |
| 203-05 |
nonplastic embankment
|
165   |
CUYD |
120.00 |
19,800.00 |
125.00 |
20,625.00 |
80.00 |
13,200.00 |
88.00 |
14,520.00 |
| 204-01 |
temporary sandbagging
|
8.0 |
CUYD |
500.00 |
4,000.00 |
275.00 |
2,200.00 |
300.00 |
2,400.00 |
250.00 |
2,000.00 |
| 204-02 |
temporary hay or straw bales
|
1,330   |
EACH |
5.00 |
6,650.00 |
25.00 |
33,250.00 |
20.00 |
26,600.00 |
5.00 |
6,650.00 |
| 204-03 |
temporary slope drains
|
656   |
LNFT |
10.00 |
6,560.00 |
16.00 |
10,496.00 |
20.00 |
13,120.00 |
15.00 |
9,840.00 |
| 204-04 |
temporary sediment basins
|
2   |
EACH |
500.00 |
1,000.00 |
750.00 |
1,500.00 |
500.00 |
1,000.00 |
1,000.00 |
2,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
75   |
EACH |
70.00 |
5,250.00 |
150.00 |
11,250.00 |
150.00 |
11,250.00 |
70.00 |
5,250.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
198   |
EACH |
600.00 |
118,800.00 |
500.00 |
99,000.00 |
500.00 |
99,000.00 |
250.00 |
49,500.00 |
| 204-06 |
temporary silt fencing
|
26,248   |
LNFT |
1.50 |
39,372.00 |
3.00 |
78,744.00 |
1.50 |
39,372.00 |
2.00 |
52,496.00 |
| 204-07 |
temporary stone construction entrance
|
9   |
EACH |
1,500.00 |
13,500.00 |
1,800.00 |
16,200.00 |
200.00 |
1,800.00 |
1,000.00 |
9,000.00 |
| 301-01 |
class i base course
|
6,184.1 |
CUYD |
75.00 |
463,807.50 |
63.00 |
389,598.30 |
75.00 |
463,807.50 |
80.00 |
494,728.00 |
| 302-01 |
class ii base course
|
30,379.3 |
CUYD |
70.00 |
2,126,551.00 |
62.00 |
1,883,516.60 |
75.00 |
2,278,447.50 |
79.00 |
2,399,964.70 |
| 304-01 |
lime
|
694.58 |
TON |
120.00 |
83,349.60 |
120.15 |
83,453.78 |
130.00 |
90,295.40 |
150.00 |
104,187.00 |
| 304-02-D |
lime treatment (type b) (12" thick)
|
49,000   |
SQYD |
1.50 |
73,500.00 |
3.20 |
156,800.00 |
2.00 |
98,000.00 |
4.00 |
196,000.00 |
| 305-01-A |
subgrade layer (8" thick)
|
119,700   |
SQYD |
5.00 |
598,500.00 |
6.01 |
719,397.00 |
7.00 |
837,900.00 |
6.25 |
748,125.00 |
| 305-01-B |
subgrade layer (12" thick)
|
22,344   |
SQYD |
8.00 |
178,752.00 |
7.15 |
159,759.60 |
9.75 |
217,854.00 |
7.25 |
161,994.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
5,686   |
CUYD |
50.00 |
284,300.00 |
12.00 |
68,232.00 |
30.00 |
170,580.00 |
30.00 |
170,580.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,000.0 |
CUYD |
65.00 |
130,000.00 |
25.00 |
50,000.00 |
30.00 |
60,000.00 |
15.00 |
30,000.00 |
| 502-01 |
superpave asphaltic concrete
|
42,701.3 |
TON |
58.00 |
2,476,675.40 |
50.00 |
2,135,065.00 |
55.00 |
2,348,571.50 |
58.00 |
2,476,675.40 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,262.4 |
TON |
100.00 |
126,240.00 |
100.00 |
126,240.00 |
85.00 |
107,304.00 |
101.00 |
127,502.40 |
| 601-01-M |
portland cement concrete pavement (11" thick)
|
7,478.5 |
SQYD |
56.00 |
418,796.00 |
64.00 |
478,624.00 |
60.00 |
448,710.00 |
61.00 |
456,188.50 |
| 601-02-M |
portland cement concrete pavement (11" thick)
(crossovers & turnouts) |
11,925.6 |
SQYD |
62.00 |
739,387.20 |
68.00 |
810,940.80 |
65.00 |
775,164.00 |
65.00 |
775,164.00 |
| 601-03-M |
portland cement concrete shoulder (11" thick)
|
3,032.1 |
SQYD |
60.00 |
181,926.00 |
68.00 |
206,182.80 |
60.00 |
181,926.00 |
65.00 |
197,086.50 |
| 601-04 |
portland cement concrete pavement coring
|
25   |
EACH |
100.00 |
2,500.00 |
110.00 |
2,750.00 |
100.00 |
2,500.00 |
101.00 |
2,525.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
543   |
LNFT |
60.00 |
32,580.00 |
64.00 |
34,752.00 |
55.00 |
29,865.00 |
45.00 |
24,435.00 |
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
1,234   |
LNFT |
65.00 |
80,210.00 |
67.00 |
82,678.00 |
75.00 |
92,550.00 |
58.00 |
71,572.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
218   |
LNFT |
90.00 |
19,620.00 |
95.00 |
20,710.00 |
110.00 |
23,980.00 |
79.00 |
17,222.00 |
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
208   |
LNFT |
100.00 |
20,800.00 |
105.00 |
21,840.00 |
140.00 |
29,120.00 |
100.00 |
20,800.00 |
| 701-01-O-01 |
cross drain pipe (48" rcp/pcp)(class iv)
|
309   |
LNFT |
130.00 |
40,170.00 |
132.00 |
40,788.00 |
180.00 |
55,620.00 |
165.00 |
50,985.00 |
| 701-01-O-02 |
cross drain pipe (48" rcp/pcp)(class v)
|
224   |
LNFT |
150.00 |
33,600.00 |
153.00 |
34,272.00 |
200.00 |
44,800.00 |
200.00 |
44,800.00 |
| 701-01-P |
cross drain pipe (54" rcp/pcp)
|
520   |
LNFT |
145.00 |
75,400.00 |
165.00 |
85,800.00 |
185.00 |
96,200.00 |
325.00 |
169,000.00 |
| 701-01-S |
cross drain pipe (72" rcp/pcp)
|
288   |
LNFT |
280.00 |
80,640.00 |
286.00 |
82,368.00 |
350.00 |
100,800.00 |
600.00 |
172,800.00 |
| 701-01-W |
cross drain pipe (96" rcp/pcp)
|
240   |
LNFT |
430.00 |
103,200.00 |
466.00 |
111,840.00 |
550.00 |
132,000.00 |
900.00 |
216,000.00 |
| 701-01-W-01 |
cross drain pipe (96" rcp/pcp)(class iv)
|
488   |
LNFT |
480.00 |
234,240.00 |
487.00 |
237,656.00 |
580.00 |
283,040.00 |
900.00 |
439,200.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
264   |
LNFT |
90.00 |
23,760.00 |
96.00 |
25,344.00 |
120.00 |
31,680.00 |
92.00 |
24,288.00 |
| 701-02-J |
cross drain pipe arch (60" equiv. rcpa)
|
712   |
LNFT |
230.00 |
163,760.00 |
233.00 |
165,896.00 |
240.00 |
170,880.00 |
225.00 |
160,200.00 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
932   |
LNFT |
42.00 |
39,144.00 |
45.00 |
41,940.00 |
45.00 |
41,940.00 |
41.00 |
38,212.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
172   |
LNFT |
44.00 |
7,568.00 |
48.00 |
8,256.00 |
60.00 |
10,320.00 |
48.00 |
8,256.00 |
| 701-05-G |
side drain pipe (18")
|
1,082   |
LNFT |
40.00 |
43,280.00 |
42.00 |
45,444.00 |
45.00 |
48,690.00 |
39.00 |
42,198.00 |
| 701-05-I |
side drain pipe (24")
|
706   |
LNFT |
50.00 |
35,300.00 |
53.00 |
37,418.00 |
75.00 |
52,950.00 |
48.00 |
33,888.00 |
| 701-05-K |
side drain pipe (30")
|
112   |
LNFT |
75.00 |
8,400.00 |
80.00 |
8,960.00 |
100.00 |
11,200.00 |
55.00 |
6,160.00 |
| 701-15 |
concrete collar
|
2   |
EACH |
1,000.00 |
2,000.00 |
1,100.00 |
2,200.00 |
1,500.00 |
3,000.00 |
1,200.00 |
2,400.00 |
| 702-03-A |
catch basins (cb-01)
|
14   |
EACH |
2,400.00 |
33,600.00 |
3,400.00 |
47,600.00 |
3,500.00 |
49,000.00 |
2,000.00 |
28,000.00 |
| 702-03-B |
catch basins (cb-02)
|
5   |
EACH |
4,000.00 |
20,000.00 |
4,300.00 |
21,500.00 |
4,500.00 |
22,500.00 |
3,000.00 |
15,000.00 |
| 702-03-I |
catch basins (cb-62)
|
2   |
EACH |
4,000.00 |
8,000.00 |
5,800.00 |
11,600.00 |
5,000.00 |
10,000.00 |
5,000.00 |
10,000.00 |
| 703-02 |
shoulder outlet underdrains
|
264   |
EACH |
350.00 |
92,400.00 |
10.00 |
2,640.00 |
350.00 |
92,400.00 |
515.00 |
135,960.00 |
| 703-03-A |
perforated pipe underdrains (4")
|
64,951   |
LNFT |
6.50 |
422,181.50 |
0.50 |
32,475.50 |
4.75 |
308,517.25 |
9.55 |
620,282.05 |
| 703-03-B |
perforated pipe underdrains (6")
|
2,331   |
LNFT |
10.00 |
23,310.00 |
0.50 |
1,165.50 |
15.00 |
34,965.00 |
12.55 |
29,254.05 |
| 703-04 |
nonperforated pipe underdrains
|
244   |
LNFT |
14.00 |
3,416.00 |
27.00 |
6,588.00 |
16.00 |
3,904.00 |
1.50 |
366.00 |
| 704-03 |
blocked out guard rail
|
693.8 |
LNFT |
15.00 |
10,407.00 |
16.00 |
11,100.80 |
17.00 |
11,794.60 |
16.50 |
11,447.70 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
38.00 |
3,800.00 |
40.00 |
4,000.00 |
41.00 |
4,100.00 |
40.00 |
4,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,500.00 |
6,000.00 |
1,600.00 |
6,400.00 |
2,100.00 |
8,400.00 |
2,000.00 |
8,000.00 |
| 705-09 |
rebuilt fence
|
598   |
LNFT |
15.00 |
8,970.00 |
16.00 |
9,568.00 |
8.00 |
4,784.00 |
20.00 |
11,960.00 |
| 706-01-A |
concrete walk (4" thick)
|
380.5 |
SQYD |
35.00 |
13,317.50 |
45.00 |
17,122.50 |
34.00 |
12,937.00 |
45.00 |
17,122.50 |
| 706-02-C |
concrete drive (6" thick)
|
3,482.9 |
SQYD |
40.00 |
139,316.00 |
48.00 |
167,179.20 |
38.00 |
132,350.20 |
55.00 |
191,559.50 |
| 707-01 |
concrete curb
|
915.9 |
LNFT |
3.00 |
2,747.70 |
9.00 |
8,243.10 |
12.00 |
10,990.80 |
8.50 |
7,785.15 |
| 708-01 |
right-of-way monument
|
253   |
EACH |
120.00 |
30,360.00 |
110.00 |
27,830.00 |
300.00 |
75,900.00 |
150.00 |
37,950.00 |
| 708-02 |
right-of-way monument witness post
|
253   |
EACH |
120.00 |
30,360.00 |
110.00 |
27,830.00 |
300.00 |
75,900.00 |
150.00 |
37,950.00 |
| 711-02-C |
riprap (30 lb)
|
590   |
CUYD |
90.00 |
53,100.00 |
90.00 |
53,100.00 |
80.00 |
47,200.00 |
105.00 |
61,950.00 |
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
4,921   |
SQYD |
37.00 |
182,077.00 |
67.00 |
329,707.00 |
33.00 |
162,393.00 |
70.00 |
344,470.00 |
| 712-04 |
flexible revetment
|
11,781   |
SQYD |
40.00 |
471,240.00 |
42.00 |
494,802.00 |
50.00 |
589,050.00 |
45.00 |
530,145.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
140,000.00 |
140,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
375,000.00 |
375,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.000 |
MILE |
500.00 |
500.00 |
175.00 |
175.00 |
550.00 |
550.00 |
250.00 |
250.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.000 |
MILE |
300.00 |
600.00 |
280.00 |
560.00 |
300.00 |
600.00 |
264.00 |
528.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
2.000 |
MILE |
700.00 |
1,400.00 |
670.00 |
1,340.00 |
650.00 |
1,300.00 |
633.00 |
1,266.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
1.500 |
MILE |
12,000.00 |
18,000.00 |
12,500.00 |
18,750.00 |
12,000.00 |
18,000.00 |
11,880.00 |
17,820.00 |
| 716-01-A |
mulch (vegetative)
|
193.13 |
ACRE |
600.00 |
115,878.00 |
635.00 |
122,637.55 |
650.00 |
125,534.50 |
600.00 |
115,878.00 |
| 717-01 |
seeding
|
3,650   |
LB |
7.00 |
25,550.00 |
8.00 |
29,200.00 |
10.00 |
36,500.00 |
7.00 |
25,550.00 |
| 718-01 |
fertilizer
|
81,096   |
LB |
0.30 |
24,328.80 |
0.32 |
25,950.72 |
0.35 |
28,383.60 |
0.30 |
24,328.80 |
| 718-02 |
agricultural lime
|
24.8 |
TON |
100.00 |
2,480.00 |
105.00 |
2,604.00 |
200.00 |
4,960.00 |
99.00 |
2,455.20 |
| 720-01-A |
erosion control system, slope protection (type a)
|
162,736   |
SQYD |
1.00 |
162,736.00 |
1.05 |
170,872.80 |
1.50 |
244,104.00 |
0.99 |
161,108.64 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
24,319   |
SQYD |
1.30 |
31,614.70 |
1.32 |
32,101.08 |
1.70 |
41,342.30 |
1.25 |
30,398.75 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
23,128   |
SQYD |
1.30 |
30,066.40 |
1.32 |
30,528.96 |
1.70 |
39,317.60 |
1.25 |
28,910.00 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
1,611   |
SQYD |
2.00 |
3,222.00 |
2.07 |
3,334.77 |
2.20 |
3,544.20 |
1.95 |
3,141.45 |
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
1,533   |
SQYD |
2.00 |
3,066.00 |
2.07 |
3,173.31 |
2.50 |
3,832.50 |
1.95 |
2,989.35 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
35,000.00 |
35,000.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
50   |
SQYD |
85.00 |
4,250.00 |
115.00 |
5,750.00 |
150.00 |
7,500.00 |
75.00 |
3,750.00 |
| 726-01 |
bedding material
|
2,286.3 |
CUYD |
50.00 |
114,315.00 |
53.00 |
121,173.90 |
60.00 |
137,178.00 |
65.00 |
148,609.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
2,000,000.00 |
2,000,000.00 |
2,000,000.00 |
2,000,000.00 |
2,000,000.00 |
2,000,000.00 |
2,100,000.00 |
2,100,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
65.00 |
1,040.00 |
58.00 |
928.00 |
80.00 |
1,280.00 |
70.00 |
1,120.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,308   |
EACH |
5.00 |
11,540.00 |
5.00 |
11,540.00 |
5.00 |
11,540.00 |
4.90 |
11,309.20 |
| 732-01-A |
plastic pavement striping (4" width)
|
13,948   |
LNFT |
0.40 |
5,579.20 |
0.42 |
5,858.16 |
0.45 |
6,276.60 |
0.40 |
5,579.20 |
| 732-01-C |
plastic pavement striping (8" width)
|
880   |
LNFT |
0.80 |
704.00 |
0.85 |
748.00 |
0.90 |
792.00 |
0.80 |
704.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
754   |
LNFT |
2.40 |
1,809.60 |
2.54 |
1,915.16 |
2.50 |
1,885.00 |
2.40 |
1,809.60 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
25.838 |
MILE |
2,000.00 |
51,676.00 |
2,100.00 |
54,259.80 |
2,100.00 |
54,259.80 |
1,990.00 |
51,417.62 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
14.131 |
MILE |
700.00 |
9,891.70 |
700.00 |
9,891.70 |
700.00 |
9,891.70 |
660.00 |
9,326.46 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
17   |
EACH |
130.00 |
2,210.00 |
132.00 |
2,244.00 |
150.00 |
2,550.00 |
125.00 |
2,125.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
EACH |
140.00 |
700.00 |
143.00 |
715.00 |
160.00 |
800.00 |
135.00 |
675.00 |
| 732-05 |
removal of existing markings
|
2.000 |
MILE |
4,500.00 |
9,000.00 |
4,800.00 |
9,600.00 |
5,000.00 |
10,000.00 |
4,500.00 |
9,000.00 |
| 735-01 |
mailboxes
|
45   |
EACH |
1.00 |
45.00 |
12.00 |
540.00 |
50.00 |
2,250.00 |
1.00 |
45.00 |
| 735-02 |
mailbox supports (single)
|
37   |
EACH |
140.00 |
5,180.00 |
130.00 |
4,810.00 |
150.00 |
5,550.00 |
200.00 |
7,400.00 |
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
200.00 |
400.00 |
300.00 |
600.00 |
200.00 |
400.00 |
300.00 |
600.00 |
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
400.00 |
400.00 |
600.00 |
600.00 |
400.00 |
400.00 |
500.00 |
500.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
250,000.00 |
250,000.00 |
250,000.00 |
250,000.00 |
200,000.00 |
200,000.00 |
400,000.00 |
400,000.00 |
| 804-01-C |
precast concrete piles (16")
|
3,655   |
LNFT |
34.00 |
124,270.00 |
52.00 |
190,060.00 |
40.00 |
146,200.00 |
35.00 |
127,925.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
1,000.00 |
2,000.00 |
1.00 |
2.00 |
100.00 |
200.00 |
1.00 |
2.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
377.13 |
CUYD |
850.00 |
320,560.50 |
950.00 |
358,273.50 |
700.00 |
263,991.00 |
1,500.00 |
565,695.00 |
| 805-01-F |
class a concrete (bents)
|
106.90 |
CUYD |
800.00 |
85,520.00 |
850.00 |
90,865.00 |
500.00 |
53,450.00 |
600.00 |
64,140.00 |
| 805-03 |
class aa concrete
|
457.45 |
CUYD |
450.00 |
205,852.50 |
688.00 |
314,725.60 |
600.00 |
274,470.00 |
475.00 |
217,288.75 |
| 806-01 |
deformed reinforcing steel
|
126,123   |
LB |
0.70 |
88,286.10 |
1.00 |
126,123.00 |
1.00 |
126,123.00 |
5.50 |
693,676.50 |
| 810-01 |
concrete railing (barrier)
|
760.18 |
LNFT |
47.00 |
35,728.46 |
59.00 |
44,850.62 |
50.00 |
38,009.00 |
65.00 |
49,411.70 |
| 813-01 |
concrete approach slabs
|
546.77 |
SQYD |
160.00 |
87,483.20 |
200.00 |
109,354.00 |
150.00 |
82,015.50 |
185.00 |
101,152.45 |
| S-002 |
completion of catch basins
|
lump |
LUMP |
35,000.00 |
35,000.00 |
50,000.00 |
50,000.00 |
5,000.00 |
5,000.00 |
75,000.00 |
75,000.00 |
| S-003 |
sandblasting and painting of catch basin grates
|
lump |
LUMP |
12,000.00 |
12,000.00 |
8,000.00 |
8,000.00 |
15,000.00 |
15,000.00 |
45,000.00 |
45,000.00 |
| S-004 |
maintenance of existing temporary erosion control
features |
lump |
LUMP |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
75,000.00 |
75,000.00 |
| S-005 |
rumble strips (ground-in)
|
13.0 |
MILE |
600.00 |
7,800.00 |
700.00 |
9,100.00 |
600.00 |
7,800.00 |
680.00 |
8,840.00 |
| S-006 |
redressing slopes and ditches
|
110,000   |
SQYD |
0.50 |
55,000.00 |
2.25 |
247,500.00 |
2.00 |
220,000.00 |
4.00 |
440,000.00 |
| S-007 |
borrow, (vehicular measurement)
|
150,000   |
CUYD |
5.10 |
765,000.00 |
8.00 |
1,200,000.00 |
6.50 |
975,000.00 |
8.00 |
1,200,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
20,119,608.66 |
|
20,703,295.21 |
|
21,826,155.30 |
|
24,238,872.52 |
|