| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - RICHARD PRICE CONTRACTING CO, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-C |
removal of portland cement concrete pavement
|
181   |
SQYD |
10.00 |
1,810.00 |
11.00 |
1,991.00 |
7.00 |
1,267.00 |
|
|
| 202-02-D |
removal of concrete walks & drives or asphalt drives
|
6,202   |
SQYD |
10.00 |
62,020.00 |
5.00 |
31,010.00 |
5.50 |
34,111.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
25,403.4 |
SQYD |
4.00 |
101,613.60 |
7.00 |
177,823.80 |
5.50 |
139,718.70 |
|
|
| 202-02-H |
removal of guard rail
|
445   |
LNFT |
5.00 |
2,225.00 |
4.00 |
1,780.00 |
5.00 |
2,225.00 |
|
|
| 203-01 |
general excavation
|
11,663   |
CUYD |
9.00 |
104,967.00 |
8.00 |
93,304.00 |
8.50 |
99,135.50 |
|
|
| 203-04 |
embankment
|
4,092   |
CUYD |
12.00 |
49,104.00 |
8.00 |
32,736.00 |
12.00 |
49,104.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
150   |
EACH |
11.00 |
1,650.00 |
8.00 |
1,200.00 |
9.00 |
1,350.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
EACH |
150.00 |
1,500.00 |
100.00 |
1,000.00 |
100.00 |
1,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
20,000   |
LNFT |
1.50 |
30,000.00 |
1.50 |
30,000.00 |
2.00 |
40,000.00 |
|
|
| 302-02-C |
class ii base course (10" thick)
|
29,412.2 |
SQYD |
15.00 |
441,183.00 |
18.50 |
544,125.70 |
18.70 |
550,008.14 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,200.0 |
CUYD |
60.00 |
72,000.00 |
30.00 |
36,000.00 |
40.00 |
48,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
28,242.2 |
TON |
61.00 |
1,722,774.20 |
61.50 |
1,736,895.30 |
67.50 |
1,906,348.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
100.0 |
TON |
150.00 |
15,000.00 |
100.00 |
10,000.00 |
165.00 |
16,500.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
29,948   |
SQYD |
1.40 |
41,927.20 |
1.50 |
44,922.00 |
1.55 |
46,419.40 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 375   |
CUYD |
7.00 |
- 2,625.00 |
6.00 |
- 2,250.00 |
7.00 |
- 2,625.00 |
|
|
| 601-02-K |
portland cement concrete pavement (10" thick)
(crossovers & turnouts) |
820.1 |
SQYD |
55.00 |
45,105.50 |
60.00 |
49,206.00 |
58.00 |
47,565.80 |
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
12   |
LNFT |
85.00 |
1,020.00 |
110.00 |
1,320.00 |
84.00 |
1,008.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
432   |
LNFT |
55.00 |
23,760.00 |
65.00 |
28,080.00 |
39.00 |
16,848.00 |
|
|
| 701-05-G-01 |
side drain pipe (18")(bridge drain)
|
96   |
LNFT |
65.00 |
6,240.00 |
38.00 |
3,648.00 |
160.00 |
15,360.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
118   |
LNFT |
55.00 |
6,490.00 |
100.00 |
11,800.00 |
56.00 |
6,608.00 |
|
|
| 701-05-K |
side drain pipe (30")
|
12   |
LNFT |
90.00 |
1,080.00 |
215.00 |
2,580.00 |
84.00 |
1,008.00 |
|
|
| 701-06-D |
side drain pipe arch (24" equiv.)
|
14   |
LNFT |
110.00 |
1,540.00 |
175.00 |
2,450.00 |
73.00 |
1,022.00 |
|
|
| 701-14 |
cleaning existing pipes
|
100   |
LNFT |
3.50 |
350.00 |
18.00 |
1,800.00 |
9.00 |
900.00 |
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
1,200.00 |
2,400.00 |
1,000.00 |
2,000.00 |
600.00 |
1,200.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
17   |
EACH |
3,000.00 |
51,000.00 |
5,400.00 |
91,800.00 |
2,200.00 |
37,400.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
2   |
EACH |
4,000.00 |
8,000.00 |
5,200.00 |
10,400.00 |
3,000.00 |
6,000.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
3   |
EACH |
4,000.00 |
12,000.00 |
5,700.00 |
17,100.00 |
3,000.00 |
9,000.00 |
|
|
| 702-04-B |
adjusting catch basins
|
7   |
EACH |
700.00 |
4,900.00 |
750.00 |
5,250.00 |
1,000.00 |
7,000.00 |
|
|
| 702-06-A |
side drain end treatment (1 barrel, 18")
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
|
|
| 704-03 |
blocked out guard rail
|
250.0 |
LNFT |
20.00 |
5,000.00 |
20.00 |
5,000.00 |
19.00 |
4,750.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
50.00 |
5,000.00 |
60.00 |
6,000.00 |
50.00 |
5,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,200.00 |
8,800.00 |
2,420.00 |
9,680.00 |
|
|
| 706-02-D |
concrete drive (8" thick)
|
6,220.8 |
SQYD |
55.00 |
342,144.00 |
55.00 |
342,144.00 |
54.00 |
335,923.20 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
176.9 |
SQYD |
50.00 |
8,845.00 |
55.00 |
9,729.50 |
51.00 |
9,021.90 |
|
|
| 707-03 |
combination concrete curb & gutter
|
8,791.3 |
LNFT |
25.00 |
219,782.50 |
18.00 |
158,243.40 |
21.78 |
191,474.51 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
260,000.00 |
260,000.00 |
185,000.00 |
185,000.00 |
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
400   |
LNFT |
0.25 |
100.00 |
0.25 |
100.00 |
0.25 |
100.00 |
|
|
| 713-03-B |
temporary pavement markings (6" width)
|
100   |
LNFT |
0.35 |
35.00 |
0.35 |
35.00 |
0.35 |
35.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
400   |
LNFT |
0.45 |
180.00 |
0.50 |
200.00 |
0.50 |
200.00 |
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
100   |
LNFT |
0.95 |
95.00 |
0.75 |
75.00 |
0.70 |
70.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
400   |
LNFT |
1.50 |
600.00 |
1.30 |
520.00 |
1.35 |
540.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.076 |
MILE |
320.00 |
24.32 |
15,000.00 |
1,140.00 |
3,500.00 |
266.00 |
|
|
| 713-04-A-01 |
temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable) |
0.600 |
MILE |
17,000.00 |
10,200.00 |
15,000.00 |
9,000.00 |
3,500.00 |
2,100.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.750 |
MILE |
370.00 |
5,087.50 |
350.00 |
4,812.50 |
358.00 |
4,922.50 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.076 |
MILE |
1,250.00 |
95.00 |
1,200.00 |
91.20 |
1,162.00 |
88.31 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
0.600 |
MILE |
15,000.00 |
9,000.00 |
15,000.00 |
9,000.00 |
14,520.00 |
8,712.00 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
12   |
EACH |
60.00 |
720.00 |
60.00 |
720.00 |
58.00 |
696.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
12   |
EACH |
60.00 |
720.00 |
60.00 |
720.00 |
58.00 |
696.00 |
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
40   |
EACH |
280.00 |
11,200.00 |
200.00 |
8,000.00 |
275.00 |
11,000.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
100   |
SQYD |
55.00 |
5,500.00 |
55.00 |
5,500.00 |
61.00 |
6,100.00 |
|
|
| 726-01 |
bedding material
|
400.0 |
CUYD |
40.00 |
16,000.00 |
65.00 |
26,000.00 |
35.00 |
14,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
450,000.00 |
450,000.00 |
529,000.00 |
529,000.00 |
434,000.00 |
434,000.00 |
|
|
| 729-01 |
sign (type a)
|
6.0 |
SQFT |
30.00 |
180.00 |
28.00 |
168.00 |
30.00 |
180.00 |
|
|
| 729-08-A |
mounting (2 1/2" post)
|
2   |
EACH |
1,400.00 |
2,800.00 |
1,300.00 |
2,600.00 |
1,450.00 |
2,900.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
80.00 |
320.00 |
80.00 |
320.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,200   |
EACH |
7.00 |
8,400.00 |
6.00 |
7,200.00 |
6.50 |
7,800.00 |
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
400   |
LNFT |
0.70 |
280.00 |
0.70 |
280.00 |
0.75 |
300.00 |
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
400   |
LNFT |
1.00 |
400.00 |
1.00 |
400.00 |
1.10 |
440.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
400   |
LNFT |
1.50 |
600.00 |
1.40 |
560.00 |
1.50 |
600.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
100   |
LNFT |
4.50 |
450.00 |
4.00 |
400.00 |
4.30 |
430.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.107 |
MILE |
3,700.00 |
18,895.90 |
3,600.00 |
18,385.20 |
3,630.00 |
18,538.41 |
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.642 |
MILE |
7,500.00 |
4,815.00 |
7,000.00 |
4,494.00 |
7,260.00 |
4,660.92 |
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.289 |
MILE |
22,000.00 |
6,358.00 |
21,000.00 |
6,069.00 |
21,780.00 |
6,294.42 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.209 |
MILE |
900.00 |
1,088.10 |
900.00 |
1,088.10 |
944.00 |
1,141.29 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
46   |
EACH |
200.00 |
9,200.00 |
200.00 |
9,200.00 |
209.00 |
9,614.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
31   |
EACH |
250.00 |
7,750.00 |
220.00 |
6,820.00 |
231.00 |
7,161.00 |
|
|
| 735-01 |
mailboxes
|
22   |
EACH |
2.00 |
44.00 |
5.00 |
110.00 |
3.00 |
66.00 |
|
|
| 735-02 |
mailbox supports (single)
|
10   |
EACH |
150.00 |
1,500.00 |
130.00 |
1,300.00 |
138.00 |
1,380.00 |
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
200.00 |
400.00 |
190.00 |
380.00 |
350.00 |
700.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
300.00 |
600.00 |
280.00 |
560.00 |
286.00 |
572.00 |
|
|
| 739-01 |
hydro-seeding
|
15.00 |
ACRE |
1,100.00 |
16,500.00 |
1,000.00 |
15,000.00 |
1,265.00 |
18,975.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
150,000.00 |
150,000.00 |
70,000.00 |
70,000.00 |
99,000.00 |
99,000.00 |
|
|
| 804-01-C |
precast concrete piles (16")
|
960   |
LNFT |
55.00 |
52,800.00 |
43.45 |
41,712.00 |
55.00 |
52,800.00 |
|
|
| 804-01-D |
precast concrete piles (18")
|
1,040   |
LNFT |
75.00 |
78,000.00 |
49.50 |
51,480.00 |
71.50 |
74,360.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
600.00 |
1,200.00 |
1,000.00 |
2,000.00 |
550.00 |
1,100.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
60.90 |
CUYD |
1,100.00 |
66,990.00 |
1,030.00 |
62,727.00 |
1,100.00 |
66,990.00 |
|
|
| 805-03 |
class aa concrete
|
196.60 |
CUYD |
850.00 |
167,110.00 |
595.00 |
116,977.00 |
825.00 |
162,195.00 |
|
|
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
495.0 |
LNFT |
90.00 |
44,550.00 |
90.80 |
44,946.00 |
88.00 |
43,560.00 |
|
|
| 805-09 |
expansion joint seal
|
120.00 |
LNFT |
240.00 |
28,800.00 |
43.50 |
5,220.00 |
231.00 |
27,720.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
65,206   |
LB |
0.90 |
58,685.40 |
0.70 |
45,644.20 |
0.88 |
57,381.28 |
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
16,000.00 |
16,000.00 |
5,300.00 |
5,300.00 |
15,400.00 |
15,400.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
1,136.16 |
LNFT |
55.00 |
62,488.80 |
48.00 |
54,535.68 |
52.80 |
59,989.24 |
|
|
| 813-01 |
concrete approach slabs
|
100.76 |
SQYD |
250.00 |
25,190.00 |
203.60 |
20,514.73 |
247.50 |
24,938.10 |
|
|
| S-001 |
pg-drain
|
74   |
EACH |
600.00 |
44,400.00 |
1,400.00 |
103,600.00 |
950.00 |
70,300.00 |
|
|
| S-002 |
saw cutting concrete or asphaltic and stablized base
|
4,816   |
LNFT |
2.00 |
9,632.00 |
3.00 |
14,448.00 |
9.00 |
43,344.00 |
|
|
| S-003 |
cleaning existing ditches
|
3,805   |
LNFT |
2.00 |
7,610.00 |
6.00 |
22,830.00 |
3.00 |
11,415.00 |
|
|
| S-004 |
dynamic message sign unit
|
2   |
EACH |
11,000.00 |
22,000.00 |
12,500.00 |
25,000.00 |
21,600.00 |
43,200.00 |
|
|
| S-005 |
paved gutter
|
1,840   |
LNFT |
40.00 |
73,600.00 |
58.00 |
106,720.00 |
17.25 |
31,740.00 |
|
|
| S-007 |
impact attenuators (construction zone)
|
2   |
EACH |
23,000.00 |
46,000.00 |
20,000.00 |
40,000.00 |
22,000.00 |
44,000.00 |
|
|
| S-008 |
vibration monitoring
|
lump |
LUMP |
15,000.00 |
15,000.00 |
4,650.00 |
4,650.00 |
5,500.00 |
5,500.00 |
|
|
| S-101 |
removal of concrete
|
lump |
LUMP |
70,000.00 |
70,000.00 |
65,000.00 |
65,000.00 |
6,600.00 |
6,600.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,156,500.02 |
|
5,342,941.31 |
|
5,343,463.12 |
|
|
|