February 06, 2014 Error processing SSI file

Letting of 7/27/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 013-11-0029
Parish: ST TAMMANY
Routes: US 190
Description: ABITA RIVER BRIDGE TO US 190 BUSINESS
Type Const: grading, drainage structures, class ii base course, cold planing asphaltic pavement,
superpave asphaltic concrete pavement, pccp, ppc girder span bridge and related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC. $5,156,500.02
202179 BOH BROS. CONSTRUCTION CO., LLC. $5,342,941.31
314807 RICHARD PRICE CONTRACTING CO, LLC $5,343,463.12
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.
- 3 -
RICHARD PRICE CONTRACTING CO, LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-C removal of portland cement concrete pavement 181      SQYD 10.00 1,810.00 11.00 1,991.00 7.00 1,267.00    
202-02-D removal of concrete walks & drives or asphalt drives 6,202      SQYD 10.00 62,020.00 5.00 31,010.00 5.50 34,111.00    
202-02-G removal of surfacing & stabilized base 25,403.4    SQYD 4.00 101,613.60 7.00 177,823.80 5.50 139,718.70    
202-02-H removal of guard rail 445      LNFT 5.00 2,225.00 4.00 1,780.00 5.00 2,225.00    
203-01 general excavation 11,663      CUYD 9.00 104,967.00 8.00 93,304.00 8.50 99,135.50    
203-04 embankment 4,092      CUYD 12.00 49,104.00 8.00 32,736.00 12.00 49,104.00    
204-02 temporary hay or straw bales 150      EACH 11.00 1,650.00 8.00 1,200.00 9.00 1,350.00    
204-05-A temporary sediment check dams (hay) 10      EACH 150.00 1,500.00 100.00 1,000.00 100.00 1,000.00    
204-06 temporary silt fencing 20,000      LNFT 1.50 30,000.00 1.50 30,000.00 2.00 40,000.00    
302-02-C class ii base course (10" thick) 29,412.2    SQYD 15.00 441,183.00 18.50 544,125.70 18.70 550,008.14    
402-01 traffic maintenance aggregate (vehicular measurement) 1,200.0    CUYD 60.00 72,000.00 30.00 36,000.00 40.00 48,000.00    
502-01 superpave asphaltic concrete 28,242.2    TON 61.00 1,722,774.20 61.50 1,736,895.30 67.50 1,906,348.50    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
100.0    TON 150.00 15,000.00 100.00 10,000.00 165.00 16,500.00    
509-01 cold planing asphaltic pavement 29,948      SQYD 1.40 41,927.20 1.50 44,922.00 1.55 46,419.40    
509-02 contractor retained reclaimed asphaltic pavement - 375      CUYD 7.00 - 2,625.00 6.00 - 2,250.00 7.00 - 2,625.00    
601-02-K portland cement concrete pavement (10" thick)
(crossovers & turnouts)
820.1    SQYD 55.00 45,105.50 60.00 49,206.00 58.00 47,565.80    
701-03-K storm drain pipe (30" rcp/pcp) 12      LNFT 85.00 1,020.00 110.00 1,320.00 84.00 1,008.00    
701-05-G side drain pipe (18") 432      LNFT 55.00 23,760.00 65.00 28,080.00 39.00 16,848.00    
701-05-G-01 side drain pipe (18")(bridge drain) 96      LNFT 65.00 6,240.00 38.00 3,648.00 160.00 15,360.00    
701-05-I side drain pipe (24") 118      LNFT 55.00 6,490.00 100.00 11,800.00 56.00 6,608.00    
701-05-K side drain pipe (30") 12      LNFT 90.00 1,080.00 215.00 2,580.00 84.00 1,008.00    
701-06-D side drain pipe arch (24" equiv.) 14      LNFT 110.00 1,540.00 175.00 2,450.00 73.00 1,022.00    
701-14 cleaning existing pipes 100      LNFT 3.50 350.00 18.00 1,800.00 9.00 900.00    
701-15 concrete collar 2      EACH 1,200.00 2,400.00 1,000.00 2,000.00 600.00 1,200.00    
702-03-A catch basins (cb-01) 17      EACH 3,000.00 51,000.00 5,400.00 91,800.00 2,200.00 37,400.00    
702-03-B catch basins (cb-02) 2      EACH 4,000.00 8,000.00 5,200.00 10,400.00 3,000.00 6,000.00    
702-03-C catch basins (cb-06) 3      EACH 4,000.00 12,000.00 5,700.00 17,100.00 3,000.00 9,000.00    
702-04-B adjusting catch basins 7      EACH 700.00 4,900.00 750.00 5,250.00 1,000.00 7,000.00    
702-06-A side drain end treatment (1 barrel, 18") 1      EACH 1,500.00 1,500.00 1,500.00 1,500.00 2,000.00 2,000.00    
704-03 blocked out guard rail 250.0    LNFT 20.00 5,000.00 20.00 5,000.00 19.00 4,750.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 50.00 5,000.00 60.00 6,000.00 50.00 5,000.00    
704-11-A guard rail end treatment (flared) 4      EACH 2,500.00 10,000.00 2,200.00 8,800.00 2,420.00 9,680.00    
706-02-D concrete drive (8" thick) 6,220.8    SQYD 55.00 342,144.00 55.00 342,144.00 54.00 335,923.20    
706-03-A incidental concrete paving (4" thick) 176.9    SQYD 50.00 8,845.00 55.00 9,729.50 51.00 9,021.90    
707-03 combination concrete curb & gutter 8,791.3    LNFT 25.00 219,782.50 18.00 158,243.40 21.78 191,474.51    
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 260,000.00 260,000.00 185,000.00 185,000.00    
713-03-A temporary pavement markings (4" width) 400      LNFT 0.25 100.00 0.25 100.00 0.25 100.00    
713-03-B temporary pavement markings (6" width) 100      LNFT 0.35 35.00 0.35 35.00 0.35 35.00    
713-03-C temporary pavement markings (8" width) 400      LNFT 0.45 180.00 0.50 200.00 0.50 200.00    
713-03-D temporary pavement markings (12" width) 100      LNFT 0.95 95.00 0.75 75.00 0.70 70.00    
713-03-E temporary pavement markings (24" width) 400      LNFT 1.50 600.00 1.30 520.00 1.35 540.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.076  MILE 320.00 24.32 15,000.00 1,140.00 3,500.00 266.00    
713-04-A-01 temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable)
0.600  MILE 17,000.00 10,200.00 15,000.00 9,000.00 3,500.00 2,100.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
13.750  MILE 370.00 5,087.50 350.00 4,812.50 358.00 4,922.50    
713-05-A temporary pavement markings (solid line)(4" width) 0.076  MILE 1,250.00 95.00 1,200.00 91.20 1,162.00 88.31    
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
0.600  MILE 15,000.00 9,000.00 15,000.00 9,000.00 14,520.00 8,712.00    
713-06-A temporary pavement legends and symbols (arrow) 12      EACH 60.00 720.00 60.00 720.00 58.00 696.00    
713-06-C temporary pavement legends and symbols (only) 12      EACH 60.00 720.00 60.00 720.00 58.00 696.00    
713-09 temporary precast concrete barrier (department
furnished)
40      EACH 280.00 11,200.00 200.00 8,000.00 275.00 11,000.00    
722-01 project site laboratory 1      EACH 25,000.00 25,000.00 10,000.00 10,000.00 10,000.00 10,000.00    
724-01-A pavement patching (6" minimum thickness) 100      SQYD 55.00 5,500.00 55.00 5,500.00 61.00 6,100.00    
726-01 bedding material 400.0    CUYD 40.00 16,000.00 65.00 26,000.00 35.00 14,000.00    
727-01 mobilization lump      LUMP 450,000.00 450,000.00 529,000.00 529,000.00 434,000.00 434,000.00    
729-01 sign (type a) 6.0    SQFT 30.00 180.00 28.00 168.00 30.00 180.00    
729-08-A mounting (2 1/2" post) 2      EACH 1,400.00 2,800.00 1,300.00 2,600.00 1,450.00 2,900.00    
729-16-C object marker assembly (type 3) 4      EACH 80.00 320.00 80.00 320.00 80.00 320.00    
731-02 reflectorized raised pavement markers 1,200      EACH 7.00 8,400.00 6.00 7,200.00 6.50 7,800.00    
732-01-A plastic pavement striping (4" width) 400      LNFT 0.70 280.00 0.70 280.00 0.75 300.00    
732-01-B plastic pavement striping (6" width) 400      LNFT 1.00 400.00 1.00 400.00 1.10 440.00    
732-01-C plastic pavement striping (8" width) 400      LNFT 1.50 600.00 1.40 560.00 1.50 600.00    
732-01-E plastic pavement striping (24" width) 100      LNFT 4.50 450.00 4.00 400.00 4.30 430.00    
732-02-A plastic pavement striping (solid line) (4" width) 5.107  MILE 3,700.00 18,895.90 3,600.00 18,385.20 3,630.00 18,538.41    
732-02-C plastic pavement striping (solid line) (8" width) 0.642  MILE 7,500.00 4,815.00 7,000.00 4,494.00 7,260.00 4,660.92    
732-02-E plastic pavement striping (solid line) (24" width) 0.289  MILE 22,000.00 6,358.00 21,000.00 6,069.00 21,780.00 6,294.42    
732-03-A plastic pavement striping (broken line)(4" width) 1.209  MILE 900.00 1,088.10 900.00 1,088.10 944.00 1,141.29    
732-04-A plastic pavement legends & symbols (arrow) 46      EACH 200.00 9,200.00 200.00 9,200.00 209.00 9,614.00    
732-04-C plastic pavement legends & symbols (only) 31      EACH 250.00 7,750.00 220.00 6,820.00 231.00 7,161.00    
735-01 mailboxes 22      EACH 2.00 44.00 5.00 110.00 3.00 66.00    
735-02 mailbox supports (single) 10      EACH 150.00 1,500.00 130.00 1,300.00 138.00 1,380.00    
735-03 mailbox supports (double) 2      EACH 200.00 400.00 190.00 380.00 350.00 700.00    
735-04 mailbox supports (multiple) 2      EACH 300.00 600.00 280.00 560.00 286.00 572.00    
739-01 hydro-seeding 15.00   ACRE 1,100.00 16,500.00 1,000.00 15,000.00 1,265.00 18,975.00    
740-01 construction layout lump      LUMP 150,000.00 150,000.00 70,000.00 70,000.00 99,000.00 99,000.00    
804-01-C precast concrete piles (16") 960      LNFT 55.00 52,800.00 43.45 41,712.00 55.00 52,800.00    
804-01-D precast concrete piles (18") 1,040      LNFT 75.00 78,000.00 49.50 51,480.00 71.50 74,360.00    
804-12 loading permanent piles 2      EACH 600.00 1,200.00 1,000.00 2,000.00 550.00 1,100.00    
805-01-F class a concrete (bents) 60.90   CUYD 1,100.00 66,990.00 1,030.00 62,727.00 1,100.00 66,990.00    
805-03 class aa concrete 196.60   CUYD 850.00 167,110.00 595.00 116,977.00 825.00 162,195.00    
805-08-B precast-prestressed concrete girders (type ii) 495.0    LNFT 90.00 44,550.00 90.80 44,946.00 88.00 43,560.00    
805-09 expansion joint seal 120.00   LNFT 240.00 28,800.00 43.50 5,220.00 231.00 27,720.00    
806-01 deformed reinforcing steel 65,206      LB 0.90 58,685.40 0.70 45,644.20 0.88 57,381.28    
807-06 structural metalwork lump      LUMP 16,000.00 16,000.00 5,300.00 5,300.00 15,400.00 15,400.00    
810-01 concrete railing (barrier) 1,136.16   LNFT 55.00 62,488.80 48.00 54,535.68 52.80 59,989.24    
813-01 concrete approach slabs 100.76   SQYD 250.00 25,190.00 203.60 20,514.73 247.50 24,938.10    
S-001 pg-drain 74      EACH 600.00 44,400.00 1,400.00 103,600.00 950.00 70,300.00    
S-002 saw cutting concrete or asphaltic and stablized base 4,816      LNFT 2.00 9,632.00 3.00 14,448.00 9.00 43,344.00    
S-003 cleaning existing ditches 3,805      LNFT 2.00 7,610.00 6.00 22,830.00 3.00 11,415.00    
S-004 dynamic message sign unit 2      EACH 11,000.00 22,000.00 12,500.00 25,000.00 21,600.00 43,200.00    
S-005 paved gutter 1,840      LNFT 40.00 73,600.00 58.00 106,720.00 17.25 31,740.00    
S-007 impact attenuators (construction zone) 2      EACH 23,000.00 46,000.00 20,000.00 40,000.00 22,000.00 44,000.00    
S-008 vibration monitoring lump      LUMP 15,000.00 15,000.00 4,650.00 4,650.00 5,500.00 5,500.00    
S-101 removal of concrete lump      LUMP 70,000.00 70,000.00 65,000.00 65,000.00 6,600.00 6,600.00    
                       
 CONTRACTOR TOTAL       5,156,500.02   5,342,941.31   5,343,463.12    