| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PRAIRIE CONTRACTORS INC. |
- 2 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - H & S CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
3,077   |
CUYD |
13.00 |
40,001.00 |
12.75 |
39,231.75 |
15.00 |
46,155.00 |
12.00 |
36,924.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
4,784   |
CUYD |
13.00 |
62,192.00 |
12.75 |
60,996.00 |
15.00 |
71,760.00 |
12.00 |
57,408.00 |
| 204-02 |
temporary hay or straw bales
|
1,000   |
EACH |
10.00 |
10,000.00 |
3.71 |
3,710.00 |
15.00 |
15,000.00 |
5.00 |
5,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
325   |
CUYD |
77.00 |
25,025.00 |
72.00 |
23,400.00 |
30.00 |
9,750.00 |
40.00 |
13,000.00 |
| 502-01 |
superpave asphaltic concrete
|
53,226.6 |
TON |
57.12 |
3,040,303.39 |
57.15 |
3,041,900.19 |
58.00 |
3,087,142.80 |
70.00 |
3,725,862.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
2,008.7 |
TON |
60.00 |
120,522.00 |
83.00 |
166,722.10 |
95.00 |
190,826.50 |
70.00 |
140,609.00 |
| 507-01-A |
asphaltic surface treatment (1 application)
|
62,667   |
SQYD |
1.50 |
94,000.50 |
1.37 |
85,853.79 |
1.60 |
100,267.20 |
2.00 |
125,334.00 |
| 509-01 |
cold planing asphaltic pavement
|
47,745   |
SQYD |
1.32 |
63,023.40 |
1.36 |
64,933.20 |
1.00 |
47,745.00 |
1.20 |
57,294.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,883   |
CUYD |
0.01 |
- 18.83 |
1.00 |
- 1,883.00 |
1.00 |
- 1,883.00 |
0.01 |
- 18.83 |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
600   |
LNFT |
5.00 |
3,000.00 |
4.08 |
2,448.00 |
1.50 |
900.00 |
4.43 |
2,658.00 |
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
500   |
LNFT |
5.00 |
2,500.00 |
4.08 |
2,040.00 |
2.50 |
1,250.00 |
4.43 |
2,215.00 |
| 602-03 |
cleaning and sealing random cracks
|
50   |
LNFT |
10.00 |
500.00 |
5.30 |
265.00 |
6.50 |
325.00 |
5.70 |
285.00 |
| 602-08 |
grinding concrete pavement
|
533.0 |
SQYD |
12.00 |
6,396.00 |
14.50 |
7,728.50 |
30.00 |
15,990.00 |
10.00 |
5,330.00 |
| 602-10 |
longitudinal shoulder joints
|
94,000   |
LNFT |
0.99 |
93,060.00 |
0.90 |
84,600.00 |
1.25 |
117,500.00 |
1.00 |
94,000.00 |
| 702-04-B |
adjusting catch basins
|
16   |
EACH |
1,900.00 |
30,400.00 |
1,908.00 |
30,528.00 |
400.00 |
6,400.00 |
2,100.00 |
33,600.00 |
| 703-01 |
shoulder underdrain systems
|
68,765   |
LNFT |
7.16 |
492,357.40 |
7.42 |
510,236.30 |
9.00 |
618,885.00 |
7.95 |
546,681.75 |
| 703-02 |
shoulder outlet underdrains
|
229   |
EACH |
305.00 |
69,845.00 |
530.00 |
121,370.00 |
200.00 |
45,800.00 |
256.00 |
58,624.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
120,000.00 |
120,000.00 |
75,000.00 |
75,000.00 |
32,000.00 |
32,000.00 |
180,000.00 |
180,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
26.705 |
MILE |
400.00 |
10,682.00 |
185.00 |
4,940.42 |
300.00 |
8,011.50 |
350.00 |
9,346.75 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
26.705 |
MILE |
1.00 |
26.70 |
318.00 |
8,492.19 |
550.00 |
14,687.75 |
600.00 |
16,023.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
35.606 |
MILE |
1.00 |
35.60 |
530.00 |
18,871.18 |
350.00 |
12,462.10 |
357.00 |
12,711.34 |
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
590   |
EACH |
2.00 |
1,180.00 |
1.50 |
885.00 |
1.30 |
767.00 |
1.50 |
885.00 |
| 716-01-A |
mulch (vegetative)
|
39.92 |
ACRE |
400.00 |
15,968.00 |
636.00 |
25,389.12 |
600.00 |
23,952.00 |
950.00 |
37,924.00 |
| 717-01 |
seeding
|
1,198   |
LB |
7.35 |
8,805.30 |
5.83 |
6,984.34 |
7.00 |
8,386.00 |
9.00 |
10,782.00 |
| 718-01 |
fertilizer
|
39,922   |
LB |
0.55 |
21,957.10 |
0.32 |
12,775.04 |
0.25 |
9,980.50 |
0.40 |
15,968.80 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
4,000.00 |
4,000.00 |
4,240.00 |
4,240.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
74,000.00 |
74,000.00 |
200,000.00 |
200,000.00 |
400,000.00 |
400,000.00 |
100,000.00 |
100,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
60.00 |
1,200.00 |
53.00 |
1,060.00 |
60.00 |
1,200.00 |
60.00 |
1,200.00 |
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
85.00 |
510.00 |
69.00 |
414.00 |
75.00 |
450.00 |
90.00 |
540.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
157   |
EACH |
11.00 |
1,727.00 |
10.60 |
1,664.20 |
12.00 |
1,884.00 |
12.65 |
1,986.05 |
| 731-02 |
reflectorized raised pavement markers
|
1,175   |
EACH |
5.00 |
5,875.00 |
4.77 |
5,604.75 |
5.50 |
6,462.50 |
5.90 |
6,932.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.803 |
MILE |
1,900.00 |
33,825.70 |
1,960.00 |
34,893.88 |
2,100.00 |
37,386.30 |
2,280.00 |
40,590.84 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.902 |
MILE |
800.00 |
7,121.60 |
742.00 |
6,605.28 |
700.00 |
6,231.40 |
1,090.00 |
9,703.18 |
| 734-01 |
rubblizing portland cement concrete pavement
|
62,667   |
SQYD |
2.90 |
181,734.30 |
3.27 |
204,921.09 |
3.00 |
188,001.00 |
3.35 |
209,934.45 |
| 735-01 |
mailboxes
|
30   |
EACH |
2.00 |
60.00 |
1.06 |
31.80 |
50.00 |
1,500.00 |
20.00 |
600.00 |
| 735-02 |
mailbox supports (single)
|
58   |
EACH |
140.00 |
8,120.00 |
122.00 |
7,076.00 |
150.00 |
8,700.00 |
170.00 |
9,860.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
18,000.00 |
18,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
35,000.00 |
35,000.00 |
33,000.00 |
33,000.00 |
60,000.00 |
60,000.00 |
35,000.00 |
35,000.00 |
| S-001 |
cement treated base course (12 inch depth)
|
73,111   |
SQYD |
8.00 |
584,888.00 |
10.31 |
753,774.41 |
7.80 |
570,265.80 |
8.83 |
645,570.13 |
| S-003 |
rumble strips (ground-in)
|
17.8 |
MILE |
730.00 |
12,994.00 |
970.00 |
17,266.00 |
900.00 |
16,020.00 |
878.00 |
15,628.40 |
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
600   |
LNFT |
5.00 |
3,000.00 |
4.08 |
2,448.00 |
2.00 |
1,200.00 |
4.43 |
2,658.00 |
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
500   |
LNFT |
5.00 |
2,500.00 |
4.08 |
2,040.00 |
2.00 |
1,000.00 |
4.43 |
2,215.00 |
| S-927 |
sawcuts in asphaltic concrete lifts
|
600   |
LNFT |
3.00 |
1,800.00 |
2.65 |
1,590.00 |
2.00 |
1,200.00 |
2.88 |
1,728.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,300,117.16 |
|
5,699,046.53 |
|
5,815,561.35 |
|
6,295,593.36 |
|