| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 2 - BESSETTE DEVELOPMENT CORP. |
- 3 - PRAIRIE CONTRACTORS INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
372   |
LNFT |
12.25 |
4,557.00 |
5.50 |
2,046.00 |
8.00 |
2,976.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
60   |
CUYD |
28.00 |
1,680.00 |
21.00 |
1,260.00 |
50.00 |
3,000.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
600   |
CUYD |
34.35 |
20,610.00 |
51.00 |
30,600.00 |
50.00 |
30,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
2,646.8 |
TON |
48.00 |
127,046.40 |
54.25 |
143,588.90 |
54.00 |
142,927.20 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
97.8 |
TON |
83.00 |
8,117.40 |
58.00 |
5,672.40 |
85.00 |
8,313.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,643   |
SQYD |
3.90 |
6,407.70 |
4.75 |
7,804.25 |
8.00 |
13,144.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 27   |
CUYD |
1.00 |
- 27.00 |
1.00 |
- 27.00 |
0.01 |
- 0.27 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
44.00 |
4,400.00 |
34.50 |
3,450.00 |
35.00 |
3,500.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
152.0 |
LNFT |
52.00 |
7,904.00 |
50.00 |
7,600.00 |
55.00 |
8,360.00 |
|
|
| 704-03 |
blocked out guard rail
|
75.0 |
LNFT |
26.00 |
1,950.00 |
19.00 |
1,425.00 |
20.00 |
1,500.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,300.00 |
9,200.00 |
2,450.00 |
9,800.00 |
2,600.00 |
10,400.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
2,700.00 |
2,700.00 |
6,000.00 |
6,000.00 |
7,000.00 |
7,000.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
48   |
LNFT |
0.63 |
30.24 |
1.00 |
48.00 |
1.00 |
48.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.160 |
MILE |
195.00 |
421.20 |
542.50 |
1,171.80 |
350.00 |
756.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.780 |
MILE |
1.00 |
1.78 |
300.50 |
534.89 |
1.00 |
1.78 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
5.516 |
MILE |
1.00 |
5.51 |
161.50 |
890.83 |
1.00 |
5.51 |
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
4   |
EACH |
1.00 |
4.00 |
222.75 |
891.00 |
1.00 |
4.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
46.30 |
23,150.00 |
42.00 |
21,000.00 |
59.00 |
29,500.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
10,800.00 |
10,800.00 |
10,200.00 |
10,200.00 |
16,500.00 |
16,500.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
75.00 |
600.00 |
635.00 |
5,080.00 |
670.00 |
5,360.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
95.00 |
380.00 |
77.75 |
311.00 |
170.00 |
680.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
142   |
EACH |
5.23 |
742.66 |
5.75 |
816.50 |
6.00 |
852.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
24   |
LNFT |
2.51 |
60.24 |
3.00 |
72.00 |
10.00 |
240.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.758 |
MILE |
2,100.00 |
5,791.80 |
2,430.00 |
6,701.94 |
2,500.00 |
6,895.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.890 |
MILE |
1,100.00 |
979.00 |
770.00 |
685.30 |
2,000.00 |
1,780.00 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
420.00 |
840.00 |
470.00 |
940.00 |
500.00 |
1,000.00 |
|
|
| 735-01 |
mailboxes
|
8   |
EACH |
1.05 |
8.40 |
115.00 |
920.00 |
2.00 |
16.00 |
|
|
| 735-02 |
mailbox supports (single)
|
4   |
EACH |
170.00 |
680.00 |
55.50 |
222.00 |
275.00 |
1,100.00 |
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
190.00 |
380.00 |
115.00 |
230.00 |
300.00 |
600.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
1,300.00 |
1,300.00 |
4,000.00 |
4,000.00 |
200.00 |
200.00 |
|
|
| S-103 |
cleaning and resealing existing longitudinal joints
(bridges) |
384   |
LNFT |
4.80 |
1,843.20 |
8.75 |
3,360.00 |
7.00 |
2,688.00 |
|
|
| S-104 |
cleaning and resealing existing transverse joints
(bridges) |
144   |
LNFT |
4.80 |
691.20 |
8.75 |
1,260.00 |
7.00 |
1,008.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
243,254.73 |
|
278,554.81 |
|
300,354.22 |
|
|
|