Lead Project: 737-96-0047
Parish: DISTRICT 61
Routes: 3 td>
Description: RETAINER CONTRACT FOR GUARDRAIL REPAIR IN DISTRICT 61 (MO)
Type Const: repair and replacement of guradrail and related work in dist rict 61
 
RankLicenseBidderAmount
123811 UNITED RENTALS HWY TECHNOLOGIES INC $260,790.00
200164 TRAFFIC SOLUTIONS, INC. $332,050.25
327043 JACK B. HARPER CONTRACTOR, INC. $444,555.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
UNITED RENTALS HWY TECHNOLOGIES INC
- 2 -
TRAFFIC SOLUTIONS, INC.
- 3 -
JACK B. HARPER CONTRACTOR, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
729(16) object marker assembly 40      EACH 55.00 2,200.00 46.50 1,860.00 70.00 2,800.00    
S-002 furnish and install et 2000 end treatment 2      EACH 1,500.00 3,000.00 1,625.00 3,250.00 3,000.00 6,000.00    
S-003 furnish and install srt-350 12'-6" guardrail section 4      EACH 200.00 800.00 86.75 347.00 150.00 600.00    
S-004 furnish and install srt-350 25' guardrail section 6      EACH 250.00 1,500.00 126.50 759.00 250.00 1,500.00    
S-005 furnish and install srt-350 flared end treatment
(complete)
5      EACH 1,150.00 5,750.00 980.00 4,900.00 1,500.00 7,500.00    
S-006 furnish and install srt-350 single buffer terminal 2      EACH 35.00 70.00 56.00 112.00 125.00 250.00    
S-007 furnish and install srt-350 slot guards 5      EACH 10.00 50.00 1.00 5.00 100.00 500.00    
S-008 furnish and replace 10" x 10" x 23" wood bridge block 3      EACH 35.00 105.00 1.00 3.00 140.00 420.00    
S-010 furnish abd replace 12'-6" radius rail #1 for (melt) 15      EACH 140.00 2,100.00 100.00 1,500.00 180.00 2,700.00    
S-012 furnish and replace 2 3/8" x 5 1/2" pipe nipple 5      EACH 10.00 50.00 5.00 25.00 25.00 125.00    
S-014 furnish and replace 5 1/2" x 7 1/2" x 3'-6 1/2"
treated timber post (melt)
25      EACH 45.00 1,125.00 15.25 381.25 70.00 1,750.00    
S-015 furnish and replace 5 1/2" x 7 1/2" x 3'-6 1/2"
treated timber post (bct)
75      EACH 40.00 3,000.00 14.00 1,050.00 45.00 3,375.00    
S-016 furnish and replace 6" x 10" x 23" wood bridge block 5      EACH 25.00 125.00 7.00 35.00 50.00 250.00    
S-017 furnish and replace 6" x 8" x 1'-10 1/2" treated
timber block
10      EACH 15.00 150.00 7.50 75.00 15.00 150.00    
S-018 furnish and replace 6" x 8" x 1'-2" treated timber
block
325      EACH 10.00 3,250.00 5.00 1,625.00 25.00 8,125.00    
S-019 furnish and replace 6" x 8" x 10 1/2" treated timber
block
10      EACH 15.00 150.00 3.25 32.50 30.00 300.00    
S-020 furnish and replace 6" x 8" x 5'-4" treated timber
post (bct)
10      EACH 45.00 450.00 1.00 10.00 50.00 500.00    
S-021 furnish and replace 6" x 8" x 6' treated timber post 300      EACH 45.00 13,500.00 23.25 6,975.00 70.00 21,000.00    
S-022 furnish and replace 6" x 8" x 6' treated timber post
(crt)
75      EACH 50.00 3,750.00 25.00 1,875.00 70.00 5,250.00    
S-023 furnish and replace 8" x 8" x 5/8" bearing plate 2      EACH 20.00 40.00 10.00 20.00 20.00 40.00    
S-024 furnish and replace c.a.t. system 1      EACH 4,200.00 4,200.00 3,500.00 3,500.00 3,500.00 3,500.00    
S-025 furnish and replace cable anchor box 2      EACH 25.00 50.00 21.00 42.00 40.00 80.00    
S-027 furnish and replace cable assembly 10      EACH 50.00 500.00 42.00 420.00 70.00 700.00    
S-028 furnish and replace et-2000 extruder panel 10      EACH 900.00 9,000.00 350.00 3,500.00 800.00 8,000.00    
S-029 furnish and replace galvanized steel tube (w/soil
plate)(for timber bct)
10      EACH 140.00 1,400.00 80.00 800.00 80.00 800.00    
S-030 furnish & replace guardrail end treatement (melt) 5      EACH 750.00 3,750.00 250.00 1,250.00 1,500.00 7,500.00    
S-033 furnish & replace terminal, guardrail w beam median
barrier
5      EACH 40.00 200.00 20.00 100.00 250.00 1,250.00    
S-034 furnish & replace thrie beam guardrail (12'-6") 25      EACH 140.00 3,500.00 135.00 3,375.00 80.00 2,000.00    
S-035 furnish & replace thrie beam guardrail (25') 10      EACH 260.00 2,600.00 241.25 2,412.50 120.00 1,200.00    
S-036 furnish & replace thrie beam guardrail (6'-3") 5      EACH 85.00 425.00 81.25 406.25 75.00 375.00    
S-037 furnish & replace thrie beam guardrail transition
(6'-3")
25      EACH 125.00 3,125.00 72.50 1,812.50 75.00 1,875.00    
S-038 furnish & replace thrie beam terminal connector 1      EACH 80.00 80.00 58.00 58.00 90.00 90.00    
S-039 furnish & replace w6 x 20 lb x 6' steel post 1      EACH 160.00 160.00 100.00 100.00 140.00 140.00    
S-040 furnish & replace w beam end section (buffer)(bct) 20      EACH 50.00 1,000.00 52.50 1,050.00 50.00 1,000.00    
S-041 furnish & replace w beam end section (buffer)(melt) 5      EACH 55.00 275.00 52.50 262.50 50.00 250.00    
S-042 furnish & replace w beam end section (buffer)(melt)
(diaphragm plates)
5      EACH 20.00 100.00 12.50 62.50 50.00 250.00    
S-043 furnish & replace w beam end section (flared) 5      EACH 40.00 200.00 28.75 143.75 40.00 200.00    
S-044 furnish & replace w beam guardrail (12'-6") 35      EACH 100.00 3,500.00 68.75 2,406.25 80.00 2,800.00    
S-045 furnish & replace w beam guardrail (12'-6")(radius) 10      EACH 125.00 1,250.00 94.00 940.00 80.00 800.00    
S-046 furnish & replace w beam guardrail (25')(bct punch) 25      EACH 185.00 4,625.00 143.75 3,593.75 80.00 2,000.00    
S-047 furnish & replace w beam guardrail (25') 165      EACH 180.00 29,700.00 126.25 20,831.25 120.00 19,800.00    
S-048 furnish & replace w beam guardrail (25')
(et-2000 anchor rail)
25      EACH 220.00 5,500.00 243.75 6,093.75 210.00 5,250.00    
S-049 furnish & replace w beam guardrail (6'-3") 20      EACH 40.00 800.00 28.75 575.00 75.00 1,500.00    
S-050 furnish & replace w beam terminal connector 1      EACH 50.00 50.00 18.00 18.00 80.00 80.00    
S-051 furnish & replace w beam terminal connector
(w/25 1/2 degree bend)
25      EACH 40.00 1,000.00 18.00 450.00 70.00 1,750.00    
S-052 furnish & replace w6 x 9 x 1'-2" steel block 100      EACH 10.00 1,000.00 8.75 875.00 30.00 3,000.00    
S-053 furnish & replace w6 x 9 x 1'- 9 1/2" steel block 10      EACH 20.00 200.00 12.00 120.00 30.00 300.00    
S-054 furnish & replace w6 x 9 x 6'-6" steel post 10      EACH 45.00 450.00 28.00 280.00 80.00 800.00    
S-055 furnish & replace w6 x 9 x 6'-0" steel post 110      EACH 45.00 4,950.00 33.75 3,712.50 80.00 8,800.00    
S-056 furnish & replace 8" x 8" x 6' treated timber post 15      EACH 55.00 825.00 28.00 420.00 100.00 1,500.00    
S-057 furnish & install et 2000 cable anchor box 10      EACH 65.00 650.00 23.00 230.00 120.00 1,200.00    
S-058 furnish & install 10" x 10" x 6' treated timber post 1      EACH 110.00 110.00 25.00 25.00 130.00 130.00    
S-059 furnish & install w6 x 20 lb x 2'-10" steel pedestal
post
1      EACH 200.00 200.00 20.00 20.00 150.00 150.00    
S-061 replace w beam guardrail 12'-6" 100      EACH 25.00 2,500.00 32.00 3,200.00 80.00 8,000.00    
S-062 replace w beam guardrail 25'-0" 100      EACH 40.00 4,000.00 32.00 3,200.00 140.00 14,000.00    
S-063 replace w beam end section buffer 65      EACH 20.00 1,300.00 10.00 650.00 70.00 4,550.00    
S-064 replace trie beam 12'-6" guardrail transition 25      EACH 20.00 500.00 25.00 625.00 80.00 2,000.00    
S-065 replace trie beam guardrail 10      EACH 45.00 450.00 15.00 150.00 80.00 800.00    
S-500 maintenance of traffic (each repair) 120      EACH 400.00 48,000.00 800.00 96,000.00 1,200.00 144,000.00    
S-501 mobilization (each repair) 100      EACH 700.00 70,000.00 1,325.00 132,500.00 1,200.00 120,000.00    
S-502 guardrail repairs nightime mobilization 5      EACH 1,500.00 7,500.00 2,200.00 11,000.00 1,800.00 9,000.00    
                       
 CONTRACTOR TOTAL       260,790.00   332,050.25   444,555.00    