Lead Project: 015-07-0043
Parish: CALDWELL
Routes: US 165
Description: COLUMBIA - LA. 847
Type Const: grading, drain struct, lime trmt, subgrade layer, base course, superpave acp (alternate
a-1), portland cement concrete pavement (alternate a-2) and related work
 
RankLicenseBidderAmount
112312 GILCHRIST CONSTRUCTION CO. LLC $16,049,911.13
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $16,310,726.17
334567 JAMES CONSTRUCTION GROUP LLC $16,903,979.59
421810 HIGHWAY SPECIALISTS INC. $17,567,702.29
539462 DENTON-JAMES LLC $17,696,939.44
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
JAMES CONSTRUCTION GROUP LLC
- 4 -
HIGHWAY SPECIALISTS INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 400,000.00 400,000.00 162,000.00 162,000.00 300,000.00 300,000.00 100,000.00 100,000.00
202-01 removal of structures & obstructions lump      LUMP 40,000.00 40,000.00 25,000.00 25,000.00 20,000.00 20,000.00 50,000.00 50,000.00
202-02-B-01 removal of concrete box culverts (sta. 276+48; 2 -
2.5' x 4' x 46.5')
2      EACH 3,500.00 7,000.00 5,000.00 10,000.00 1,800.00 3,600.00 3,000.00 6,000.00
202-02-B-02 removal of concrete box culverts (sta. 294+67; 1 - 2'
x 4' x 56.7')
1      EACH 3,500.00 3,500.00 5,000.00 5,000.00 1,800.00 1,800.00 3,000.00 3,000.00
202-02-B-03 removal of concrete box culverts (sta. 410+55; 1 - 2'
x 4' x 52.1')
1      EACH 3,500.00 3,500.00 5,000.00 5,000.00 1,800.00 1,800.00 3,000.00 3,000.00
202-02-D removal of concrete walks & drives 256      SQYD 8.00 2,048.00 11.00 2,816.00 25.00 6,400.00 12.00 3,072.00
202-02-G removal of surfacing & stabilized base 537.5    SQYD 8.00 4,300.00 11.00 5,912.50 5.00 2,687.50 12.00 6,450.00
202-02-I removal of pavement structure 12,384.4    LNFT 13.00 160,997.20 11.00 136,228.40 6.00 74,306.40 18.00 222,919.20
202-02-J removal of shoulder surfacing 5,532.5    SQYD 4.50 24,896.25 5.00 27,662.50 9.00 49,792.50 7.00 38,727.50
202-02-01 removal of abandoned rail spur (sta. 398+00) 1      EACH 7,500.00 7,500.00 1.00 1.00 3,200.00 3,200.00 5,000.00 5,000.00
202-02-02 removal of concrete headwalls 10      EACH 1,000.00 10,000.00 4,000.00 40,000.00 1,300.00 13,000.00 1,500.00 15,000.00
202-02-03 removal of 4' x 8' sign (lt. of sta. 124+90) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-04 removal of 4' x 10' sign (rt. of sta. 125+00) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-05 removal of 20' x 32' wood frame commercial building
(lt. of sta. 125+50)
1      EACH 4,000.00 4,000.00 1.00 1.00 900.00 900.00 900.00 900.00
202-02-06 removal of 20' x 16' shed (lt. of sta. 127+00) 1      EACH 2,000.00 2,000.00 1.00 1.00 200.00 200.00 200.00 200.00
202-02-07 removal of 30' x 32' metal frame commercial building
(lt of sta. 129+40)
1      EACH 2,000.00 2,000.00 1.00 1.00 900.00 900.00 900.00 900.00
202-02-08 removal of 2500 sq. ft. metal frame commercial
building (lt. of sta. 130+50)(contains
non-friable asbestos)
1      EACH 2,000.00 2,000.00 1.00 1.00 1,500.00 1,500.00 5,200.00 5,200.00
202-02-09 removal of 4' x 8' sign (rt. of sta.130+50) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-10 removal of canopy (rt. of sta. 132+50) 1      EACH 2,000.00 2,000.00 1.00 1.00 500.00 500.00 500.00 500.00
202-02-11 removal of 12' x 20' sign (lt. of sta. 134+00) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-12 removal of 6' x 10' sign (lt. of sta. 137+12) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-13 removal of 4' x 8' sign (lt. of sta. 151+10) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-14 removal of 28' x 40' brick commercial building (lt. of
sta. 152+50) (contains friable & non-friable
asbestos)
1      EACH 7,500.00 7,500.00 1.00 1.00 1,500.00 1,500.00 5,200.00 5,200.00
202-02-15 removal of 8' x 12' sign (lt. of sta. 152+50) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-16 removal of 4' x 6' sign (lt. of sta. 159+00) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-17 removal of 4' x 8' sign (lt. of sta. 163+50) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-18 removal of 10 - 2' x 6' concrete slab (lt. of sta.
165+00)
1      EACH 4,000.00 4,000.00 1.00 1.00 200.00 200.00 200.00 200.00
202-02-19 removal of 4' x 4' sign (lt. of sta. 240+00) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-20 removal of metal pole (lt. of sta. 240+25) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-21 removal of metal pole (lt. of sta. 240+35) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-22 removal of 28' x 85' wood frame residence (lt. of sta.
289+50) (contains non-friable asbestos)
1      EACH 4,000.00 4,000.00 1.00 1.00 1,500.00 1,500.00 5,200.00 5,200.00
202-02-23 removal of filled-in pool (rt. of sta. 314+00) 1      EACH 4,000.00 4,000.00 1.00 1.00 750.00 750.00 750.00 750.00
202-02-24 removal of 200 sq. ft. brick garage (rt. of sta.
325+12)
1      EACH 2,000.00 2,000.00 1.00 1.00 1,500.00 1,500.00 1,500.00 1,500.00
202-02-25 removal of 12' x 12' barn (lt. of sta. 325+75) 1      EACH 2,000.00 2,000.00 1.00 1.00 500.00 500.00 500.00 500.00
202-02-26 removal of 12' x 20' barn (lt. of sta. 326+00) 1      EACH 2,000.00 2,000.00 1.00 1.00 500.00 500.00 500.00 500.00
202-02-27 removal of 32' x 56' brick residence (lt. of sta.
328+00) (contains non-friable asbestos)
1      EACH 4,000.00 4,000.00 1.00 1.00 1,800.00 1,800.00 5,500.00 5,500.00
202-02-28 removal of 600 sq. ft. shed (lt. of sta. 329+30) 1      EACH 2,000.00 2,000.00 1.00 1.00 500.00 500.00 500.00 500.00
202-02-29 removal of 40' x 60' wood frame residence (rt. of sta.
348+00) (contains non-friable asbestos)
1      EACH 2,000.00 2,000.00 1.00 1.00 1,500.00 1,500.00 5,200.00 5,200.00
202-02-30 removal of 30' x 56' brick residence (rt. of sta.
351+50)
1      EACH 4,000.00 4,000.00 1.00 1.00 1,500.00 1,500.00 1,500.00 1,500.00
202-02-31 removal of antenna (rt. of sta. 386+00) 1      EACH 750.00 750.00 1.00 1.00 200.00 200.00 200.00 200.00
202-02-32 removal of 32' x 62' wood frame residence (rt. of sta.
392+00) (contains non-friable asbestos)
1      EACH 2,000.00 2,000.00 1.00 1.00 1,500.00 1,500.00 5,200.00 5,200.00
202-02-33 removal of 4' x 8' sign (rt. of sta. 398+00) 1      EACH 750.00 750.00 1.00 1.00 1.00 1.00 1.00 1.00
202-02-34 removal of 30' x 52' brick residence (rt. of sta.
428+40) (contains friable asbestos)
1      EACH 7,500.00 7,500.00 1.00 1.00 1,500.00 1,500.00 5,200.00 5,200.00
202-02-35 removal of 12' x 22' shed (rt. of sta. 429+80) 1      EACH 750.00 750.00 1.00 1.00 500.00 500.00 500.00 500.00
202-02-36 removal of 12' x 12' barn (rt. of sta. 429+99) 1      EACH 2,000.00 2,000.00 1.00 1.00 500.00 500.00 500.00 500.00
202-02-37 removal of 32' x 68' brick residence (rt. of sta.
438+00) (contains friable & non-friable asbestos)
1      EACH 7,500.00 7,500.00 1.00 1.00 1,500.00 1,500.00 5,200.00 5,200.00
203-01 general excavation 93,616      CUYD 4.00 374,464.00 5.78 541,100.48 3.00 280,848.00 4.50 421,272.00
203-02 drainage excavation 1,338      CUYD 6.50 8,697.00 5.57 7,452.66 9.00 12,042.00 10.00 13,380.00
203-03 muck excavation 2,000      CUYD 6.50 13,000.00 6.88 13,760.00 12.00 24,000.00 16.00 32,000.00
203-04 embankment 247,013      CUYD 9.00 2,223,117.00 8.70 2,149,013.10 8.00 1,976,104.00 8.50 2,099,610.50
204-02 temporary hay or straw bales 252      EACH 18.00 4,536.00 8.00 2,016.00 7.00 1,764.00 19.00 4,788.00
204-05-A temporary sediment check dams (hay) 189      EACH 150.00 28,350.00 100.00 18,900.00 95.00 17,955.00 50.00 9,450.00
204-05-B temporary sediment check dams (stone) 25      EACH 350.00 8,750.00 500.00 12,500.00 100.00 2,500.00 250.00 6,250.00
204-06 temporary silt fencing 3,965      LNFT 1.50 5,947.50 6.00 23,790.00 1.30 5,154.50 2.00 7,930.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,404      CUYD 50.00 70,200.00 26.35 36,995.40 30.00 42,120.00 26.00 36,504.00
402-01 traffic maintenance aggregate (vehicular measurement) 2,500.0    CUYD 50.00 125,000.00 20.00 50,000.00 45.00 112,500.00 35.00 87,500.00
509-01 cold planing asphaltic pavement 125,492      SQYD 0.90 112,942.80 1.22 153,100.24 1.00 125,492.00 1.25 156,865.00
509-02 contractor retained reclaimed asphaltic pavement - 3,486      CUYD 0.50 - 1,743.00 0.10 - 348.60 1.00 - 3,486.00 0.01 - 34.86
701-01-F cross drain pipe (15" rcp/pcp) 732      LNFT 34.00 24,888.00 47.00 34,404.00 40.00 29,280.00 75.00 54,900.00
701-01-I cross drain pipe (24" rcp/pcp) 950      LNFT 51.00 48,450.00 58.00 55,100.00 55.00 52,250.00 80.00 76,000.00
701-01-K cross drain pipe (30" rcp/pcp) 192      LNFT 68.00 13,056.00 66.00 12,672.00 85.00 16,320.00 115.00 22,080.00
701-01-M cross drain pipe (36" rcp/pcp) 520      LNFT 92.00 47,840.00 89.00 46,280.00 110.00 57,200.00 130.00 67,600.00
701-01-O cross drain pipe (48" rcp/pcp) 720      LNFT 150.00 108,000.00 143.00 102,960.00 150.00 108,000.00 195.00 140,400.00
701-02-A cross drain pipe arch (15" equiv. rcpa) 1,708      LNFT 45.00 76,860.00 53.00 90,524.00 75.00 128,100.00 90.00 153,720.00
701-02-D cross drain pipe arch (24" equiv. rcpa) 1,394      LNFT 65.00 90,610.00 65.00 90,610.00 85.00 118,490.00 105.00 146,370.00
701-02-H cross drain pipe arch (48" equiv. rcpa) 104      LNFT 150.00 15,600.00 193.00 20,072.00 160.00 16,640.00 195.00 20,280.00
701-02-I cross drain pipe arch (54" equiv. rcpa) 336      LNFT 190.00 63,840.00 183.00 61,488.00 180.00 60,480.00 185.00 62,160.00
701-02-L cross drain pipe arch (72" equiv. rcpa) 570      LNFT 300.00 171,000.00 287.00 163,590.00 260.00 148,200.00 280.00 159,600.00
701-05-G side drain pipe (18") 1,310      LNFT 35.00 45,850.00 50.00 65,500.00 40.00 52,400.00 24.00 31,440.00
701-05-I side drain pipe (24") 706      LNFT 52.00 36,712.00 58.00 40,948.00 55.00 38,830.00 30.00 21,180.00
701-05-K side drain pipe (30") 568      LNFT 66.00 37,488.00 72.00 40,896.00 85.00 48,280.00 40.00 22,720.00
701-06-A side drain pipe arch (15" equiv.) 152      LNFT 45.00 6,840.00 69.00 10,488.00 55.00 8,360.00 30.00 4,560.00
701-06-B side drain pipe arch (18" equiv.) 244      LNFT 48.00 11,712.00 57.00 13,908.00 60.00 14,640.00 33.00 8,052.00
701-06-D side drain pipe arch (24" equiv.) 232      LNFT 65.00 15,080.00 69.00 16,008.00 70.00 16,240.00 40.00 9,280.00
701-06-E side drain pipe arch (30" equiv.) 856      LNFT 83.00 71,048.00 73.00 62,488.00 100.00 85,600.00 52.00 44,512.00
701-06-F side drain pipe arch (36" equiv.) 76      LNFT 110.00 8,360.00 106.00 8,056.00 120.00 9,120.00 55.00 4,180.00
701-06-H side drain pipe arch (48" equiv.) 144      LNFT 165.00 23,760.00 151.00 21,744.00 155.00 22,320.00 120.00 17,280.00
701-10-I reinforced concrete pipe (extension)(24") 328      LNFT 60.00 19,680.00 115.00 37,720.00 125.00 41,000.00 115.00 37,720.00
701-10-K reinforced concrete pipe (extension)(30") 216      LNFT 85.00 18,360.00 89.00 19,224.00 135.00 29,160.00 125.00 27,000.00
701-10-M reinforced concrete pipe (extension)(36") 194      LNFT 110.00 21,340.00 141.00 27,354.00 150.00 29,100.00 150.00 29,100.00
702-03-A catch basins (cb-01) 36      EACH 2,000.00 72,000.00 3,500.00 126,000.00 3,200.00 115,200.00 2,700.00 97,200.00
702-03-B catch basins (cb-02) 2      EACH 5,000.00 10,000.00 4,500.00 9,000.00 4,000.00 8,000.00 4,000.00 8,000.00
702-07-A cross drain safety end (type 1) 1      EACH 1,600.00 1,600.00 4,300.00 4,300.00 2,300.00 2,300.00 2,100.00 2,100.00
702-07-B cross drain safety end (type 2) 1      EACH 1,600.00 1,600.00 6,500.00 6,500.00 5,300.00 5,300.00 15,000.00 15,000.00
705-02 combination mesh & barbed wire fence 26,841      LNFT 5.75 154,335.75 5.25 140,915.25 5.50 147,625.50 5.00 134,205.00
705-04 single swinging driveway gates 32      EACH 500.00 16,000.00 430.00 13,760.00 600.00 19,200.00 400.00 12,800.00
705-05 double swinging driveway gates 9      DBGT 650.00 5,850.00 600.00 5,400.00 450.00 4,050.00 550.00 4,950.00
706-02-C concrete drive (6" thick) 250.0    SQYD 35.00 8,750.00 41.00 10,250.00 40.00 10,000.00 60.00 15,000.00
708-01 right-of-way monument 115      EACH 350.00 40,250.00 108.00 12,420.00 200.00 23,000.00 120.00 13,800.00
708-02 right-of-way monument witness post 115      EACH 350.00 40,250.00 108.00 12,420.00 200.00 23,000.00 75.00 8,625.00
712-02 sacked concrete revetment 104      SQYD 60.00 6,240.00 65.00 6,760.00 100.00 10,400.00 75.00 7,800.00
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 100,000.00 100,000.00 85,000.00 85,000.00 290,000.00 290,000.00
713-07 temporary reflectorized raised pavement markers 963      EACH 4.50 4,333.50 5.00 4,815.00 4.00 3,852.00 4.00 3,852.00
716-01-A mulch (vegetative) 40.37   ACRE 600.00 24,222.00 600.00 24,222.00 550.00 22,203.50 550.00 22,203.50
717-01 seeding 3,600      LB 6.50 23,400.00 6.50 23,400.00 6.00 21,600.00 6.00 21,600.00
718-01 fertilizer 120,000      LB 0.22 26,400.00 0.20 24,000.00 0.25 30,000.00 0.20 24,000.00
718-02 agricultural lime 240.0    TON 90.00 21,600.00 86.00 20,640.00 80.00 19,200.00 80.00 19,200.00
720-01-A erosion control system, slope protection (type a) 10,800      SQYD 1.00 10,800.00 1.00 10,800.00 1.10 11,880.00 1.00 10,800.00
720-01-B erosion control system, slope protection (type b) 856      SQYD 1.40 1,198.40 1.35 1,155.60 1.10 941.60 1.25 1,070.00
720-01-C erosion control system, flexible channel liner (type c) 967      SQYD 2.00 1,934.00 2.00 1,934.00 3.25 3,142.75 1.75 1,692.25
720-01-D erosion control system, flexible channel liner (type d) 156      SQYD 4.00 624.00 4.00 624.00 3.25 507.00 3.00 468.00
722-02 project site laboratory (equipped) 1      EACH 20,000.00 20,000.00 25,000.00 25,000.00 15,000.00 15,000.00 27,000.00 27,000.00
724-01-C pavement patching (17") 436      SQYD 90.00 39,240.00 110.00 47,960.00 130.00 56,680.00 100.00 43,600.00
725-01 temporary detour roads 1,188.1    LNFT 155.00 184,155.50 156.00 185,343.60 100.00 118,810.00 200.00 237,620.00
726-01 bedding material 2,949.7    CUYD 65.00 191,730.50 45.50 134,211.35 55.00 162,233.50 65.00 191,730.50
727-01 mobilization lump      LUMP 1,000,000.00 1,000,000.00 1,500,000.00 1,500,000.00 1,600,000.00 1,600,000.00 1,125,000.00 1,125,000.00
729-19-A dead end road installations (type a) 4      EACH 1,300.00 5,200.00 3,200.00 12,800.00 2,500.00 10,000.00 3,500.00 14,000.00
731-02 reflectorized raised pavement markers 2,521      EACH 5.00 12,605.00 5.00 12,605.00 5.00 12,605.00 5.00 12,605.00
732-02-A plastic pavement striping (solid line) (4" width) 28.604  MILE 2,000.00 57,208.00 2,000.00 57,208.00 1,850.00 52,917.40 2,600.00 74,370.40
732-02-C plastic pavement striping (solid line) (8" width) 0.836  MILE 4,500.00 3,762.00 4,500.00 3,762.00 4,200.00 3,511.20 11,000.00 9,196.00
732-02-E plastic pavement striping (solid line) (24" width) 0.260  MILE 14,000.00 3,640.00 13,500.00 3,510.00 12,000.00 3,120.00 24,500.00 6,370.00
732-04-A plastic pavement legends & symbols (arrow) 20      EACH 180.00 3,600.00 160.00 3,200.00 150.00 3,000.00 200.00 4,000.00
732-04-C plastic pavement legends & symbols (only) 16      EACH 170.00 2,720.00 160.00 2,560.00 150.00 2,400.00 200.00 3,200.00
732-05 removal of existing pavement markings 7.189  MILE 3,300.00 23,723.70 3,800.00 27,318.20 3,200.00 23,004.80 850.00 6,110.65
735-01 mailboxes 84      EACH 50.00 4,200.00 12.00 1,008.00 10.00 840.00 5.00 420.00
735-02 mailbox supports (single) 84      EACH 150.00 12,600.00 150.00 12,600.00 125.00 10,500.00 175.00 14,700.00
740-01 construction layout lump      LUMP 150,000.00 150,000.00 100,000.00 100,000.00 125,000.00 125,000.00 315,000.00 315,000.00
744-01 traffic control management lump      LUMP 15,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 85,000.00 85,000.00
805-01-B class a concrete (box culvert headwalls) 2.63   CUYD 1,800.00 4,734.00 1,100.00 2,893.00 2,200.00 5,786.00 2,000.00 5,260.00
805-12-Y reinforced concrete box culverts (5'x 2')(extension) 104.0    LNFT 500.00 52,000.00 425.00 44,200.00 400.00 41,600.00 350.00 36,400.00
806-01 deformed reinforcing steel 185      LB 5.00 925.00 2.00 370.00 1.00 185.00 6.00 1,110.00
S-001 rumble strips (ground-in) 17.2    MILE 850.00 14,620.00 810.00 13,932.00 540.00 9,288.00 555.00 9,546.00
S-002 clean existing ditches 180      LNFT 12.00 2,160.00 20.00 3,600.00 40.00 7,200.00 15.00 2,700.00
S-003 sawcutting existing asphaltic concrete pavement (full
depth)
55,879      INFT 0.40 22,351.60 1.00 55,879.00 1.00 55,879.00 0.40 22,351.60
S-004 sawcutting existing portland cement concrete pavement
(full depth)
2,416      INFT 2.00 4,832.00 1.25 3,020.00 1.00 2,416.00 2.00 4,832.00
 SUBTOTAL GENERAL       7,095,521.70   7,292,264.68   7,123,431.15   7,506,368.24
                       
ALTERNATE A                      
                       
ALTERNATE A1                      
203-05-A nonplastic embankment (stone) 6,433      CUYD 60.00 385,980.00 63.00 405,279.00 66.00 424,578.00 76.00 488,908.00
302-01 class ii base course 62,634.9    CUYD 50.00 3,131,745.00 55.00 3,444,919.50 55.00 3,444,919.50 59.00 3,695,459.10
304-05 lime treatment (type e) 1,739.23   TON 1.00 1,739.23 125.00 217,403.75 110.00 191,315.30 120.00 208,707.60
305-01-D subgrade layer (12" thick) 245,394      SQYD 6.00 1,472,364.00 5.00 1,226,970.00 6.00 1,472,364.00 6.10 1,496,903.40
502-01 superpave asphaltic concrete 67,816.8    TON 50.00 3,390,840.00 48.00 3,255,206.40 53.00 3,594,290.40 52.00 3,526,473.60
502-01-A superpave asphaltic concrete, paved drives and
turnouts
8,443.3    TON 65.00 548,814.50 53.00 447,494.90 75.00 633,247.50 73.00 616,360.90
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
7.292  MILE 350.00 2,552.20 320.00 2,333.44 300.00 2,187.60 550.00 4,010.60
713-05-A temporary pavement markings (solid line)(4" width) 14.582  MILE 550.00 8,020.10 500.00 7,291.00 470.00 6,853.54 650.00 9,478.30
732-03-A plastic pavement striping (broken line)(4" width) 15.418  MILE 800.00 12,334.40 750.00 11,563.50 700.00 10,792.60 975.00 15,032.55
 SUBTOTAL ALT A1       8,954,389.43   9,018,461.49   9,780,548.44   10,061,334.05
                       
ALTERNATE A2                      
203-05-A nonplastic embankment (stone) 6,433      CUYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
302-01 class ii base course 53,950.4    CUYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
304-05 lime treatment (type e) 1,736.61   TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
305-01-D subgrade layer (12" thick) 245,024      SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
502-01 superpave asphaltic concrete 18,810.1    TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,709.2    TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601-01-G portland cement concrete pavement (8" thick) 142,094.2    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601-02-G portland cement pavement (8" thick)(crossovers and
turnouts)
19,552.8    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601-04 portland cement pavement coring 205      EACH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.573  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
713-04-B-01 temporary pavement markings (broken line)(4" width)
(10' length) (type 1 removable)
6.719  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
713-05-A temporary pavement markings (solid line)(4" width) 1.148  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type i removable)
13.434  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
732-03-A plastic pavement striping (broken line)(4" width) 4.409  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
732-03-A-01 plastic pavement striping (broken line)(4" width)
(preformed marking tape- type i)
11.009  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
                       
 CONTRACTOR TOTAL       16,049,911.13   16,310,726.17   16,903,979.59   17,567,702.29
 
Item Number Item Description Quantity Unit of Measure - 5 -
DENTON-JAMES LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 1,680,000.00 1,680,000.00            
202-01 removal of structures & obstructions lump      LUMP 20,000.00 20,000.00            
202-02-B-01 removal of concrete box culverts (sta. 276+48; 2 -
2.5' x 4' x 46.5')
2      EACH 2,000.00 4,000.00            
202-02-B-02 removal of concrete box culverts (sta. 294+67; 1 - 2'
x 4' x 56.7')
1      EACH 3,000.00 3,000.00            
202-02-B-03 removal of concrete box culverts (sta. 410+55; 1 - 2'
x 4' x 52.1')
1      EACH 3,000.00 3,000.00            
202-02-D removal of concrete walks & drives 256      SQYD 9.00 2,304.00            
202-02-G removal of surfacing & stabilized base 537.5    SQYD 4.00 2,150.00            
202-02-I removal of pavement structure 12,384.4    LNFT 20.00 247,688.00            
202-02-J removal of shoulder surfacing 5,532.5    SQYD 3.00 16,597.50            
202-02-01 removal of abandoned rail spur (sta. 398+00) 1      EACH 3,000.00 3,000.00            
202-02-02 removal of concrete headwalls 10      EACH 800.00 8,000.00            
202-02-03 removal of 4' x 8' sign (lt. of sta. 124+90) 1      EACH 1.00 1.00            
202-02-04 removal of 4' x 10' sign (rt. of sta. 125+00) 1      EACH 1.00 1.00            
202-02-05 removal of 20' x 32' wood frame commercial building
(lt. of sta. 125+50)
1      EACH 1.00 1.00            
202-02-06 removal of 20' x 16' shed (lt. of sta. 127+00) 1      EACH 1.00 1.00            
202-02-07 removal of 30' x 32' metal frame commercial building
(lt of sta. 129+40)
1      EACH 1.00 1.00            
202-02-08 removal of 2500 sq. ft. metal frame commercial
building (lt. of sta. 130+50)(contains
non-friable asbestos)
1      EACH 1.00 1.00            
202-02-09 removal of 4' x 8' sign (rt. of sta.130+50) 1      EACH 1.00 1.00            
202-02-10 removal of canopy (rt. of sta. 132+50) 1      EACH 1.00 1.00            
202-02-11 removal of 12' x 20' sign (lt. of sta. 134+00) 1      EACH 1.00 1.00            
202-02-12 removal of 6' x 10' sign (lt. of sta. 137+12) 1      EACH 1.00 1.00            
202-02-13 removal of 4' x 8' sign (lt. of sta. 151+10) 1      EACH 1.00 1.00            
202-02-14 removal of 28' x 40' brick commercial building (lt. of
sta. 152+50) (contains friable & non-friable
asbestos)
1      EACH 1.00 1.00            
202-02-15 removal of 8' x 12' sign (lt. of sta. 152+50) 1      EACH 1.00 1.00            
202-02-16 removal of 4' x 6' sign (lt. of sta. 159+00) 1      EACH 1.00 1.00            
202-02-17 removal of 4' x 8' sign (lt. of sta. 163+50) 1      EACH 1.00 1.00            
202-02-18 removal of 10 - 2' x 6' concrete slab (lt. of sta.
165+00)
1      EACH 1.00 1.00            
202-02-19 removal of 4' x 4' sign (lt. of sta. 240+00) 1      EACH 1.00 1.00            
202-02-20 removal of metal pole (lt. of sta. 240+25) 1      EACH 1.00 1.00            
202-02-21 removal of metal pole (lt. of sta. 240+35) 1      EACH 1.00 1.00            
202-02-22 removal of 28' x 85' wood frame residence (lt. of sta.
289+50) (contains non-friable asbestos)
1      EACH 1.00 1.00            
202-02-23 removal of filled-in pool (rt. of sta. 314+00) 1      EACH 1.00 1.00            
202-02-24 removal of 200 sq. ft. brick garage (rt. of sta.
325+12)
1      EACH 1.00 1.00            
202-02-25 removal of 12' x 12' barn (lt. of sta. 325+75) 1      EACH 1.00 1.00            
202-02-26 removal of 12' x 20' barn (lt. of sta. 326+00) 1      EACH 1.00 1.00            
202-02-27 removal of 32' x 56' brick residence (lt. of sta.
328+00) (contains non-friable asbestos)
1      EACH 1.00 1.00            
202-02-28 removal of 600 sq. ft. shed (lt. of sta. 329+30) 1      EACH 1.00 1.00            
202-02-29 removal of 40' x 60' wood frame residence (rt. of sta.
348+00) (contains non-friable asbestos)
1      EACH 1.00 1.00            
202-02-30 removal of 30' x 56' brick residence (rt. of sta.
351+50)
1      EACH 1.00 1.00            
202-02-31 removal of antenna (rt. of sta. 386+00) 1      EACH 1.00 1.00            
202-02-32 removal of 32' x 62' wood frame residence (rt. of sta.
392+00) (contains non-friable asbestos)
1      EACH 1.00 1.00            
202-02-33 removal of 4' x 8' sign (rt. of sta. 398+00) 1      EACH 1.00 1.00            
202-02-34 removal of 30' x 52' brick residence (rt. of sta.
428+40) (contains friable asbestos)
1      EACH 1.00 1.00            
202-02-35 removal of 12' x 22' shed (rt. of sta. 429+80) 1      EACH 1.00 1.00            
202-02-36 removal of 12' x 12' barn (rt. of sta. 429+99) 1      EACH 1.00 1.00            
202-02-37 removal of 32' x 68' brick residence (rt. of sta.
438+00) (contains friable & non-friable asbestos)
1      EACH 1.00 1.00            
203-01 general excavation 93,616      CUYD 3.00 280,848.00            
203-02 drainage excavation 1,338      CUYD 9.00 12,042.00            
203-03 muck excavation 2,000      CUYD 8.00 16,000.00            
203-04 embankment 247,013      CUYD 7.50 1,852,597.50            
204-02 temporary hay or straw bales 252      EACH 7.00 1,764.00            
204-05-A temporary sediment check dams (hay) 189      EACH 100.00 18,900.00            
204-05-B temporary sediment check dams (stone) 25      EACH 600.00 15,000.00            
204-06 temporary silt fencing 3,965      LNFT 1.30 5,154.50            
401-02 aggregate surface course (adjusted vehicular
measurement)
1,404      CUYD 50.00 70,200.00            
402-01 traffic maintenance aggregate (vehicular measurement) 2,500.0    CUYD 50.00 125,000.00            
509-01 cold planing asphaltic pavement 125,492      SQYD 0.90 112,942.80            
509-02 contractor retained reclaimed asphaltic pavement - 3,486      CUYD 0.01 - 34.86            
701-01-F cross drain pipe (15" rcp/pcp) 732      LNFT 38.00 27,816.00            
701-01-I cross drain pipe (24" rcp/pcp) 950      LNFT 50.00 47,500.00            
701-01-K cross drain pipe (30" rcp/pcp) 192      LNFT 58.00 11,136.00            
701-01-M cross drain pipe (36" rcp/pcp) 520      LNFT 75.00 39,000.00            
701-01-O cross drain pipe (48" rcp/pcp) 720      LNFT 125.00 90,000.00            
701-02-A cross drain pipe arch (15" equiv. rcpa) 1,708      LNFT 50.00 85,400.00            
701-02-D cross drain pipe arch (24" equiv. rcpa) 1,394      LNFT 58.00 80,852.00            
701-02-H cross drain pipe arch (48" equiv. rcpa) 104      LNFT 135.00 14,040.00            
701-02-I cross drain pipe arch (54" equiv. rcpa) 336      LNFT 160.00 53,760.00            
701-02-L cross drain pipe arch (72" equiv. rcpa) 570      LNFT 260.00 148,200.00            
701-05-G side drain pipe (18") 1,310      LNFT 38.00 49,780.00            
701-05-I side drain pipe (24") 706      LNFT 42.00 29,652.00            
701-05-K side drain pipe (30") 568      LNFT 55.00 31,240.00            
701-06-A side drain pipe arch (15" equiv.) 152      LNFT 42.00 6,384.00            
701-06-B side drain pipe arch (18" equiv.) 244      LNFT 54.00 13,176.00            
701-06-D side drain pipe arch (24" equiv.) 232      LNFT 58.00 13,456.00            
701-06-E side drain pipe arch (30" equiv.) 856      LNFT 60.00 51,360.00            
701-06-F side drain pipe arch (36" equiv.) 76      LNFT 70.00 5,320.00            
701-06-H side drain pipe arch (48" equiv.) 144      LNFT 100.00 14,400.00            
701-10-I reinforced concrete pipe (extension)(24") 328      LNFT 70.00 22,960.00            
701-10-K reinforced concrete pipe (extension)(30") 216      LNFT 74.00 15,984.00            
701-10-M reinforced concrete pipe (extension)(36") 194      LNFT 100.00 19,400.00            
702-03-A catch basins (cb-01) 36      EACH 2,200.00 79,200.00            
702-03-B catch basins (cb-02) 2      EACH 3,500.00 7,000.00            
702-07-A cross drain safety end (type 1) 1      EACH 1,600.00 1,600.00            
702-07-B cross drain safety end (type 2) 1      EACH 2,200.00 2,200.00            
705-02 combination mesh & barbed wire fence 26,841      LNFT 4.50 120,784.50            
705-04 single swinging driveway gates 32      EACH 450.00 14,400.00            
705-05 double swinging driveway gates 9      DBGT 600.00 5,400.00            
706-02-C concrete drive (6" thick) 250.0    SQYD 47.00 11,750.00            
708-01 right-of-way monument 115      EACH 120.00 13,800.00            
708-02 right-of-way monument witness post 115      EACH 120.00 13,800.00            
712-02 sacked concrete revetment 104      SQYD 65.00 6,760.00            
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00            
713-07 temporary reflectorized raised pavement markers 963      EACH 4.00 3,852.00            
716-01-A mulch (vegetative) 40.37   ACRE 560.00 22,607.20            
717-01 seeding 3,600      LB 6.00 21,600.00            
718-01 fertilizer 120,000      LB 0.20 24,000.00            
718-02 agricultural lime 240.0    TON 80.00 19,200.00            
720-01-A erosion control system, slope protection (type a) 10,800      SQYD 1.10 11,880.00            
720-01-B erosion control system, slope protection (type b) 856      SQYD 1.10 941.60            
720-01-C erosion control system, flexible channel liner (type c) 967      SQYD 3.20 3,094.40            
720-01-D erosion control system, flexible channel liner (type d) 156      SQYD 3.20 499.20            
722-02 project site laboratory (equipped) 1      EACH 20,000.00 20,000.00            
724-01-C pavement patching (17") 436      SQYD 80.00 34,880.00            
725-01 temporary detour roads 1,188.1    LNFT 120.00 142,572.00            
726-01 bedding material 2,949.7    CUYD 38.00 112,088.60            
727-01 mobilization lump      LUMP 1,600,000.00 1,600,000.00            
729-19-A dead end road installations (type a) 4      EACH 1,100.00 4,400.00            
731-02 reflectorized raised pavement markers 2,521      EACH 4.70 11,848.70            
732-02-A plastic pavement striping (solid line) (4" width) 28.604  MILE 1,900.00 54,347.60            
732-02-C plastic pavement striping (solid line) (8" width) 0.836  MILE 4,300.00 3,594.80            
732-02-E plastic pavement striping (solid line) (24" width) 0.260  MILE 13,000.00 3,380.00            
732-04-A plastic pavement legends & symbols (arrow) 20      EACH 150.00 3,000.00            
732-04-C plastic pavement legends & symbols (only) 16      EACH 150.00 2,400.00            
732-05 removal of existing pavement markings 7.189  MILE 3,200.00 23,004.80            
735-01 mailboxes 84      EACH 1.00 84.00            
735-02 mailbox supports (single) 84      EACH 150.00 12,600.00            
740-01 construction layout lump      LUMP 200,000.00 200,000.00            
744-01 traffic control management lump      LUMP 20,000.00 20,000.00            
805-01-B class a concrete (box culvert headwalls) 2.63   CUYD 1,300.00 3,419.00            
805-12-Y reinforced concrete box culverts (5'x 2')(extension) 104.0    LNFT 210.00 21,840.00            
806-01 deformed reinforcing steel 185      LB 2.00 370.00            
S-001 rumble strips (ground-in) 17.2    MILE 540.00 9,288.00            
S-002 clean existing ditches 180      LNFT 15.00 2,700.00            
S-003 sawcutting existing asphaltic concrete pavement (full
depth)
55,879      INFT 0.80 44,703.20            
S-004 sawcutting existing portland cement concrete pavement
(full depth)
2,416      INFT 1.20 2,899.20            
 SUBTOTAL GENERAL       8,188,793.24            
                       
ALTERNATE A                      
                       
ALTERNATE A1                      
203-05-A nonplastic embankment (stone) 6,433      CUYD 65.00 418,145.00            
302-01 class ii base course 62,634.9    CUYD 50.00 3,131,745.00            
304-05 lime treatment (type e) 1,739.23   TON 200.00 347,846.00            
305-01-D subgrade layer (12" thick) 245,394      SQYD 6.00 1,472,364.00            
502-01 superpave asphaltic concrete 67,816.8    TON 53.00 3,594,290.40            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
8,443.3    TON 62.00 523,484.60            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
7.292  MILE 300.00 2,187.60            
713-05-A temporary pavement markings (solid line)(4" width) 14.582  MILE 500.00 7,291.00            
732-03-A plastic pavement striping (broken line)(4" width) 15.418  MILE 700.00 10,792.60            
 SUBTOTAL ALT A1       9,508,146.20            
                       
ALTERNATE A2                      
203-05-A nonplastic embankment (stone) 6,433      CUYD 0.00 0.00            
302-01 class ii base course 53,950.4    CUYD 0.00 0.00            
304-05 lime treatment (type e) 1,736.61   TON 0.00 0.00            
305-01-D subgrade layer (12" thick) 245,024      SQYD 0.00 0.00            
502-01 superpave asphaltic concrete 18,810.1    TON 0.00 0.00            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,709.2    TON 0.00 0.00            
601-01-G portland cement concrete pavement (8" thick) 142,094.2    SQYD 0.00 0.00            
601-02-G portland cement pavement (8" thick)(crossovers and
turnouts)
19,552.8    SQYD 0.00 0.00            
601-04 portland cement pavement coring 205      EACH 0.00 0.00            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.573  MILE 0.00 0.00            
713-04-B-01 temporary pavement markings (broken line)(4" width)
(10' length) (type 1 removable)
6.719  MILE 0.00 0.00            
713-05-A temporary pavement markings (solid line)(4" width) 1.148  MILE 0.00 0.00            
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type i removable)
13.434  MILE 0.00 0.00            
732-03-A plastic pavement striping (broken line)(4" width) 4.409  MILE 0.00 0.00            
732-03-A-01 plastic pavement striping (broken line)(4" width)
(preformed marking tape- type i)
11.009  MILE 0.00 0.00            
                       
 CONTRACTOR TOTAL       17,696,939.44            