| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - HIGHWAY SPECIALISTS INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
400,000.00 |
400,000.00 |
162,000.00 |
162,000.00 |
300,000.00 |
300,000.00 |
100,000.00 |
100,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
40,000.00 |
40,000.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
| 202-02-B-01 |
removal of concrete box culverts (sta. 276+48; 2 -
2.5' x 4' x 46.5') |
2   |
EACH |
3,500.00 |
7,000.00 |
5,000.00 |
10,000.00 |
1,800.00 |
3,600.00 |
3,000.00 |
6,000.00 |
| 202-02-B-02 |
removal of concrete box culverts (sta. 294+67; 1 - 2'
x 4' x 56.7') |
1   |
EACH |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
1,800.00 |
1,800.00 |
3,000.00 |
3,000.00 |
| 202-02-B-03 |
removal of concrete box culverts (sta. 410+55; 1 - 2'
x 4' x 52.1') |
1   |
EACH |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
1,800.00 |
1,800.00 |
3,000.00 |
3,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
256   |
SQYD |
8.00 |
2,048.00 |
11.00 |
2,816.00 |
25.00 |
6,400.00 |
12.00 |
3,072.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
537.5 |
SQYD |
8.00 |
4,300.00 |
11.00 |
5,912.50 |
5.00 |
2,687.50 |
12.00 |
6,450.00 |
| 202-02-I |
removal of pavement structure
|
12,384.4 |
LNFT |
13.00 |
160,997.20 |
11.00 |
136,228.40 |
6.00 |
74,306.40 |
18.00 |
222,919.20 |
| 202-02-J |
removal of shoulder surfacing
|
5,532.5 |
SQYD |
4.50 |
24,896.25 |
5.00 |
27,662.50 |
9.00 |
49,792.50 |
7.00 |
38,727.50 |
| 202-02-01 |
removal of abandoned rail spur (sta. 398+00)
|
1   |
EACH |
7,500.00 |
7,500.00 |
1.00 |
1.00 |
3,200.00 |
3,200.00 |
5,000.00 |
5,000.00 |
| 202-02-02 |
removal of concrete headwalls
|
10   |
EACH |
1,000.00 |
10,000.00 |
4,000.00 |
40,000.00 |
1,300.00 |
13,000.00 |
1,500.00 |
15,000.00 |
| 202-02-03 |
removal of 4' x 8' sign (lt. of sta. 124+90)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-04 |
removal of 4' x 10' sign (rt. of sta. 125+00)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-05 |
removal of 20' x 32' wood frame commercial building
(lt. of sta. 125+50) |
1   |
EACH |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
900.00 |
900.00 |
900.00 |
900.00 |
| 202-02-06 |
removal of 20' x 16' shed (lt. of sta. 127+00)
|
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
200.00 |
200.00 |
200.00 |
200.00 |
| 202-02-07 |
removal of 30' x 32' metal frame commercial building
(lt of sta. 129+40) |
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
900.00 |
900.00 |
900.00 |
900.00 |
| 202-02-08 |
removal of 2500 sq. ft. metal frame commercial
building (lt. of sta. 130+50)(contains non-friable asbestos) |
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
5,200.00 |
5,200.00 |
| 202-02-09 |
removal of 4' x 8' sign (rt. of sta.130+50)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-10 |
removal of canopy (rt. of sta. 132+50)
|
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
500.00 |
500.00 |
500.00 |
500.00 |
| 202-02-11 |
removal of 12' x 20' sign (lt. of sta. 134+00)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-12 |
removal of 6' x 10' sign (lt. of sta. 137+12)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-13 |
removal of 4' x 8' sign (lt. of sta. 151+10)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-14 |
removal of 28' x 40' brick commercial building (lt. of
sta. 152+50) (contains friable & non-friable asbestos) |
1   |
EACH |
7,500.00 |
7,500.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
5,200.00 |
5,200.00 |
| 202-02-15 |
removal of 8' x 12' sign (lt. of sta. 152+50)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-16 |
removal of 4' x 6' sign (lt. of sta. 159+00)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-17 |
removal of 4' x 8' sign (lt. of sta. 163+50)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-18 |
removal of 10 - 2' x 6' concrete slab (lt. of sta.
165+00) |
1   |
EACH |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
200.00 |
200.00 |
200.00 |
200.00 |
| 202-02-19 |
removal of 4' x 4' sign (lt. of sta. 240+00)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-20 |
removal of metal pole (lt. of sta. 240+25)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-21 |
removal of metal pole (lt. of sta. 240+35)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-22 |
removal of 28' x 85' wood frame residence (lt. of sta.
289+50) (contains non-friable asbestos) |
1   |
EACH |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
5,200.00 |
5,200.00 |
| 202-02-23 |
removal of filled-in pool (rt. of sta. 314+00)
|
1   |
EACH |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
750.00 |
750.00 |
750.00 |
750.00 |
| 202-02-24 |
removal of 200 sq. ft. brick garage (rt. of sta.
325+12) |
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
| 202-02-25 |
removal of 12' x 12' barn (lt. of sta. 325+75)
|
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
500.00 |
500.00 |
500.00 |
500.00 |
| 202-02-26 |
removal of 12' x 20' barn (lt. of sta. 326+00)
|
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
500.00 |
500.00 |
500.00 |
500.00 |
| 202-02-27 |
removal of 32' x 56' brick residence (lt. of sta.
328+00) (contains non-friable asbestos) |
1   |
EACH |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
1,800.00 |
1,800.00 |
5,500.00 |
5,500.00 |
| 202-02-28 |
removal of 600 sq. ft. shed (lt. of sta. 329+30)
|
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
500.00 |
500.00 |
500.00 |
500.00 |
| 202-02-29 |
removal of 40' x 60' wood frame residence (rt. of sta.
348+00) (contains non-friable asbestos) |
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
5,200.00 |
5,200.00 |
| 202-02-30 |
removal of 30' x 56' brick residence (rt. of sta.
351+50) |
1   |
EACH |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
| 202-02-31 |
removal of antenna (rt. of sta. 386+00)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
200.00 |
200.00 |
200.00 |
200.00 |
| 202-02-32 |
removal of 32' x 62' wood frame residence (rt. of sta.
392+00) (contains non-friable asbestos) |
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
5,200.00 |
5,200.00 |
| 202-02-33 |
removal of 4' x 8' sign (rt. of sta. 398+00)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-34 |
removal of 30' x 52' brick residence (rt. of sta.
428+40) (contains friable asbestos) |
1   |
EACH |
7,500.00 |
7,500.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
5,200.00 |
5,200.00 |
| 202-02-35 |
removal of 12' x 22' shed (rt. of sta. 429+80)
|
1   |
EACH |
750.00 |
750.00 |
1.00 |
1.00 |
500.00 |
500.00 |
500.00 |
500.00 |
| 202-02-36 |
removal of 12' x 12' barn (rt. of sta. 429+99)
|
1   |
EACH |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
500.00 |
500.00 |
500.00 |
500.00 |
| 202-02-37 |
removal of 32' x 68' brick residence (rt. of sta.
438+00) (contains friable & non-friable asbestos) |
1   |
EACH |
7,500.00 |
7,500.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
5,200.00 |
5,200.00 |
| 203-01 |
general excavation
|
93,616   |
CUYD |
4.00 |
374,464.00 |
5.78 |
541,100.48 |
3.00 |
280,848.00 |
4.50 |
421,272.00 |
| 203-02 |
drainage excavation
|
1,338   |
CUYD |
6.50 |
8,697.00 |
5.57 |
7,452.66 |
9.00 |
12,042.00 |
10.00 |
13,380.00 |
| 203-03 |
muck excavation
|
2,000   |
CUYD |
6.50 |
13,000.00 |
6.88 |
13,760.00 |
12.00 |
24,000.00 |
16.00 |
32,000.00 |
| 203-04 |
embankment
|
247,013   |
CUYD |
9.00 |
2,223,117.00 |
8.70 |
2,149,013.10 |
8.00 |
1,976,104.00 |
8.50 |
2,099,610.50 |
| 204-02 |
temporary hay or straw bales
|
252   |
EACH |
18.00 |
4,536.00 |
8.00 |
2,016.00 |
7.00 |
1,764.00 |
19.00 |
4,788.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
189   |
EACH |
150.00 |
28,350.00 |
100.00 |
18,900.00 |
95.00 |
17,955.00 |
50.00 |
9,450.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
25   |
EACH |
350.00 |
8,750.00 |
500.00 |
12,500.00 |
100.00 |
2,500.00 |
250.00 |
6,250.00 |
| 204-06 |
temporary silt fencing
|
3,965   |
LNFT |
1.50 |
5,947.50 |
6.00 |
23,790.00 |
1.30 |
5,154.50 |
2.00 |
7,930.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,404   |
CUYD |
50.00 |
70,200.00 |
26.35 |
36,995.40 |
30.00 |
42,120.00 |
26.00 |
36,504.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,500.0 |
CUYD |
50.00 |
125,000.00 |
20.00 |
50,000.00 |
45.00 |
112,500.00 |
35.00 |
87,500.00 |
| 509-01 |
cold planing asphaltic pavement
|
125,492   |
SQYD |
0.90 |
112,942.80 |
1.22 |
153,100.24 |
1.00 |
125,492.00 |
1.25 |
156,865.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,486   |
CUYD |
0.50 |
- 1,743.00 |
0.10 |
- 348.60 |
1.00 |
- 3,486.00 |
0.01 |
- 34.86 |
| 701-01-F |
cross drain pipe (15" rcp/pcp)
|
732   |
LNFT |
34.00 |
24,888.00 |
47.00 |
34,404.00 |
40.00 |
29,280.00 |
75.00 |
54,900.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
950   |
LNFT |
51.00 |
48,450.00 |
58.00 |
55,100.00 |
55.00 |
52,250.00 |
80.00 |
76,000.00 |
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
192   |
LNFT |
68.00 |
13,056.00 |
66.00 |
12,672.00 |
85.00 |
16,320.00 |
115.00 |
22,080.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
520   |
LNFT |
92.00 |
47,840.00 |
89.00 |
46,280.00 |
110.00 |
57,200.00 |
130.00 |
67,600.00 |
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
720   |
LNFT |
150.00 |
108,000.00 |
143.00 |
102,960.00 |
150.00 |
108,000.00 |
195.00 |
140,400.00 |
| 701-02-A |
cross drain pipe arch (15" equiv. rcpa)
|
1,708   |
LNFT |
45.00 |
76,860.00 |
53.00 |
90,524.00 |
75.00 |
128,100.00 |
90.00 |
153,720.00 |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
1,394   |
LNFT |
65.00 |
90,610.00 |
65.00 |
90,610.00 |
85.00 |
118,490.00 |
105.00 |
146,370.00 |
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
104   |
LNFT |
150.00 |
15,600.00 |
193.00 |
20,072.00 |
160.00 |
16,640.00 |
195.00 |
20,280.00 |
| 701-02-I |
cross drain pipe arch (54" equiv. rcpa)
|
336   |
LNFT |
190.00 |
63,840.00 |
183.00 |
61,488.00 |
180.00 |
60,480.00 |
185.00 |
62,160.00 |
| 701-02-L |
cross drain pipe arch (72" equiv. rcpa)
|
570   |
LNFT |
300.00 |
171,000.00 |
287.00 |
163,590.00 |
260.00 |
148,200.00 |
280.00 |
159,600.00 |
| 701-05-G |
side drain pipe (18")
|
1,310   |
LNFT |
35.00 |
45,850.00 |
50.00 |
65,500.00 |
40.00 |
52,400.00 |
24.00 |
31,440.00 |
| 701-05-I |
side drain pipe (24")
|
706   |
LNFT |
52.00 |
36,712.00 |
58.00 |
40,948.00 |
55.00 |
38,830.00 |
30.00 |
21,180.00 |
| 701-05-K |
side drain pipe (30")
|
568   |
LNFT |
66.00 |
37,488.00 |
72.00 |
40,896.00 |
85.00 |
48,280.00 |
40.00 |
22,720.00 |
| 701-06-A |
side drain pipe arch (15" equiv.)
|
152   |
LNFT |
45.00 |
6,840.00 |
69.00 |
10,488.00 |
55.00 |
8,360.00 |
30.00 |
4,560.00 |
| 701-06-B |
side drain pipe arch (18" equiv.)
|
244   |
LNFT |
48.00 |
11,712.00 |
57.00 |
13,908.00 |
60.00 |
14,640.00 |
33.00 |
8,052.00 |
| 701-06-D |
side drain pipe arch (24" equiv.)
|
232   |
LNFT |
65.00 |
15,080.00 |
69.00 |
16,008.00 |
70.00 |
16,240.00 |
40.00 |
9,280.00 |
| 701-06-E |
side drain pipe arch (30" equiv.)
|
856   |
LNFT |
83.00 |
71,048.00 |
73.00 |
62,488.00 |
100.00 |
85,600.00 |
52.00 |
44,512.00 |
| 701-06-F |
side drain pipe arch (36" equiv.)
|
76   |
LNFT |
110.00 |
8,360.00 |
106.00 |
8,056.00 |
120.00 |
9,120.00 |
55.00 |
4,180.00 |
| 701-06-H |
side drain pipe arch (48" equiv.)
|
144   |
LNFT |
165.00 |
23,760.00 |
151.00 |
21,744.00 |
155.00 |
22,320.00 |
120.00 |
17,280.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
328   |
LNFT |
60.00 |
19,680.00 |
115.00 |
37,720.00 |
125.00 |
41,000.00 |
115.00 |
37,720.00 |
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
216   |
LNFT |
85.00 |
18,360.00 |
89.00 |
19,224.00 |
135.00 |
29,160.00 |
125.00 |
27,000.00 |
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
194   |
LNFT |
110.00 |
21,340.00 |
141.00 |
27,354.00 |
150.00 |
29,100.00 |
150.00 |
29,100.00 |
| 702-03-A |
catch basins (cb-01)
|
36   |
EACH |
2,000.00 |
72,000.00 |
3,500.00 |
126,000.00 |
3,200.00 |
115,200.00 |
2,700.00 |
97,200.00 |
| 702-03-B |
catch basins (cb-02)
|
2   |
EACH |
5,000.00 |
10,000.00 |
4,500.00 |
9,000.00 |
4,000.00 |
8,000.00 |
4,000.00 |
8,000.00 |
| 702-07-A |
cross drain safety end (type 1)
|
1   |
EACH |
1,600.00 |
1,600.00 |
4,300.00 |
4,300.00 |
2,300.00 |
2,300.00 |
2,100.00 |
2,100.00 |
| 702-07-B |
cross drain safety end (type 2)
|
1   |
EACH |
1,600.00 |
1,600.00 |
6,500.00 |
6,500.00 |
5,300.00 |
5,300.00 |
15,000.00 |
15,000.00 |
| 705-02 |
combination mesh & barbed wire fence
|
26,841   |
LNFT |
5.75 |
154,335.75 |
5.25 |
140,915.25 |
5.50 |
147,625.50 |
5.00 |
134,205.00 |
| 705-04 |
single swinging driveway gates
|
32   |
EACH |
500.00 |
16,000.00 |
430.00 |
13,760.00 |
600.00 |
19,200.00 |
400.00 |
12,800.00 |
| 705-05 |
double swinging driveway gates
|
9   |
DBGT |
650.00 |
5,850.00 |
600.00 |
5,400.00 |
450.00 |
4,050.00 |
550.00 |
4,950.00 |
| 706-02-C |
concrete drive (6" thick)
|
250.0 |
SQYD |
35.00 |
8,750.00 |
41.00 |
10,250.00 |
40.00 |
10,000.00 |
60.00 |
15,000.00 |
| 708-01 |
right-of-way monument
|
115   |
EACH |
350.00 |
40,250.00 |
108.00 |
12,420.00 |
200.00 |
23,000.00 |
120.00 |
13,800.00 |
| 708-02 |
right-of-way monument witness post
|
115   |
EACH |
350.00 |
40,250.00 |
108.00 |
12,420.00 |
200.00 |
23,000.00 |
75.00 |
8,625.00 |
| 712-02 |
sacked concrete revetment
|
104   |
SQYD |
60.00 |
6,240.00 |
65.00 |
6,760.00 |
100.00 |
10,400.00 |
75.00 |
7,800.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
85,000.00 |
85,000.00 |
290,000.00 |
290,000.00 |
| 713-07 |
temporary reflectorized raised pavement markers
|
963   |
EACH |
4.50 |
4,333.50 |
5.00 |
4,815.00 |
4.00 |
3,852.00 |
4.00 |
3,852.00 |
| 716-01-A |
mulch (vegetative)
|
40.37 |
ACRE |
600.00 |
24,222.00 |
600.00 |
24,222.00 |
550.00 |
22,203.50 |
550.00 |
22,203.50 |
| 717-01 |
seeding
|
3,600   |
LB |
6.50 |
23,400.00 |
6.50 |
23,400.00 |
6.00 |
21,600.00 |
6.00 |
21,600.00 |
| 718-01 |
fertilizer
|
120,000   |
LB |
0.22 |
26,400.00 |
0.20 |
24,000.00 |
0.25 |
30,000.00 |
0.20 |
24,000.00 |
| 718-02 |
agricultural lime
|
240.0 |
TON |
90.00 |
21,600.00 |
86.00 |
20,640.00 |
80.00 |
19,200.00 |
80.00 |
19,200.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
10,800   |
SQYD |
1.00 |
10,800.00 |
1.00 |
10,800.00 |
1.10 |
11,880.00 |
1.00 |
10,800.00 |
| 720-01-B |
erosion control system, slope protection (type b)
|
856   |
SQYD |
1.40 |
1,198.40 |
1.35 |
1,155.60 |
1.10 |
941.60 |
1.25 |
1,070.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
967   |
SQYD |
2.00 |
1,934.00 |
2.00 |
1,934.00 |
3.25 |
3,142.75 |
1.75 |
1,692.25 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
156   |
SQYD |
4.00 |
624.00 |
4.00 |
624.00 |
3.25 |
507.00 |
3.00 |
468.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
27,000.00 |
27,000.00 |
| 724-01-C |
pavement patching (17")
|
436   |
SQYD |
90.00 |
39,240.00 |
110.00 |
47,960.00 |
130.00 |
56,680.00 |
100.00 |
43,600.00 |
| 725-01 |
temporary detour roads
|
1,188.1 |
LNFT |
155.00 |
184,155.50 |
156.00 |
185,343.60 |
100.00 |
118,810.00 |
200.00 |
237,620.00 |
| 726-01 |
bedding material
|
2,949.7 |
CUYD |
65.00 |
191,730.50 |
45.50 |
134,211.35 |
55.00 |
162,233.50 |
65.00 |
191,730.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
1,000,000.00 |
1,000,000.00 |
1,500,000.00 |
1,500,000.00 |
1,600,000.00 |
1,600,000.00 |
1,125,000.00 |
1,125,000.00 |
| 729-19-A |
dead end road installations (type a)
|
4   |
EACH |
1,300.00 |
5,200.00 |
3,200.00 |
12,800.00 |
2,500.00 |
10,000.00 |
3,500.00 |
14,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,521   |
EACH |
5.00 |
12,605.00 |
5.00 |
12,605.00 |
5.00 |
12,605.00 |
5.00 |
12,605.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
28.604 |
MILE |
2,000.00 |
57,208.00 |
2,000.00 |
57,208.00 |
1,850.00 |
52,917.40 |
2,600.00 |
74,370.40 |
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.836 |
MILE |
4,500.00 |
3,762.00 |
4,500.00 |
3,762.00 |
4,200.00 |
3,511.20 |
11,000.00 |
9,196.00 |
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.260 |
MILE |
14,000.00 |
3,640.00 |
13,500.00 |
3,510.00 |
12,000.00 |
3,120.00 |
24,500.00 |
6,370.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
20   |
EACH |
180.00 |
3,600.00 |
160.00 |
3,200.00 |
150.00 |
3,000.00 |
200.00 |
4,000.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
16   |
EACH |
170.00 |
2,720.00 |
160.00 |
2,560.00 |
150.00 |
2,400.00 |
200.00 |
3,200.00 |
| 732-05 |
removal of existing pavement markings
|
7.189 |
MILE |
3,300.00 |
23,723.70 |
3,800.00 |
27,318.20 |
3,200.00 |
23,004.80 |
850.00 |
6,110.65 |
| 735-01 |
mailboxes
|
84   |
EACH |
50.00 |
4,200.00 |
12.00 |
1,008.00 |
10.00 |
840.00 |
5.00 |
420.00 |
| 735-02 |
mailbox supports (single)
|
84   |
EACH |
150.00 |
12,600.00 |
150.00 |
12,600.00 |
125.00 |
10,500.00 |
175.00 |
14,700.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
150,000.00 |
150,000.00 |
100,000.00 |
100,000.00 |
125,000.00 |
125,000.00 |
315,000.00 |
315,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
85,000.00 |
85,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
2.63 |
CUYD |
1,800.00 |
4,734.00 |
1,100.00 |
2,893.00 |
2,200.00 |
5,786.00 |
2,000.00 |
5,260.00 |
| 805-12-Y |
reinforced concrete box culverts (5'x 2')(extension)
|
104.0 |
LNFT |
500.00 |
52,000.00 |
425.00 |
44,200.00 |
400.00 |
41,600.00 |
350.00 |
36,400.00 |
| 806-01 |
deformed reinforcing steel
|
185   |
LB |
5.00 |
925.00 |
2.00 |
370.00 |
1.00 |
185.00 |
6.00 |
1,110.00 |
| S-001 |
rumble strips (ground-in)
|
17.2 |
MILE |
850.00 |
14,620.00 |
810.00 |
13,932.00 |
540.00 |
9,288.00 |
555.00 |
9,546.00 |
| S-002 |
clean existing ditches
|
180   |
LNFT |
12.00 |
2,160.00 |
20.00 |
3,600.00 |
40.00 |
7,200.00 |
15.00 |
2,700.00 |
| S-003 |
sawcutting existing asphaltic concrete pavement (full
depth) |
55,879   |
INFT |
0.40 |
22,351.60 |
1.00 |
55,879.00 |
1.00 |
55,879.00 |
0.40 |
22,351.60 |
| S-004 |
sawcutting existing portland cement concrete pavement
(full depth) |
2,416   |
INFT |
2.00 |
4,832.00 |
1.25 |
3,020.00 |
1.00 |
2,416.00 |
2.00 |
4,832.00 |
| | SUBTOTAL GENERAL |
|
|
|
7,095,521.70 |
|
7,292,264.68 |
|
7,123,431.15 |
|
7,506,368.24 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 203-05-A |
nonplastic embankment (stone)
|
6,433   |
CUYD |
60.00 |
385,980.00 |
63.00 |
405,279.00 |
66.00 |
424,578.00 |
76.00 |
488,908.00 |
| 302-01 |
class ii base course
|
62,634.9 |
CUYD |
50.00 |
3,131,745.00 |
55.00 |
3,444,919.50 |
55.00 |
3,444,919.50 |
59.00 |
3,695,459.10 |
| 304-05 |
lime treatment (type e)
|
1,739.23 |
TON |
1.00 |
1,739.23 |
125.00 |
217,403.75 |
110.00 |
191,315.30 |
120.00 |
208,707.60 |
| 305-01-D |
subgrade layer (12" thick)
|
245,394   |
SQYD |
6.00 |
1,472,364.00 |
5.00 |
1,226,970.00 |
6.00 |
1,472,364.00 |
6.10 |
1,496,903.40 |
| 502-01 |
superpave asphaltic concrete
|
67,816.8 |
TON |
50.00 |
3,390,840.00 |
48.00 |
3,255,206.40 |
53.00 |
3,594,290.40 |
52.00 |
3,526,473.60 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
8,443.3 |
TON |
65.00 |
548,814.50 |
53.00 |
447,494.90 |
75.00 |
633,247.50 |
73.00 |
616,360.90 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.292 |
MILE |
350.00 |
2,552.20 |
320.00 |
2,333.44 |
300.00 |
2,187.60 |
550.00 |
4,010.60 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.582 |
MILE |
550.00 |
8,020.10 |
500.00 |
7,291.00 |
470.00 |
6,853.54 |
650.00 |
9,478.30 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
15.418 |
MILE |
800.00 |
12,334.40 |
750.00 |
11,563.50 |
700.00 |
10,792.60 |
975.00 |
15,032.55 |
| | SUBTOTAL ALT A1 |
|
|
|
8,954,389.43 |
|
9,018,461.49 |
|
9,780,548.44 |
|
10,061,334.05 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
|
|
|
|
|
|
|
|
|
|
|
| 203-05-A |
nonplastic embankment (stone)
|
6,433   |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 302-01 |
class ii base course
|
53,950.4 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 304-05 |
lime treatment (type e)
|
1,736.61 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 305-01-D |
subgrade layer (12" thick)
|
245,024   |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01 |
superpave asphaltic concrete
|
18,810.1 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,709.2 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-01-G |
portland cement concrete pavement (8" thick)
|
142,094.2 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-02-G |
portland cement pavement (8" thick)(crossovers and
turnouts) |
19,552.8 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-04 |
portland cement pavement coring
|
205   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.573 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 713-04-B-01 |
temporary pavement markings (broken line)(4" width)
(10' length) (type 1 removable) |
6.719 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
1.148 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
13.434 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.409 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A-01 |
plastic pavement striping (broken line)(4" width)
(preformed marking tape- type i) |
11.009 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
16,049,911.13 |
|
16,310,726.17 |
|
16,903,979.59 |
|
17,567,702.29 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - DENTON-JAMES LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1,680,000.00 |
1,680,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 202-02-B-01 |
removal of concrete box culverts (sta. 276+48; 2 -
2.5' x 4' x 46.5') |
2   |
EACH |
2,000.00 |
4,000.00 |
|
|
|
|
|
|
| 202-02-B-02 |
removal of concrete box culverts (sta. 294+67; 1 - 2'
x 4' x 56.7') |
1   |
EACH |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 202-02-B-03 |
removal of concrete box culverts (sta. 410+55; 1 - 2'
x 4' x 52.1') |
1   |
EACH |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
256   |
SQYD |
9.00 |
2,304.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
537.5 |
SQYD |
4.00 |
2,150.00 |
|
|
|
|
|
|
| 202-02-I |
removal of pavement structure
|
12,384.4 |
LNFT |
20.00 |
247,688.00 |
|
|
|
|
|
|
| 202-02-J |
removal of shoulder surfacing
|
5,532.5 |
SQYD |
3.00 |
16,597.50 |
|
|
|
|
|
|
| 202-02-01 |
removal of abandoned rail spur (sta. 398+00)
|
1   |
EACH |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 202-02-02 |
removal of concrete headwalls
|
10   |
EACH |
800.00 |
8,000.00 |
|
|
|
|
|
|
| 202-02-03 |
removal of 4' x 8' sign (lt. of sta. 124+90)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-04 |
removal of 4' x 10' sign (rt. of sta. 125+00)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-05 |
removal of 20' x 32' wood frame commercial building
(lt. of sta. 125+50) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-06 |
removal of 20' x 16' shed (lt. of sta. 127+00)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-07 |
removal of 30' x 32' metal frame commercial building
(lt of sta. 129+40) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-08 |
removal of 2500 sq. ft. metal frame commercial
building (lt. of sta. 130+50)(contains non-friable asbestos) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-09 |
removal of 4' x 8' sign (rt. of sta.130+50)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-10 |
removal of canopy (rt. of sta. 132+50)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-11 |
removal of 12' x 20' sign (lt. of sta. 134+00)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-12 |
removal of 6' x 10' sign (lt. of sta. 137+12)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-13 |
removal of 4' x 8' sign (lt. of sta. 151+10)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-14 |
removal of 28' x 40' brick commercial building (lt. of
sta. 152+50) (contains friable & non-friable asbestos) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-15 |
removal of 8' x 12' sign (lt. of sta. 152+50)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-16 |
removal of 4' x 6' sign (lt. of sta. 159+00)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-17 |
removal of 4' x 8' sign (lt. of sta. 163+50)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-18 |
removal of 10 - 2' x 6' concrete slab (lt. of sta.
165+00) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-19 |
removal of 4' x 4' sign (lt. of sta. 240+00)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-20 |
removal of metal pole (lt. of sta. 240+25)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-21 |
removal of metal pole (lt. of sta. 240+35)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-22 |
removal of 28' x 85' wood frame residence (lt. of sta.
289+50) (contains non-friable asbestos) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-23 |
removal of filled-in pool (rt. of sta. 314+00)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-24 |
removal of 200 sq. ft. brick garage (rt. of sta.
325+12) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-25 |
removal of 12' x 12' barn (lt. of sta. 325+75)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-26 |
removal of 12' x 20' barn (lt. of sta. 326+00)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-27 |
removal of 32' x 56' brick residence (lt. of sta.
328+00) (contains non-friable asbestos) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-28 |
removal of 600 sq. ft. shed (lt. of sta. 329+30)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-29 |
removal of 40' x 60' wood frame residence (rt. of sta.
348+00) (contains non-friable asbestos) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-30 |
removal of 30' x 56' brick residence (rt. of sta.
351+50) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-31 |
removal of antenna (rt. of sta. 386+00)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-32 |
removal of 32' x 62' wood frame residence (rt. of sta.
392+00) (contains non-friable asbestos) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-33 |
removal of 4' x 8' sign (rt. of sta. 398+00)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-34 |
removal of 30' x 52' brick residence (rt. of sta.
428+40) (contains friable asbestos) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-35 |
removal of 12' x 22' shed (rt. of sta. 429+80)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-36 |
removal of 12' x 12' barn (rt. of sta. 429+99)
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 202-02-37 |
removal of 32' x 68' brick residence (rt. of sta.
438+00) (contains friable & non-friable asbestos) |
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
93,616   |
CUYD |
3.00 |
280,848.00 |
|
|
|
|
|
|
| 203-02 |
drainage excavation
|
1,338   |
CUYD |
9.00 |
12,042.00 |
|
|
|
|
|
|
| 203-03 |
muck excavation
|
2,000   |
CUYD |
8.00 |
16,000.00 |
|
|
|
|
|
|
| 203-04 |
embankment
|
247,013   |
CUYD |
7.50 |
1,852,597.50 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
252   |
EACH |
7.00 |
1,764.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
189   |
EACH |
100.00 |
18,900.00 |
|
|
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
25   |
EACH |
600.00 |
15,000.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
3,965   |
LNFT |
1.30 |
5,154.50 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,404   |
CUYD |
50.00 |
70,200.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,500.0 |
CUYD |
50.00 |
125,000.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
125,492   |
SQYD |
0.90 |
112,942.80 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,486   |
CUYD |
0.01 |
- 34.86 |
|
|
|
|
|
|
| 701-01-F |
cross drain pipe (15" rcp/pcp)
|
732   |
LNFT |
38.00 |
27,816.00 |
|
|
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
950   |
LNFT |
50.00 |
47,500.00 |
|
|
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
192   |
LNFT |
58.00 |
11,136.00 |
|
|
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
520   |
LNFT |
75.00 |
39,000.00 |
|
|
|
|
|
|
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
720   |
LNFT |
125.00 |
90,000.00 |
|
|
|
|
|
|
| 701-02-A |
cross drain pipe arch (15" equiv. rcpa)
|
1,708   |
LNFT |
50.00 |
85,400.00 |
|
|
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
1,394   |
LNFT |
58.00 |
80,852.00 |
|
|
|
|
|
|
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
104   |
LNFT |
135.00 |
14,040.00 |
|
|
|
|
|
|
| 701-02-I |
cross drain pipe arch (54" equiv. rcpa)
|
336   |
LNFT |
160.00 |
53,760.00 |
|
|
|
|
|
|
| 701-02-L |
cross drain pipe arch (72" equiv. rcpa)
|
570   |
LNFT |
260.00 |
148,200.00 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
1,310   |
LNFT |
38.00 |
49,780.00 |
|
|
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
706   |
LNFT |
42.00 |
29,652.00 |
|
|
|
|
|
|
| 701-05-K |
side drain pipe (30")
|
568   |
LNFT |
55.00 |
31,240.00 |
|
|
|
|
|
|
| 701-06-A |
side drain pipe arch (15" equiv.)
|
152   |
LNFT |
42.00 |
6,384.00 |
|
|
|
|
|
|
| 701-06-B |
side drain pipe arch (18" equiv.)
|
244   |
LNFT |
54.00 |
13,176.00 |
|
|
|
|
|
|
| 701-06-D |
side drain pipe arch (24" equiv.)
|
232   |
LNFT |
58.00 |
13,456.00 |
|
|
|
|
|
|
| 701-06-E |
side drain pipe arch (30" equiv.)
|
856   |
LNFT |
60.00 |
51,360.00 |
|
|
|
|
|
|
| 701-06-F |
side drain pipe arch (36" equiv.)
|
76   |
LNFT |
70.00 |
5,320.00 |
|
|
|
|
|
|
| 701-06-H |
side drain pipe arch (48" equiv.)
|
144   |
LNFT |
100.00 |
14,400.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
328   |
LNFT |
70.00 |
22,960.00 |
|
|
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
216   |
LNFT |
74.00 |
15,984.00 |
|
|
|
|
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
194   |
LNFT |
100.00 |
19,400.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
36   |
EACH |
2,200.00 |
79,200.00 |
|
|
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
2   |
EACH |
3,500.00 |
7,000.00 |
|
|
|
|
|
|
| 702-07-A |
cross drain safety end (type 1)
|
1   |
EACH |
1,600.00 |
1,600.00 |
|
|
|
|
|
|
| 702-07-B |
cross drain safety end (type 2)
|
1   |
EACH |
2,200.00 |
2,200.00 |
|
|
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
26,841   |
LNFT |
4.50 |
120,784.50 |
|
|
|
|
|
|
| 705-04 |
single swinging driveway gates
|
32   |
EACH |
450.00 |
14,400.00 |
|
|
|
|
|
|
| 705-05 |
double swinging driveway gates
|
9   |
DBGT |
600.00 |
5,400.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
250.0 |
SQYD |
47.00 |
11,750.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
115   |
EACH |
120.00 |
13,800.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
115   |
EACH |
120.00 |
13,800.00 |
|
|
|
|
|
|
| 712-02 |
sacked concrete revetment
|
104   |
SQYD |
65.00 |
6,760.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
963   |
EACH |
4.00 |
3,852.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
40.37 |
ACRE |
560.00 |
22,607.20 |
|
|
|
|
|
|
| 717-01 |
seeding
|
3,600   |
LB |
6.00 |
21,600.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
120,000   |
LB |
0.20 |
24,000.00 |
|
|
|
|
|
|
| 718-02 |
agricultural lime
|
240.0 |
TON |
80.00 |
19,200.00 |
|
|
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
10,800   |
SQYD |
1.10 |
11,880.00 |
|
|
|
|
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
856   |
SQYD |
1.10 |
941.60 |
|
|
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
967   |
SQYD |
3.20 |
3,094.40 |
|
|
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
156   |
SQYD |
3.20 |
499.20 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 724-01-C |
pavement patching (17")
|
436   |
SQYD |
80.00 |
34,880.00 |
|
|
|
|
|
|
| 725-01 |
temporary detour roads
|
1,188.1 |
LNFT |
120.00 |
142,572.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
2,949.7 |
CUYD |
38.00 |
112,088.60 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,600,000.00 |
1,600,000.00 |
|
|
|
|
|
|
| 729-19-A |
dead end road installations (type a)
|
4   |
EACH |
1,100.00 |
4,400.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,521   |
EACH |
4.70 |
11,848.70 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
28.604 |
MILE |
1,900.00 |
54,347.60 |
|
|
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.836 |
MILE |
4,300.00 |
3,594.80 |
|
|
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.260 |
MILE |
13,000.00 |
3,380.00 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
20   |
EACH |
150.00 |
3,000.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
16   |
EACH |
150.00 |
2,400.00 |
|
|
|
|
|
|
| 732-05 |
removal of existing pavement markings
|
7.189 |
MILE |
3,200.00 |
23,004.80 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
84   |
EACH |
1.00 |
84.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
84   |
EACH |
150.00 |
12,600.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
2.63 |
CUYD |
1,300.00 |
3,419.00 |
|
|
|
|
|
|
| 805-12-Y |
reinforced concrete box culverts (5'x 2')(extension)
|
104.0 |
LNFT |
210.00 |
21,840.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
185   |
LB |
2.00 |
370.00 |
|
|
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
17.2 |
MILE |
540.00 |
9,288.00 |
|
|
|
|
|
|
| S-002 |
clean existing ditches
|
180   |
LNFT |
15.00 |
2,700.00 |
|
|
|
|
|
|
| S-003 |
sawcutting existing asphaltic concrete pavement (full
depth) |
55,879   |
INFT |
0.80 |
44,703.20 |
|
|
|
|
|
|
| S-004 |
sawcutting existing portland cement concrete pavement
(full depth) |
2,416   |
INFT |
1.20 |
2,899.20 |
|
|
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
8,188,793.24 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 203-05-A |
nonplastic embankment (stone)
|
6,433   |
CUYD |
65.00 |
418,145.00 |
|
|
|
|
|
|
| 302-01 |
class ii base course
|
62,634.9 |
CUYD |
50.00 |
3,131,745.00 |
|
|
|
|
|
|
| 304-05 |
lime treatment (type e)
|
1,739.23 |
TON |
200.00 |
347,846.00 |
|
|
|
|
|
|
| 305-01-D |
subgrade layer (12" thick)
|
245,394   |
SQYD |
6.00 |
1,472,364.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
67,816.8 |
TON |
53.00 |
3,594,290.40 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
8,443.3 |
TON |
62.00 |
523,484.60 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.292 |
MILE |
300.00 |
2,187.60 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.582 |
MILE |
500.00 |
7,291.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
15.418 |
MILE |
700.00 |
10,792.60 |
|
|
|
|
|
|
| | SUBTOTAL ALT A1 |
|
|
|
9,508,146.20 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
|
|
|
|
|
|
|
|
|
|
|
| 203-05-A |
nonplastic embankment (stone)
|
6,433   |
CUYD |
0.00 |
0.00 |
|
|
|
|
|
|
| 302-01 |
class ii base course
|
53,950.4 |
CUYD |
0.00 |
0.00 |
|
|
|
|
|
|
| 304-05 |
lime treatment (type e)
|
1,736.61 |
TON |
0.00 |
0.00 |
|
|
|
|
|
|
| 305-01-D |
subgrade layer (12" thick)
|
245,024   |
SQYD |
0.00 |
0.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
18,810.1 |
TON |
0.00 |
0.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,709.2 |
TON |
0.00 |
0.00 |
|
|
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
142,094.2 |
SQYD |
0.00 |
0.00 |
|
|
|
|
|
|
| 601-02-G |
portland cement pavement (8" thick)(crossovers and
turnouts) |
19,552.8 |
SQYD |
0.00 |
0.00 |
|
|
|
|
|
|
| 601-04 |
portland cement pavement coring
|
205   |
EACH |
0.00 |
0.00 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.573 |
MILE |
0.00 |
0.00 |
|
|
|
|
|
|
| 713-04-B-01 |
temporary pavement markings (broken line)(4" width)
(10' length) (type 1 removable) |
6.719 |
MILE |
0.00 |
0.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
1.148 |
MILE |
0.00 |
0.00 |
|
|
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
13.434 |
MILE |
0.00 |
0.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.409 |
MILE |
0.00 |
0.00 |
|
|
|
|
|
|
| 732-03-A-01 |
plastic pavement striping (broken line)(4" width)
(preformed marking tape- type i) |
11.009 |
MILE |
0.00 |
0.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
17,696,939.44 |
|
|
|
|
|
|
|