| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DENTON-JAMES LLC |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - GULF SOUTH PILING & CONST., INC. |
- 4 - JAMES CONSTRUCTION GROUP LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
100,000.00 |
100,000.00 |
115,000.00 |
115,000.00 |
60,000.00 |
60,000.00 |
85,000.00 |
85,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
20,000.00 |
20,000.00 |
6,000.00 |
6,000.00 |
| 202-02-A |
removal of bridges (sta 113+24.8; 19' x 258', steel
truss bridge) |
1   |
EACH |
80,000.00 |
80,000.00 |
30,000.00 |
30,000.00 |
75,000.00 |
75,000.00 |
150,000.00 |
150,000.00 |
| 203-02 |
drainage excavation
|
209   |
CUYD |
10.00 |
2,090.00 |
25.00 |
5,225.00 |
25.00 |
5,225.00 |
20.00 |
4,180.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
60,000.00 |
60,000.00 |
56,000.00 |
56,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
100.00 |
600.00 |
200.00 |
1,200.00 |
100.00 |
600.00 |
100.00 |
600.00 |
| 204-06 |
temporary silt fencing
|
1,700   |
LNFT |
1.60 |
2,720.00 |
2.00 |
3,400.00 |
1.60 |
2,720.00 |
2.00 |
3,400.00 |
| 302-01-A |
class ii base course (crushed stone or recycled pccp)
|
404.5 |
CUYD |
80.00 |
32,360.00 |
85.00 |
34,382.50 |
80.00 |
32,360.00 |
55.00 |
22,247.50 |
| 304-01 |
lime
|
17.19 |
TON |
140.00 |
2,406.60 |
100.00 |
1,719.00 |
100.00 |
1,719.00 |
130.00 |
2,234.70 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,212   |
SQYD |
2.50 |
3,030.00 |
1.00 |
1,212.00 |
5.00 |
6,060.00 |
4.00 |
4,848.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
8   |
CUYD |
70.00 |
560.00 |
100.00 |
800.00 |
100.00 |
800.00 |
45.00 |
360.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
52.00 |
5,200.00 |
10.00 |
1,000.00 |
75.00 |
7,500.00 |
42.00 |
4,200.00 |
| 502-01 |
superpave asphaltic concrete
|
468.9 |
TON |
100.00 |
46,890.00 |
80.00 |
37,512.00 |
84.00 |
39,387.60 |
80.00 |
37,512.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
84.8 |
TON |
120.00 |
10,176.00 |
100.00 |
8,480.00 |
84.00 |
7,123.20 |
80.00 |
6,784.00 |
| 701-05-G |
side drain pipe (18")
|
680   |
LNFT |
38.00 |
25,840.00 |
45.00 |
30,600.00 |
50.00 |
34,000.00 |
55.00 |
37,400.00 |
| 704-03 |
blocked out guard rail
|
12.5 |
LNFT |
20.00 |
250.00 |
25.00 |
312.50 |
20.00 |
250.00 |
20.00 |
250.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
40.00 |
4,000.00 |
45.00 |
4,500.00 |
40.00 |
4,000.00 |
53.00 |
5,300.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
2,200.00 |
8,800.00 |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
| 705-01 |
barbed wire fence
|
1,248   |
LNFT |
5.00 |
6,240.00 |
7.00 |
8,736.00 |
5.00 |
6,240.00 |
5.00 |
6,240.00 |
| 705-02 |
combination mesh & barbed wire fence
|
156   |
LNFT |
5.70 |
889.20 |
6.75 |
1,053.00 |
6.00 |
936.00 |
6.00 |
936.00 |
| 705-04 |
single swinging driveway gates
|
1   |
EACH |
800.00 |
800.00 |
300.00 |
300.00 |
800.00 |
800.00 |
1,000.00 |
1,000.00 |
| 705-09 |
rebuilt fence
|
75   |
LNFT |
18.00 |
1,350.00 |
5.00 |
375.00 |
20.00 |
1,500.00 |
20.00 |
1,500.00 |
| 708-01 |
right-of-way monument
|
19   |
EACH |
120.00 |
2,280.00 |
200.00 |
3,800.00 |
125.00 |
2,375.00 |
200.00 |
3,800.00 |
| 708-02 |
right-of-way monument witness post
|
19   |
EACH |
120.00 |
2,280.00 |
160.00 |
3,040.00 |
150.00 |
2,850.00 |
200.00 |
3,800.00 |
| 711-01-E |
riprap (130 lb, 24" thick)
|
1,147   |
SQYD |
48.00 |
55,056.00 |
75.00 |
86,025.00 |
65.00 |
74,555.00 |
65.00 |
74,555.00 |
| 711-04 |
geotextile fabric
|
1,649   |
SQYD |
1.50 |
2,473.50 |
2.50 |
4,122.50 |
2.00 |
3,298.00 |
2.50 |
4,122.50 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
39,000.00 |
39,000.00 |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
| 717-01 |
seeding
|
34   |
LB |
18.00 |
612.00 |
20.00 |
680.00 |
20.00 |
680.00 |
20.00 |
680.00 |
| 718-01 |
fertilizer
|
1,128   |
LB |
0.60 |
676.80 |
1.00 |
1,128.00 |
0.60 |
676.80 |
0.60 |
676.80 |
| 722-01 |
project site laboratory
|
1   |
EACH |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
5,000.00 |
5,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
120,000.00 |
120,000.00 |
126,000.00 |
126,000.00 |
140,000.00 |
140,000.00 |
140,000.00 |
140,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
65.00 |
260.00 |
80.00 |
320.00 |
65.00 |
260.00 |
75.00 |
300.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
30   |
EACH |
22.00 |
660.00 |
25.00 |
750.00 |
23.00 |
690.00 |
22.50 |
675.00 |
| 731-02 |
reflectorized raised pavement markers
|
63   |
EACH |
11.00 |
693.00 |
12.00 |
756.00 |
12.00 |
756.00 |
11.05 |
696.15 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.429 |
MILE |
4,000.00 |
1,716.00 |
5,000.00 |
2,145.00 |
4,200.00 |
1,801.80 |
4,100.00 |
1,758.90 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.189 |
MILE |
1,600.00 |
302.40 |
2,000.00 |
378.00 |
1,600.00 |
302.40 |
1,600.00 |
302.40 |
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
28,000.00 |
28,000.00 |
50,000.00 |
50,000.00 |
20,000.00 |
20,000.00 |
| 804-01-B |
precast concrete piles (14")
|
200   |
LNFT |
80.00 |
16,000.00 |
40.00 |
8,000.00 |
75.00 |
15,000.00 |
40.00 |
8,000.00 |
| 804-01-G |
precast concrete piles (30")
|
1,680   |
LNFT |
114.00 |
191,520.00 |
120.00 |
201,600.00 |
120.00 |
201,600.00 |
125.00 |
210,000.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
| 805-01-F |
class a concrete (bents)
|
91.81 |
CUYD |
700.00 |
64,267.00 |
625.00 |
57,381.25 |
600.00 |
55,086.00 |
600.00 |
55,086.00 |
| 805-03 |
class aa concrete
|
254.08 |
CUYD |
520.00 |
132,121.60 |
618.00 |
157,021.44 |
500.00 |
127,040.00 |
500.00 |
127,040.00 |
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
1,074.0 |
LNFT |
100.00 |
107,400.00 |
135.00 |
144,990.00 |
140.00 |
150,360.00 |
150.00 |
161,100.00 |
| 805-11 |
strip seal joints
|
60.00 |
LNFT |
130.00 |
7,800.00 |
125.00 |
7,500.00 |
150.00 |
9,000.00 |
130.00 |
7,800.00 |
| 806-01 |
deformed reinforcing steel
|
88,520   |
LB |
0.60 |
53,112.00 |
0.72 |
63,734.40 |
0.75 |
66,390.00 |
0.75 |
66,390.00 |
| 807-06 |
structural metalwork
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
| 810-01 |
concrete railing (barrier)
|
620.00 |
LNFT |
47.00 |
29,140.00 |
45.00 |
27,900.00 |
45.00 |
27,900.00 |
45.00 |
27,900.00 |
| 813-01 |
concrete approach slabs
|
266.46 |
SQYD |
150.00 |
39,969.00 |
195.00 |
51,959.70 |
180.00 |
47,962.80 |
150.00 |
39,969.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,272,741.10 |
|
1,378,938.29 |
|
1,428,804.60 |
|
1,429,643.95 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - SHAVERS-WHITTLE CONSTRUCTION INC |
- 6 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,000.00 |
25,000.00 |
55,000.00 |
55,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
7,500.00 |
7,500.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 202-02-A |
removal of bridges (sta 113+24.8; 19' x 258', steel
truss bridge) |
1   |
EACH |
75,000.00 |
75,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
209   |
CUYD |
16.50 |
3,448.50 |
6.30 |
1,316.70 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
45,000.00 |
45,000.00 |
47,000.00 |
47,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
85.00 |
510.00 |
160.00 |
960.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,700   |
LNFT |
1.00 |
1,700.00 |
1.25 |
2,125.00 |
|
|
|
|
| 302-01-A |
class ii base course (crushed stone or recycled pccp)
|
404.5 |
CUYD |
60.00 |
24,270.00 |
56.50 |
22,854.25 |
|
|
|
|
| 304-01 |
lime
|
17.19 |
TON |
1.75 |
30.08 |
150.00 |
2,578.50 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,212   |
SQYD |
2.95 |
3,575.40 |
3.20 |
3,878.40 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
8   |
CUYD |
56.00 |
448.00 |
110.00 |
880.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
25.00 |
2,500.00 |
56.00 |
5,600.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
468.9 |
TON |
105.00 |
49,234.50 |
90.00 |
42,201.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
84.8 |
TON |
115.00 |
9,752.00 |
96.00 |
8,140.80 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
680   |
LNFT |
35.00 |
23,800.00 |
40.00 |
27,200.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
12.5 |
LNFT |
25.00 |
312.50 |
22.00 |
275.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
45.00 |
4,500.00 |
51.00 |
5,100.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,600.00 |
10,400.00 |
2,200.00 |
8,800.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
1,248   |
LNFT |
8.00 |
9,984.00 |
5.50 |
6,864.00 |
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
156   |
LNFT |
8.00 |
1,248.00 |
6.20 |
967.20 |
|
|
|
|
| 705-04 |
single swinging driveway gates
|
1   |
EACH |
350.00 |
350.00 |
800.00 |
800.00 |
|
|
|
|
| 705-09 |
rebuilt fence
|
75   |
LNFT |
6.00 |
450.00 |
15.00 |
1,125.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
19   |
EACH |
100.00 |
1,900.00 |
55.00 |
1,045.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
19   |
EACH |
125.00 |
2,375.00 |
30.00 |
570.00 |
|
|
|
|
| 711-01-E |
riprap (130 lb, 24" thick)
|
1,147   |
SQYD |
38.00 |
43,586.00 |
56.50 |
64,805.50 |
|
|
|
|
| 711-04 |
geotextile fabric
|
1,649   |
SQYD |
1.75 |
2,885.75 |
1.65 |
2,720.85 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 717-01 |
seeding
|
34   |
LB |
10.00 |
340.00 |
9.00 |
306.00 |
|
|
|
|
| 718-01 |
fertilizer
|
1,128   |
LB |
0.25 |
282.00 |
0.25 |
282.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
35,000.00 |
35,000.00 |
7,000.00 |
7,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
120,000.00 |
120,000.00 |
290,000.00 |
290,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
85.00 |
340.00 |
95.00 |
380.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
30   |
EACH |
13.00 |
390.00 |
13.40 |
402.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
63   |
EACH |
8.00 |
504.00 |
8.80 |
554.40 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.429 |
MILE |
5,500.00 |
2,359.50 |
5,100.00 |
2,187.90 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.189 |
MILE |
2,500.00 |
472.50 |
2,600.00 |
491.40 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
34,000.00 |
34,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
200   |
LNFT |
50.00 |
10,000.00 |
46.20 |
9,240.00 |
|
|
|
|
| 804-01-G |
precast concrete piles (30")
|
1,680   |
LNFT |
205.00 |
344,400.00 |
181.35 |
304,668.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
91.81 |
CUYD |
850.00 |
78,038.50 |
640.00 |
58,758.40 |
|
|
|
|
| 805-03 |
class aa concrete
|
254.08 |
CUYD |
650.00 |
165,152.00 |
395.00 |
100,361.60 |
|
|
|
|
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
1,074.0 |
LNFT |
135.00 |
144,990.00 |
106.00 |
113,844.00 |
|
|
|
|
| 805-11 |
strip seal joints
|
60.00 |
LNFT |
130.00 |
7,800.00 |
167.00 |
10,020.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
88,520   |
LB |
0.75 |
66,390.00 |
0.81 |
71,701.20 |
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
2,500.00 |
2,500.00 |
2,200.00 |
2,200.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
620.00 |
LNFT |
60.00 |
37,200.00 |
49.50 |
30,690.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
266.46 |
SQYD |
150.00 |
39,969.00 |
168.70 |
44,951.80 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,455,887.23 |
|
1,565,845.90 |
|
|
|
|
|