DBE GOAL FED
Lead Project: 742-26-0059
Parish: JEFFERSON
Routes:
Description: VETERANS BLVD OVLY PHASE III DAVID DR TO CLEARVIEW PKWY
Type Const: class ii bc, drainage structures, cold planing asph pvmt, pavement patching, superpave
acp, roadway reinforcing mesh, and related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC $2,924,497.30
202179 BOH BROS. CONSTRUCTION CO., LLC. $3,626,643.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-E removal of concrete curbs 1,454.0    LNFT 11.00 15,994.00 12.00 17,448.00        
202-02-F removal of concrete combination curb & gutter 6,283.0    LNFT 11.00 69,113.00 12.00 75,396.00        
202-02-I removal of concrete median 352      SQYD 11.00 3,872.00 12.00 4,224.00        
202-02-J removal of asphaltic concrete median 270      SQYD 11.00 2,970.00 12.00 3,240.00        
204-02 temporary hay or straw bales 950      EACH 3.00 2,850.00 5.00 4,750.00        
204-06 temporary silt fencing 10,800      LNFT 1.00 10,800.00 2.00 21,600.00        
302-02-D class ii base course (12" thick) 2,140.0    SQYD 15.00 32,100.00 20.00 42,800.00        
502-01 superpave asphaltic concrete 17,842.6    TON 56.00 999,185.60 55.00 981,343.00        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,276.6    TON 56.00 71,489.60 70.00 89,362.00        
509-01 cold planing asphaltic pavement 86,482      SQYD 3.00 259,446.00 4.00 345,928.00        
701-03-E storm drain pipe (12" sdr 26) 18      LNFT 300.00 5,400.00 100.00 1,800.00        
701-14 cleaning existing pipes 22,763      LNFT 5.00 113,815.00 5.50 125,196.50        
702-03-A catch basins (cb-01) 3      EACH 4,000.00 12,000.00 7,000.00 21,000.00        
702-04-B adjusting catch basins 9      EACH 500.00 4,500.00 1,000.00 9,000.00        
702-04-E adjusting drain inlets 4      EACH 500.00 2,000.00 2,500.00 10,000.00        
706-01-A concrete walk (4" thick) 389.5    SQYD 75.00 29,212.50 90.00 35,055.00        
706-03-A incidental concrete paving (4" thick) 622.0    SQYD 37.00 23,014.00 50.00 31,100.00        
707-01 concrete curb 1,454.0    LNFT 32.00 46,528.00 35.00 50,890.00        
707-03 combination concrete curb & gutter 6,283.0    LNFT 32.00 201,056.00 35.00 219,905.00        
713-01 temporary signs & barricades lump      LUMP 150,000.00 150,000.00 300,000.00 300,000.00        
713-03-C temporary pavement markings (8" width) 5,280      LNFT 0.10 528.00 0.35 1,848.00        
713-03-D temporary pavement markings (12" width) 2,235      LNFT 0.10 223.50 0.50 1,117.50        
713-03-E temporary pavement markings (24" width) 2,673      LNFT 0.10 267.30 1.00 2,673.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
16.860  MILE 120.00 2,023.20 340.00 5,732.40        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
16.680  MILE 10.00 166.80 340.00 5,671.20        
713-05-A temporary pavement markings (solid line)(4" width) 16.680  MILE 10.00 166.80 550.00 9,174.00        
713-06-A temporary pavement legends and symbols (arrow) 108      EACH 5.00 540.00 60.00 6,480.00        
713-06-C temporary pavement legends and symbols (only) 12      EACH 10.00 120.00 90.00 1,080.00        
722-01 project site laboratory 1      EACH 10,000.00 10,000.00 5,000.00 5,000.00        
724-01-A pavement patching (6" minimum thickness) 1,487      SQYD 40.00 59,480.00 40.00 59,480.00        
724-01-B pavement patching (12" minimum thickness) 1,638      SQYD 50.00 81,900.00 68.00 111,384.00        
727-01 mobilization lump      LUMP 290,000.00 290,000.00 350,000.00 350,000.00        
731-02 reflectorized raised pavement markers 1,085      EACH 5.00 5,425.00 6.00 6,510.00        
732-01-C plastic pavement striping (8" width) 1,760      LNFT 1.00 1,760.00 1.00 1,760.00        
732-01-D plastic pavement striping (12" width) 745      LNFT 1.40 1,043.00 1.50 1,117.50        
732-01-E plastic pavement striping (24" width) 891      LNFT 3.00 2,673.00 3.00 2,673.00        
732-02-A plastic pavement striping (solid line) (4" width) 5.560  MILE 1,800.00 10,008.00 2,000.00 11,120.00        
732-03-A plastic pavement striping (broken line)(4" width) 5.560  MILE 700.00 3,892.00 800.00 4,448.00        
736-09 loop detector 2,562      LNFT 12.00 30,744.00 13.00 33,306.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 20,000.00 20,000.00        
S-001 roadway reinforcing mesh (complete road system) 82,429      SQYD 4.00 329,716.00 6.60 544,031.40        
S-002 cleaning and resealing random cracks in asphaltic
concrete
3,000      LNFT 1.50 4,500.00 3.00 9,000.00        
S-003 cleaning existing catch basins 81      EACH 65.00 5,265.00 200.00 16,200.00        
S-004 cleaning existing drain inlets 134      EACH 65.00 8,710.00 200.00 26,800.00        
                       
 CONTRACTOR TOTAL       2,924,497.30   3,626,643.50        