Letting of 6/08/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 742-26-0055
Parish: JEFFERSON
Routes:
Description: LAPALCO BOULEVARD OVERLAY(PHASE 4)
Type Const: drainage structures, cold planing asph pvmt, superpave asph concrete overlay, pavement
patching, and related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC $1,437,247.00
202179 BOH BROS. CONSTRUCTION CO., LLC. $1,893,454.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-F removal of concrete combination curb & gutter 1,459.0    LNFT 12.00 17,508.00 16.00 23,344.00        
202-02-01 removal of concrete island 44      SQYD 15.00 660.00 100.00 4,400.00        
204-02 temporary hay or straw bales 20      EACH 10.00 200.00 20.00 400.00        
204-06 temporary silt fencing 200      LNFT 4.00 800.00 20.00 4,000.00        
305-01 subgrade layer (12" thick) 30      SQYD 75.00 2,250.00 150.00 4,500.00        
502-01 superpave asphaltic concrete 9,811.0    TON 58.00 569,038.00 64.00 627,904.00        
502-01-A superpave asphaltic concrete binder (level 2)
(variable thickness)
668.0    TON 80.00 53,440.00 64.00 42,752.00        
509-01 cold planing asphaltic pavement 31,796      SQYD 4.00 127,184.00 3.50 111,286.00        
701-03-F storm drain pipe (15" rcp/pcp) 200      LNFT 25.00 5,000.00 90.00 18,000.00        
701-14 cleaning existing pipes 5,031      LNFT 4.00 20,124.00 30.00 150,930.00        
702-03-A catch basins (cb-01) 4      EACH 2,500.00 10,000.00 4,700.00 18,800.00        
702-03-C catch basins (cb-06) 4      EACH 2,500.00 10,000.00 5,900.00 23,600.00        
702-04-A adjusting manholes 2      EACH 200.00 400.00 2,500.00 5,000.00        
702-04-B adjusting catch basins 9      EACH 2,000.00 18,000.00 800.00 7,200.00        
704-03 blocked out guard rail 50.0    LNFT 20.00 1,000.00 22.00 1,100.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 42.00 4,200.00 60.00 6,000.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,100.00 8,400.00 2,400.00 9,600.00        
706-01-A concrete walk (4" thick) 53.0    SQYD 50.00 2,650.00 60.00 3,180.00        
706-03-A incidental concrete paving (4" thick) 65.0    SQYD 80.00 5,200.00 100.00 6,500.00        
707-01 concrete curb 120.0    LNFT 26.00 3,120.00 32.00 3,840.00        
707-01-B concrete curb (pinned barrier vertical extension) 5,000.0    LNFT 24.00 120,000.00 27.00 135,000.00        
707-03 combination concrete curb & gutter 1,459.0    LNFT 32.00 46,688.00 36.00 52,524.00        
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 150,000.00 150,000.00        
713-02 temporary pavement markings lump      LUMP 4,500.00 4,500.00 4,000.00 4,000.00        
720-01-A erosion control system, slope protection (type a) 500      SQYD 5.00 2,500.00 6.00 3,000.00        
722-01 project site laboratory 1      EACH 5,000.00 5,000.00 3,000.00 3,000.00        
724-01-A pavement patching (6" minimum thickness) 50      SQYD 40.00 2,000.00 80.00 4,000.00        
724-01-B pavement patching (12" minimum thickness) 64      SQYD 75.00 4,800.00 100.00 6,400.00        
726-01 bedding material 25.0    CUYD 35.00 875.00 120.00 3,000.00        
727-01 mobilization lump      LUMP 140,000.00 140,000.00 180,000.00 180,000.00        
731-02 reflectorized raised pavement markers 470      EACH 5.50 2,585.00 6.00 2,820.00        
732-02-A plastic pavement striping (solid line) (4" width) 2.630  MILE 2,000.00 5,260.00 2,300.00 6,049.00        
732-02-C plastic pavement striping (solid line) (8" width) 0.280  MILE 4,000.00 1,120.00 4,600.00 1,288.00        
732-02-E plastic pavement striping (solid line) (24" width) 0.050  MILE 12,000.00 600.00 14,000.00 700.00        
732-03-A plastic pavement striping (broken line)(4" width) 2.270  MILE 700.00 1,589.00 700.00 1,589.00        
736-09 loop detector 260      LNFT 12.00 3,120.00 15.00 3,900.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00        
S-001 roadway reinforcing mesh (complete road system) 30,234      SQYD 4.00 120,936.00 7.90 238,848.60        
S-002 cleaning and resealing random cracks in asphaltic
concrete pavement
1,000      LNFT 1.50 1,500.00 10.00 10,000.00        
                       
 CONTRACTOR TOTAL       1,437,247.00   1,893,454.60        