| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-F |
removal of concrete combination curb & gutter
|
1,459.0 |
LNFT |
12.00 |
17,508.00 |
16.00 |
23,344.00 |
|
|
|
|
| 202-02-01 |
removal of concrete island
|
44   |
SQYD |
15.00 |
660.00 |
100.00 |
4,400.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
10.00 |
200.00 |
20.00 |
400.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
200   |
LNFT |
4.00 |
800.00 |
20.00 |
4,000.00 |
|
|
|
|
| 305-01 |
subgrade layer (12" thick)
|
30   |
SQYD |
75.00 |
2,250.00 |
150.00 |
4,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
9,811.0 |
TON |
58.00 |
569,038.00 |
64.00 |
627,904.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete binder (level 2)
(variable thickness) |
668.0 |
TON |
80.00 |
53,440.00 |
64.00 |
42,752.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
31,796   |
SQYD |
4.00 |
127,184.00 |
3.50 |
111,286.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
200   |
LNFT |
25.00 |
5,000.00 |
90.00 |
18,000.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
5,031   |
LNFT |
4.00 |
20,124.00 |
30.00 |
150,930.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
4   |
EACH |
2,500.00 |
10,000.00 |
4,700.00 |
18,800.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
4   |
EACH |
2,500.00 |
10,000.00 |
5,900.00 |
23,600.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
2   |
EACH |
200.00 |
400.00 |
2,500.00 |
5,000.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
9   |
EACH |
2,000.00 |
18,000.00 |
800.00 |
7,200.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
20.00 |
1,000.00 |
22.00 |
1,100.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
42.00 |
4,200.00 |
60.00 |
6,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,100.00 |
8,400.00 |
2,400.00 |
9,600.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
53.0 |
SQYD |
50.00 |
2,650.00 |
60.00 |
3,180.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
65.0 |
SQYD |
80.00 |
5,200.00 |
100.00 |
6,500.00 |
|
|
|
|
| 707-01 |
concrete curb
|
120.0 |
LNFT |
26.00 |
3,120.00 |
32.00 |
3,840.00 |
|
|
|
|
| 707-01-B |
concrete curb (pinned barrier vertical extension)
|
5,000.0 |
LNFT |
24.00 |
120,000.00 |
27.00 |
135,000.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
1,459.0 |
LNFT |
32.00 |
46,688.00 |
36.00 |
52,524.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 713-02 |
temporary pavement markings
|
lump |
LUMP |
4,500.00 |
4,500.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
500   |
SQYD |
5.00 |
2,500.00 |
6.00 |
3,000.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
50   |
SQYD |
40.00 |
2,000.00 |
80.00 |
4,000.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
64   |
SQYD |
75.00 |
4,800.00 |
100.00 |
6,400.00 |
|
|
|
|
| 726-01 |
bedding material
|
25.0 |
CUYD |
35.00 |
875.00 |
120.00 |
3,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
140,000.00 |
140,000.00 |
180,000.00 |
180,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
470   |
EACH |
5.50 |
2,585.00 |
6.00 |
2,820.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.630 |
MILE |
2,000.00 |
5,260.00 |
2,300.00 |
6,049.00 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.280 |
MILE |
4,000.00 |
1,120.00 |
4,600.00 |
1,288.00 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.050 |
MILE |
12,000.00 |
600.00 |
14,000.00 |
700.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.270 |
MILE |
700.00 |
1,589.00 |
700.00 |
1,589.00 |
|
|
|
|
| 736-09 |
loop detector
|
260   |
LNFT |
12.00 |
3,120.00 |
15.00 |
3,900.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-001 |
roadway reinforcing mesh (complete road system)
|
30,234   |
SQYD |
4.00 |
120,936.00 |
7.90 |
238,848.60 |
|
|
|
|
| S-002 |
cleaning and resealing random cracks in asphaltic
concrete pavement |
1,000   |
LNFT |
1.50 |
1,500.00 |
10.00 |
10,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,437,247.00 |
|
1,893,454.60 |
|
|
|
|
|