| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
3,500.00 |
3,500.00 |
15,300.00 |
15,300.00 |
20,000.00 |
20,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 105+00; 67.9' long x 20' wide
4-span concrete bridge) |
1   |
EACH |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
7,800.00 |
7,800.00 |
15,000.00 |
15,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
12   |
SQYD |
25.00 |
300.00 |
8.00 |
96.00 |
59.30 |
711.60 |
4.00 |
48.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
906.8 |
SQYD |
10.00 |
9,068.00 |
7.00 |
6,347.60 |
4.60 |
4,171.28 |
7.00 |
6,347.60 |
| 203-05-A |
nonplastic embankment (stone)(adjusted vehicular
measurement) |
392   |
CUYD |
40.00 |
15,680.00 |
54.00 |
21,168.00 |
78.50 |
30,772.00 |
49.00 |
19,208.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
20,000.00 |
20,000.00 |
26,000.00 |
26,000.00 |
11,300.00 |
11,300.00 |
37,000.00 |
37,000.00 |
| 204-02 |
temporary hay or straw bales
|
11   |
EACH |
12.00 |
132.00 |
5.00 |
55.00 |
12.00 |
132.00 |
20.00 |
220.00 |
| 204-03 |
temporary slope drains
|
100   |
LNFT |
7.50 |
750.00 |
4.00 |
400.00 |
12.00 |
1,200.00 |
10.00 |
1,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
180.00 |
720.00 |
150.00 |
600.00 |
180.00 |
720.00 |
185.00 |
740.00 |
| 204-06 |
temporary silt fencing
|
800   |
LNFT |
2.20 |
1,760.00 |
1.00 |
800.00 |
2.20 |
1,760.00 |
2.00 |
1,600.00 |
| 302-01-A |
class ii base course (stone)
|
296.7 |
CUYD |
65.00 |
19,285.50 |
60.00 |
17,802.00 |
43.00 |
12,758.10 |
58.00 |
17,208.60 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
240   |
CUYD |
45.00 |
10,800.00 |
45.00 |
10,800.00 |
69.00 |
16,560.00 |
49.00 |
11,760.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
200.0 |
CUYD |
50.00 |
10,000.00 |
38.00 |
7,600.00 |
62.70 |
12,540.00 |
49.00 |
9,800.00 |
| 502-01 |
superpave asphaltic concrete
|
618.0 |
TON |
79.00 |
48,822.00 |
84.00 |
51,912.00 |
80.00 |
49,440.00 |
84.00 |
51,912.00 |
| 701-05-G |
side drain pipe (18")
|
172   |
LNFT |
40.00 |
6,880.00 |
35.00 |
6,020.00 |
92.50 |
15,910.00 |
25.00 |
4,300.00 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
35.00 |
1,750.00 |
36.50 |
1,825.00 |
35.00 |
1,750.00 |
46.00 |
2,300.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
50.00 |
3,750.00 |
52.00 |
3,900.00 |
45.00 |
3,375.00 |
45.00 |
3,375.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
2,100.00 |
8,400.00 |
2,000.00 |
8,000.00 |
| 706-02-C |
concrete drive (6" thick)
|
58.8 |
SQYD |
40.00 |
2,352.00 |
50.00 |
2,940.00 |
41.00 |
2,410.80 |
43.00 |
2,528.40 |
| 711-03-C |
riprap (30 lb)
|
229.0 |
TON |
40.00 |
9,160.00 |
62.00 |
14,198.00 |
48.50 |
11,106.50 |
83.00 |
19,007.00 |
| 711-03-D |
riprap (55 lb)
|
560.0 |
TON |
42.00 |
23,520.00 |
72.00 |
40,320.00 |
52.50 |
29,400.00 |
88.00 |
49,280.00 |
| 711-04 |
geotextile fabric
|
840   |
SQYD |
2.50 |
2,100.00 |
1.60 |
1,344.00 |
1.60 |
1,344.00 |
3.00 |
2,520.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
16,000.00 |
16,000.00 |
6,500.00 |
6,500.00 |
7,700.00 |
7,700.00 |
36,000.00 |
36,000.00 |
| 724-02 |
pavement widening
|
97.8 |
SQYD |
71.00 |
6,943.80 |
75.00 |
7,335.00 |
75.00 |
7,335.00 |
73.00 |
7,139.40 |
| 726-01 |
bedding material
|
43.0 |
CUYD |
45.00 |
1,935.00 |
48.00 |
2,064.00 |
85.50 |
3,676.50 |
49.00 |
2,107.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
40,000.00 |
40,000.00 |
50,700.00 |
50,700.00 |
50,000.00 |
50,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
60.00 |
240.00 |
75.00 |
300.00 |
70.00 |
280.00 |
85.00 |
340.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
6,000.00 |
6,000.00 |
40,200.00 |
40,200.00 |
| 803-03 |
steel sheet pile wall
|
2,160   |
SQFT |
20.00 |
43,200.00 |
27.00 |
58,320.00 |
26.40 |
57,024.00 |
25.00 |
54,000.00 |
| 804-01-C |
precast concrete piles (16")
|
1,700   |
LNFT |
30.00 |
51,000.00 |
45.00 |
76,500.00 |
46.00 |
78,200.00 |
40.00 |
68,000.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
3,500.00 |
3,500.00 |
250.00 |
250.00 |
11,600.00 |
11,600.00 |
100.00 |
100.00 |
| 805-10 |
bridge superstructure & substructure (28' clear rdwy,
60 degree crossing) |
4   |
SPAN |
31,000.00 |
124,000.00 |
30,000.00 |
120,000.00 |
30,100.00 |
120,400.00 |
18,600.00 |
74,400.00 |
| 813-01 |
concrete approach slabs
|
112.01 |
SQYD |
155.00 |
17,361.55 |
135.00 |
15,121.35 |
130.00 |
14,561.30 |
165.00 |
18,481.65 |
| S-001 |
vibration monitoring
|
lump |
LUMP |
5,000.00 |
5,000.00 |
2,500.00 |
2,500.00 |
2,900.00 |
2,900.00 |
2,500.00 |
2,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
561,009.85 |
|
596,517.95 |
|
599,238.08 |
|
636,422.65 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - COASTAL BRIDGE CO., L.L.C. |
- 6 - LOW LAND CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
45,000.00 |
45,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 105+00; 67.9' long x 20' wide
4-span concrete bridge) |
1   |
EACH |
14,000.00 |
14,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
12   |
SQYD |
25.00 |
300.00 |
165.00 |
1,980.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
906.8 |
SQYD |
8.00 |
7,254.40 |
11.50 |
10,428.20 |
|
|
|
|
| 203-05-A |
nonplastic embankment (stone)(adjusted vehicular
measurement) |
392   |
CUYD |
60.00 |
23,520.00 |
60.00 |
23,520.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
15,000.00 |
15,000.00 |
5,500.00 |
5,500.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
11   |
EACH |
14.00 |
154.00 |
21.50 |
236.50 |
|
|
|
|
| 204-03 |
temporary slope drains
|
100   |
LNFT |
10.00 |
1,000.00 |
19.80 |
1,980.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
200.00 |
800.00 |
298.00 |
1,192.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
800   |
LNFT |
2.50 |
2,000.00 |
3.34 |
2,672.00 |
|
|
|
|
| 302-01-A |
class ii base course (stone)
|
296.7 |
CUYD |
70.00 |
20,769.00 |
58.00 |
17,208.60 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
240   |
CUYD |
60.00 |
14,400.00 |
58.00 |
13,920.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
200.0 |
CUYD |
35.00 |
7,000.00 |
45.00 |
9,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
618.0 |
TON |
80.00 |
49,440.00 |
123.75 |
76,477.50 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
172   |
LNFT |
50.00 |
8,600.00 |
48.00 |
8,256.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
40.00 |
2,000.00 |
50.00 |
2,500.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
45.00 |
3,375.00 |
62.50 |
4,687.50 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
2,812.50 |
11,250.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
58.8 |
SQYD |
41.00 |
2,410.80 |
50.00 |
2,940.00 |
|
|
|
|
| 711-03-C |
riprap (30 lb)
|
229.0 |
TON |
45.00 |
10,305.00 |
50.00 |
11,450.00 |
|
|
|
|
| 711-03-D |
riprap (55 lb)
|
560.0 |
TON |
55.00 |
30,800.00 |
50.00 |
28,000.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
840   |
SQYD |
2.00 |
1,680.00 |
2.00 |
1,680.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
19,000.00 |
19,000.00 |
15,075.00 |
15,075.00 |
|
|
|
|
| 724-02 |
pavement widening
|
97.8 |
SQYD |
50.00 |
4,890.00 |
123.75 |
12,102.75 |
|
|
|
|
| 726-01 |
bedding material
|
43.0 |
CUYD |
60.00 |
2,580.00 |
90.50 |
3,891.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
60,000.00 |
60,000.00 |
33,625.00 |
33,625.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
91.00 |
364.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 803-03 |
steel sheet pile wall
|
2,160   |
SQFT |
27.00 |
58,320.00 |
26.00 |
56,160.00 |
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
1,700   |
LNFT |
50.00 |
85,000.00 |
38.00 |
64,600.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
100.00 |
100.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 805-10 |
bridge superstructure & substructure (28' clear rdwy,
60 degree crossing) |
4   |
SPAN |
25,000.00 |
100,000.00 |
41,975.00 |
167,900.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
112.01 |
SQYD |
165.00 |
18,481.65 |
250.00 |
28,002.50 |
|
|
|
|
| S-001 |
vibration monitoring
|
lump |
LUMP |
5,000.00 |
5,000.00 |
1,777.50 |
1,777.50 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
636,499.85 |
|
654,876.55 |
|
|
|
|
|