Letting of 6/08/2005 LA DOTD Headquarters


READV
go back
Go Back
DBE GOAL FED
Lead Project: 713-56-0048
Parish: TERREBONNE
Routes:
Description: HOLLYWOOD DRAINAGE CANAL BRIDGE
Type Const: clearing and grubbing, class ii base course, superpave asphaltic concrete pavement,
pavement patching, concrete slab span bridge replacement and related work.
 
RankLicenseBidderAmount
134567 JAMES CONSTRUCTION GROUP LLC $561,009.85
236827 SHAVERS-WHITTLE CONSTRUCTION INC $596,517.95
340312 GRAY CONSTRUCTION CORP. $599,238.08
400060 F. MILLER & SONS, LLC $636,422.65
500481 COASTAL BRIDGE CO., L.L.C. $636,499.85
606156 LOW LAND CONSTRUCTION CO., INC. $654,876.55
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
SHAVERS-WHITTLE CONSTRUCTION INC
- 3 -
GRAY CONSTRUCTION CORP.
- 4 -
F. MILLER & SONS, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 10,000.00 10,000.00 3,500.00 3,500.00 15,300.00 15,300.00 20,000.00 20,000.00
202-02-A-01 removal of bridge (sta. 105+00; 67.9' long x 20' wide
4-span concrete bridge)
1      EACH 25,000.00 25,000.00 25,000.00 25,000.00 7,800.00 7,800.00 15,000.00 15,000.00
202-02-D removal of concrete walks & drives 12      SQYD 25.00 300.00 8.00 96.00 59.30 711.60 4.00 48.00
202-02-G removal of surfacing & stabilized base 906.8    SQYD 10.00 9,068.00 7.00 6,347.60 4.60 4,171.28 7.00 6,347.60
203-05-A nonplastic embankment (stone)(adjusted vehicular
measurement)
392      CUYD 40.00 15,680.00 54.00 21,168.00 78.50 30,772.00 49.00 19,208.00
203-06 excavation & embankment lump      LUMP 20,000.00 20,000.00 26,000.00 26,000.00 11,300.00 11,300.00 37,000.00 37,000.00
204-02 temporary hay or straw bales 11      EACH 12.00 132.00 5.00 55.00 12.00 132.00 20.00 220.00
204-03 temporary slope drains 100      LNFT 7.50 750.00 4.00 400.00 12.00 1,200.00 10.00 1,000.00
204-05-A temporary sediment check dams (hay) 4      EACH 180.00 720.00 150.00 600.00 180.00 720.00 185.00 740.00
204-06 temporary silt fencing 800      LNFT 2.20 1,760.00 1.00 800.00 2.20 1,760.00 2.00 1,600.00
302-01-A class ii base course (stone) 296.7    CUYD 65.00 19,285.50 60.00 17,802.00 43.00 12,758.10 58.00 17,208.60
401-02 aggregate surface course (adjusted vehicular
measurement)
240      CUYD 45.00 10,800.00 45.00 10,800.00 69.00 16,560.00 49.00 11,760.00
402-01 traffic maintenance aggregate (vehicular measurement) 200.0    CUYD 50.00 10,000.00 38.00 7,600.00 62.70 12,540.00 49.00 9,800.00
502-01 superpave asphaltic concrete 618.0    TON 79.00 48,822.00 84.00 51,912.00 80.00 49,440.00 84.00 51,912.00
701-05-G side drain pipe (18") 172      LNFT 40.00 6,880.00 35.00 6,020.00 92.50 15,910.00 25.00 4,300.00
704-07-A guard rail bridge attachments (single thrie beam) 50.0    LNFT 35.00 1,750.00 36.50 1,825.00 35.00 1,750.00 46.00 2,300.00
704-08-B guard rail transitions (double thrie beam) 75.0    LNFT 50.00 3,750.00 52.00 3,900.00 45.00 3,375.00 45.00 3,375.00
704-11-A guard rail end treatment (flared) 4      EACH 2,500.00 10,000.00 2,500.00 10,000.00 2,100.00 8,400.00 2,000.00 8,000.00
706-02-C concrete drive (6" thick) 58.8    SQYD 40.00 2,352.00 50.00 2,940.00 41.00 2,410.80 43.00 2,528.40
711-03-C riprap (30 lb) 229.0    TON 40.00 9,160.00 62.00 14,198.00 48.50 11,106.50 83.00 19,007.00
711-03-D riprap (55 lb) 560.0    TON 42.00 23,520.00 72.00 40,320.00 52.50 29,400.00 88.00 49,280.00
711-04 geotextile fabric 840      SQYD 2.50 2,100.00 1.60 1,344.00 1.60 1,344.00 3.00 2,520.00
713-01 temporary signs & barricades lump      LUMP 16,000.00 16,000.00 6,500.00 6,500.00 7,700.00 7,700.00 36,000.00 36,000.00
724-02 pavement widening 97.8    SQYD 71.00 6,943.80 75.00 7,335.00 75.00 7,335.00 73.00 7,139.40
726-01 bedding material 43.0    CUYD 45.00 1,935.00 48.00 2,064.00 85.50 3,676.50 49.00 2,107.00
727-01 mobilization lump      LUMP 50,000.00 50,000.00 40,000.00 40,000.00 50,700.00 50,700.00 50,000.00 50,000.00
729-16-C object marker assembly (type 3) 4      EACH 60.00 240.00 75.00 300.00 70.00 280.00 85.00 340.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 6,000.00 6,000.00 40,200.00 40,200.00
803-03 steel sheet pile wall 2,160      SQFT 20.00 43,200.00 27.00 58,320.00 26.40 57,024.00 25.00 54,000.00
804-01-C precast concrete piles (16") 1,700      LNFT 30.00 51,000.00 45.00 76,500.00 46.00 78,200.00 40.00 68,000.00
804-12 loading permanent piles 1      EACH 3,500.00 3,500.00 250.00 250.00 11,600.00 11,600.00 100.00 100.00
805-10 bridge superstructure & substructure (28' clear rdwy,
60 degree crossing)
4      SPAN 31,000.00 124,000.00 30,000.00 120,000.00 30,100.00 120,400.00 18,600.00 74,400.00
813-01 concrete approach slabs 112.01   SQYD 155.00 17,361.55 135.00 15,121.35 130.00 14,561.30 165.00 18,481.65
S-001 vibration monitoring lump      LUMP 5,000.00 5,000.00 2,500.00 2,500.00 2,900.00 2,900.00 2,500.00 2,500.00
                       
 CONTRACTOR TOTAL       561,009.85   596,517.95   599,238.08   636,422.65
 
Item Number Item Description Quantity Unit of Measure - 5 -
COASTAL BRIDGE CO., L.L.C.
- 6 -
LOW LAND CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 45,000.00 45,000.00 2,500.00 2,500.00        
202-02-A-01 removal of bridge (sta. 105+00; 67.9' long x 20' wide
4-span concrete bridge)
1      EACH 14,000.00 14,000.00 15,000.00 15,000.00        
202-02-D removal of concrete walks & drives 12      SQYD 25.00 300.00 165.00 1,980.00        
202-02-G removal of surfacing & stabilized base 906.8    SQYD 8.00 7,254.40 11.50 10,428.20        
203-05-A nonplastic embankment (stone)(adjusted vehicular
measurement)
392      CUYD 60.00 23,520.00 60.00 23,520.00        
203-06 excavation & embankment lump      LUMP 15,000.00 15,000.00 5,500.00 5,500.00        
204-02 temporary hay or straw bales 11      EACH 14.00 154.00 21.50 236.50        
204-03 temporary slope drains 100      LNFT 10.00 1,000.00 19.80 1,980.00        
204-05-A temporary sediment check dams (hay) 4      EACH 200.00 800.00 298.00 1,192.00        
204-06 temporary silt fencing 800      LNFT 2.50 2,000.00 3.34 2,672.00        
302-01-A class ii base course (stone) 296.7    CUYD 70.00 20,769.00 58.00 17,208.60        
401-02 aggregate surface course (adjusted vehicular
measurement)
240      CUYD 60.00 14,400.00 58.00 13,920.00        
402-01 traffic maintenance aggregate (vehicular measurement) 200.0    CUYD 35.00 7,000.00 45.00 9,000.00        
502-01 superpave asphaltic concrete 618.0    TON 80.00 49,440.00 123.75 76,477.50        
701-05-G side drain pipe (18") 172      LNFT 50.00 8,600.00 48.00 8,256.00        
704-07-A guard rail bridge attachments (single thrie beam) 50.0    LNFT 40.00 2,000.00 50.00 2,500.00        
704-08-B guard rail transitions (double thrie beam) 75.0    LNFT 45.00 3,375.00 62.50 4,687.50        
704-11-A guard rail end treatment (flared) 4      EACH 2,000.00 8,000.00 2,812.50 11,250.00        
706-02-C concrete drive (6" thick) 58.8    SQYD 41.00 2,410.80 50.00 2,940.00        
711-03-C riprap (30 lb) 229.0    TON 45.00 10,305.00 50.00 11,450.00        
711-03-D riprap (55 lb) 560.0    TON 55.00 30,800.00 50.00 28,000.00        
711-04 geotextile fabric 840      SQYD 2.00 1,680.00 2.00 1,680.00        
713-01 temporary signs & barricades lump      LUMP 19,000.00 19,000.00 15,075.00 15,075.00        
724-02 pavement widening 97.8    SQYD 50.00 4,890.00 123.75 12,102.75        
726-01 bedding material 43.0    CUYD 60.00 2,580.00 90.50 3,891.50        
727-01 mobilization lump      LUMP 60,000.00 60,000.00 33,625.00 33,625.00        
729-16-C object marker assembly (type 3) 4      EACH 80.00 320.00 91.00 364.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 4,000.00 4,000.00        
803-03 steel sheet pile wall 2,160      SQFT 27.00 58,320.00 26.00 56,160.00        
804-01-C precast concrete piles (16") 1,700      LNFT 50.00 85,000.00 38.00 64,600.00        
804-12 loading permanent piles 1      EACH 100.00 100.00 15,000.00 15,000.00        
805-10 bridge superstructure & substructure (28' clear rdwy,
60 degree crossing)
4      SPAN 25,000.00 100,000.00 41,975.00 167,900.00        
813-01 concrete approach slabs 112.01   SQYD 165.00 18,481.65 250.00 28,002.50        
S-001 vibration monitoring lump      LUMP 5,000.00 5,000.00 1,777.50 1,777.50        
                       
 CONTRACTOR TOTAL       636,499.85   654,876.55        