| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
884   |
LNFT |
3.36 |
2,970.24 |
5.00 |
4,420.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
676   |
CUYD |
11.20 |
7,571.20 |
17.00 |
11,492.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
671   |
CUYD |
13.44 |
9,018.24 |
15.00 |
10,065.00 |
|
|
|
|
| 304-01 |
lime
|
16.80 |
TON |
139.47 |
2,343.09 |
120.00 |
2,016.00 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,066   |
SQYD |
13.41 |
14,295.06 |
4.00 |
4,264.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,373.2 |
TON |
48.42 |
114,910.34 |
56.00 |
132,899.20 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
134.1 |
TON |
136.18 |
18,261.73 |
56.00 |
7,509.60 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
4,562   |
SQYD |
1.99 |
9,078.38 |
2.00 |
9,124.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
444.0 |
LNFT |
28.00 |
12,432.00 |
27.00 |
11,988.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
425.0 |
LNFT |
17.92 |
7,616.00 |
17.00 |
7,225.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
33.60 |
1,680.00 |
33.00 |
1,650.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
42.00 |
8,400.00 |
40.00 |
8,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
1,792.03 |
14,336.24 |
1,700.00 |
13,600.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,700.00 |
6,700.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.633 |
MILE |
156.00 |
410.74 |
140.00 |
368.62 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.648 |
MILE |
247.00 |
160.05 |
20.00 |
12.96 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
6.376 |
MILE |
493.00 |
3,143.36 |
30.00 |
191.28 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
21,545.00 |
21,545.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
72.80 |
582.40 |
70.00 |
560.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
118   |
EACH |
5.82 |
686.76 |
7.00 |
826.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.188 |
MILE |
2,230.00 |
7,109.24 |
2,100.00 |
6,694.80 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.324 |
MILE |
730.00 |
236.52 |
750.00 |
243.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.03 |
ACRE |
1,680.00 |
1,730.40 |
2,000.00 |
2,060.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,920.00 |
3,920.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| S-001 |
cement treated base course (12 in depth)
|
11,295   |
SQYD |
7.17 |
80,985.15 |
6.30 |
71,158.50 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
350,122.14 |
|
354,367.96 |
|
|
|
|
|