Letting of 6/08/2005 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 452-90-0132
Parish: TANGIPAHOA
Routes: I-55
Description: GENESSEE ROAD OVERPASS & FIRE TOWER ROAD OVERPASS (CM)
Type Const: cement treated base c08rse, superpave asphaltic concrete, temp pavement markings,
refl raised pavement markers, plasti c pavement striping, guardrail and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $350,122.14
206276 BARRIERE CONSTRUCTION CO., LLC. $354,367.96
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 884      LNFT 3.36 2,970.24 5.00 4,420.00        
203-08 borrow (vehicular measurement) 676      CUYD 11.20 7,571.20 17.00 11,492.00        
203-08-A borrow (vehicular meas.)(selected soils) 671      CUYD 13.44 9,018.24 15.00 10,065.00        
304-01 lime 16.80   TON 139.47 2,343.09 120.00 2,016.00        
304-04-D lime treatment (type d) (12" thick) 1,066      SQYD 13.41 14,295.06 4.00 4,264.00        
502-01 superpave asphaltic concrete 2,373.2    TON 48.42 114,910.34 56.00 132,899.20        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
134.1    TON 136.18 18,261.73 56.00 7,509.60        
509-01 cold planing asphaltic pavement 4,562      SQYD 1.99 9,078.38 2.00 9,124.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 444.0    LNFT 28.00 12,432.00 27.00 11,988.00        
704-03 blocked out guard rail 425.0    LNFT 17.92 7,616.00 17.00 7,225.00        
704-07-A guard rail bridge attachments (single thrie beam) 50.0    LNFT 33.60 1,680.00 33.00 1,650.00        
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 42.00 8,400.00 40.00 8,000.00        
704-11-A guard rail end treatment (flared) 8      EACH 1,792.03 14,336.24 1,700.00 13,600.00        
713-01 temporary signs & barricades lump      LUMP 6,700.00 6,700.00 10,000.00 10,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
2.633  MILE 156.00 410.74 140.00 368.62        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.648  MILE 247.00 160.05 20.00 12.96        
713-05-A temporary pavement markings (solid line)(4" width) 6.376  MILE 493.00 3,143.36 30.00 191.28        
727-01 mobilization lump      LUMP 21,545.00 21,545.00 35,000.00 35,000.00        
729-16-C object marker assembly (type 3) 8      EACH 72.80 582.40 70.00 560.00        
731-02 reflectorized raised pavement markers 118      EACH 5.82 686.76 7.00 826.00        
732-02-A plastic pavement striping (solid line) (4" width) 3.188  MILE 2,230.00 7,109.24 2,100.00 6,694.80        
732-03-A plastic pavement striping (broken line)(4" width) 0.324  MILE 730.00 236.52 750.00 243.00        
739-01 hydro-seeding 1.03   ACRE 1,680.00 1,730.40 2,000.00 2,060.00        
740-01 construction layout lump      LUMP 3,920.00 3,920.00 3,000.00 3,000.00        
S-001 cement treated base course (12 in depth) 11,295      SQYD 7.17 80,985.15 6.30 71,158.50        
                       
 CONTRACTOR TOTAL       350,122.14   354,367.96        