| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BYRON E. TALBOT CONTRACTOR, INC. |
- 2 - CYCLE CONSTRUCTION CO. L.L.C. |
- 3 - BARRIERE CONSTRUCTION CO., LLC. |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
5,300.00 |
5,300.00 |
2,000.00 |
2,000.00 |
4,800.00 |
4,800.00 |
5,000.00 |
5,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
2,750.00 |
2,750.00 |
2,000.00 |
2,000.00 |
| 202-02-C-01 |
removal of incidental concrete pavement
|
472   |
SQYD |
5.50 |
2,596.00 |
5.00 |
2,360.00 |
6.00 |
2,832.00 |
10.00 |
4,720.00 |
| 202-02-D |
removal of concrete walks & drives
|
580   |
SQYD |
6.00 |
3,480.00 |
5.00 |
2,900.00 |
15.00 |
8,700.00 |
10.00 |
5,800.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
275.0 |
LNFT |
5.00 |
1,375.00 |
2.00 |
550.00 |
4.25 |
1,168.75 |
7.00 |
1,925.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,639.0 |
SQYD |
6.00 |
9,834.00 |
7.00 |
11,473.00 |
8.00 |
13,112.00 |
6.00 |
9,834.00 |
| 202-02-H |
removal of guard rail
|
38   |
LNFT |
12.00 |
456.00 |
11.00 |
418.00 |
12.00 |
456.00 |
10.00 |
380.00 |
| 202-03-A |
relocation of existing signal head
|
1   |
EACH |
420.00 |
420.00 |
400.00 |
400.00 |
500.00 |
500.00 |
400.00 |
400.00 |
| 202-03-B |
relocation of existing signs
|
3   |
EACH |
550.00 |
1,650.00 |
100.00 |
300.00 |
88.00 |
264.00 |
80.00 |
240.00 |
| 202-03-C |
relocation of existing signs mounted on breakaway post
|
1   |
EACH |
5,000.00 |
5,000.00 |
1,300.00 |
1,300.00 |
1,400.00 |
1,400.00 |
1,300.00 |
1,300.00 |
| 203-03 |
muck excavation
|
230   |
CUYD |
8.00 |
1,840.00 |
7.00 |
1,610.00 |
21.00 |
4,830.00 |
15.00 |
3,450.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
25,848.00 |
25,848.00 |
21,000.00 |
21,000.00 |
20,000.00 |
20,000.00 |
40,000.00 |
40,000.00 |
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
8.00 |
240.00 |
18.00 |
540.00 |
12.00 |
360.00 |
9.00 |
270.00 |
| 204-06 |
temporary silt fencing
|
200   |
LNFT |
4.00 |
800.00 |
3.00 |
600.00 |
5.00 |
1,000.00 |
3.00 |
600.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
200.0 |
CUYD |
36.00 |
7,200.00 |
48.00 |
9,600.00 |
40.00 |
8,000.00 |
25.00 |
5,000.00 |
| 502-01 |
superpave asphaltic concrete
|
3,444.3 |
TON |
74.00 |
254,878.20 |
67.00 |
230,768.10 |
71.00 |
244,545.30 |
60.00 |
206,658.00 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
84   |
LNFT |
21.00 |
1,764.00 |
47.00 |
3,948.00 |
50.00 |
4,200.00 |
45.00 |
3,780.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
108   |
LNFT |
22.15 |
2,392.20 |
49.00 |
5,292.00 |
60.00 |
6,480.00 |
50.00 |
5,400.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
373   |
LNFT |
33.70 |
12,570.10 |
60.00 |
22,380.00 |
61.00 |
22,753.00 |
60.00 |
22,380.00 |
| 702-03-A |
catch basins (cb-01)
|
7   |
EACH |
2,000.00 |
14,000.00 |
2,100.00 |
14,700.00 |
2,500.00 |
17,500.00 |
2,600.00 |
18,200.00 |
| 702-04-A |
adjusting manholes
|
3   |
EACH |
200.00 |
600.00 |
1,100.00 |
3,300.00 |
400.00 |
1,200.00 |
500.00 |
1,500.00 |
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
3,100.00 |
3,100.00 |
2,800.00 |
2,800.00 |
3,000.00 |
3,000.00 |
2,600.00 |
2,600.00 |
| 705-01 |
barbed wire fence
|
256   |
LNFT |
11.00 |
2,816.00 |
11.25 |
2,880.00 |
12.00 |
3,072.00 |
10.00 |
2,560.00 |
| 706-02-D |
concrete drive (8" thick)
|
253.6 |
SQYD |
60.00 |
15,216.00 |
46.00 |
11,665.60 |
82.00 |
20,795.20 |
65.00 |
16,484.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
245.0 |
SQYD |
39.00 |
9,555.00 |
25.00 |
6,125.00 |
49.00 |
12,005.00 |
38.00 |
9,310.00 |
| 707-01 |
concrete curb
|
40.0 |
LNFT |
8.00 |
320.00 |
30.00 |
1,200.00 |
14.00 |
560.00 |
32.00 |
1,280.00 |
| 707-03 |
combination concrete curb & gutter
|
345.0 |
LNFT |
22.00 |
7,590.00 |
18.00 |
6,210.00 |
31.00 |
10,695.00 |
38.00 |
13,110.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
22,500.00 |
22,500.00 |
22,000.00 |
22,000.00 |
25,000.00 |
25,000.00 |
65,000.00 |
65,000.00 |
| 713-03-A |
temporary pavement markings (4" width)
|
682   |
LNFT |
1.10 |
750.20 |
1.00 |
682.00 |
1.20 |
818.40 |
1.00 |
682.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.440 |
MILE |
2,170.00 |
954.80 |
2,200.00 |
968.00 |
2,300.00 |
1,012.00 |
2,000.00 |
880.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
150   |
SQYD |
95.00 |
14,250.00 |
90.00 |
13,500.00 |
78.00 |
11,700.00 |
70.00 |
10,500.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
32,500.00 |
32,500.00 |
78,000.00 |
78,000.00 |
43,000.00 |
43,000.00 |
50,000.00 |
50,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
38   |
EACH |
5.50 |
209.00 |
6.00 |
228.00 |
5.80 |
220.40 |
5.00 |
190.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
213   |
LNFT |
10.00 |
2,130.00 |
1.00 |
213.00 |
1.00 |
213.00 |
1.00 |
213.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
122   |
LNFT |
3.30 |
402.60 |
3.00 |
366.00 |
3.50 |
427.00 |
3.00 |
366.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.723 |
MILE |
2,080.00 |
1,503.84 |
2,100.00 |
1,518.30 |
2,200.00 |
1,590.60 |
2,000.00 |
1,446.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.270 |
MILE |
1,000.00 |
270.00 |
1,000.00 |
270.00 |
1,000.00 |
270.00 |
1,000.00 |
270.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
140.00 |
420.00 |
140.00 |
420.00 |
150.00 |
450.00 |
135.00 |
405.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
145.00 |
435.00 |
150.00 |
450.00 |
160.00 |
480.00 |
150.00 |
450.00 |
| 736-03 |
jacked or bored conduit
|
200   |
LNFT |
16.50 |
3,300.00 |
17.00 |
3,400.00 |
17.50 |
3,500.00 |
16.00 |
3,200.00 |
| 736-09 |
loop detector
|
150   |
LNFT |
12.00 |
1,800.00 |
12.00 |
1,800.00 |
12.80 |
1,920.00 |
12.00 |
1,800.00 |
| 736-11 |
conduit
|
1,000   |
LNFT |
4.00 |
4,000.00 |
4.00 |
4,000.00 |
4.20 |
4,200.00 |
4.00 |
4,000.00 |
| 736-12 |
conductor, interconnect cable (1-7 c, #12 awg stranded)
|
2,500   |
LNFT |
1.30 |
3,250.00 |
1.35 |
3,375.00 |
1.40 |
3,500.00 |
1.30 |
3,250.00 |
| 739-01 |
hydro-seeding
|
0.87 |
ACRE |
2,300.00 |
2,001.00 |
2,000.00 |
1,740.00 |
2,100.00 |
1,827.00 |
2,000.00 |
1,740.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
4,500.00 |
4,500.00 |
6,000.00 |
6,000.00 |
7,100.00 |
7,100.00 |
5,000.00 |
5,000.00 |
| S-001 |
dynamic message sign unit
|
3   |
EACH |
4,700.00 |
14,100.00 |
2,500.00 |
7,500.00 |
2,300.00 |
6,900.00 |
4,000.00 |
12,000.00 |
| S-002 |
saw cutting asphalt and/or concrete pavement (full
depth) |
19,318   |
INFT |
0.75 |
14,488.50 |
1.12 |
21,636.16 |
0.80 |
15,454.40 |
0.75 |
14,488.50 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
515,605.44 |
|
534,886.16 |
|
546,561.05 |
|
560,061.50 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - RICHARD PRICE CONTRACTING CO, LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
11,000.00 |
11,000.00 |
|
|
|
|
|
|
| 202-02-C-01 |
removal of incidental concrete pavement
|
472   |
SQYD |
16.00 |
7,552.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
580   |
SQYD |
13.00 |
7,540.00 |
|
|
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
275.0 |
LNFT |
12.00 |
3,300.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,639.0 |
SQYD |
10.35 |
16,963.65 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
38   |
LNFT |
11.00 |
418.00 |
|
|
|
|
|
|
| 202-03-A |
relocation of existing signal head
|
1   |
EACH |
424.00 |
424.00 |
|
|
|
|
|
|
| 202-03-B |
relocation of existing signs
|
3   |
EACH |
85.00 |
255.00 |
|
|
|
|
|
|
| 202-03-C |
relocation of existing signs mounted on breakaway post
|
1   |
EACH |
1,400.00 |
1,400.00 |
|
|
|
|
|
|
| 203-03 |
muck excavation
|
230   |
CUYD |
14.00 |
3,220.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
20.00 |
600.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
200   |
LNFT |
5.00 |
1,000.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
200.0 |
CUYD |
40.00 |
8,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,444.3 |
TON |
81.00 |
278,988.30 |
|
|
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
84   |
LNFT |
36.00 |
3,024.00 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
108   |
LNFT |
40.00 |
4,320.00 |
|
|
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
373   |
LNFT |
51.00 |
19,023.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
7   |
EACH |
2,080.00 |
14,560.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
3   |
EACH |
800.00 |
2,400.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
2,800.00 |
2,800.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
256   |
LNFT |
39.00 |
9,984.00 |
|
|
|
|
|
|
| 706-02-D |
concrete drive (8" thick)
|
253.6 |
SQYD |
55.00 |
13,948.00 |
|
|
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
245.0 |
SQYD |
38.00 |
9,310.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
40.0 |
LNFT |
38.00 |
1,520.00 |
|
|
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
345.0 |
LNFT |
23.00 |
7,935.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
682   |
LNFT |
1.10 |
750.20 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.440 |
MILE |
2,172.50 |
955.90 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
150   |
SQYD |
86.00 |
12,900.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
45,000.00 |
45,000.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
38   |
EACH |
6.00 |
228.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
213   |
LNFT |
1.00 |
213.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
122   |
LNFT |
3.25 |
396.50 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.723 |
MILE |
2,090.00 |
1,511.07 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.270 |
MILE |
990.00 |
267.30 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
138.00 |
414.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
149.00 |
447.00 |
|
|
|
|
|
|
| 736-03 |
jacked or bored conduit
|
200   |
LNFT |
16.50 |
3,300.00 |
|
|
|
|
|
|
| 736-09 |
loop detector
|
150   |
LNFT |
12.00 |
1,800.00 |
|
|
|
|
|
|
| 736-11 |
conduit
|
1,000   |
LNFT |
4.00 |
4,000.00 |
|
|
|
|
|
|
| 736-12 |
conductor, interconnect cable (1-7 c, #12 awg stranded)
|
2,500   |
LNFT |
1.35 |
3,375.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
0.87 |
ACRE |
2,000.00 |
1,740.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| S-001 |
dynamic message sign unit
|
3   |
EACH |
4,100.00 |
12,300.00 |
|
|
|
|
|
|
| S-002 |
saw cutting asphalt and/or concrete pavement (full
depth) |
19,318   |
INFT |
0.75 |
14,488.50 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
620,571.42 |
|
|
|
|
|
|
|