| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,300.00 |
10,300.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
422   |
LNFT |
4.00 |
1,688.00 |
11.00 |
4,642.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,308   |
CUYD |
45.00 |
58,860.00 |
20.00 |
26,160.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
15,235.4 |
TON |
49.00 |
746,534.60 |
54.50 |
830,329.30 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
1,012.7 |
TON |
85.00 |
86,079.50 |
85.00 |
86,079.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
101,464   |
SQYD |
1.50 |
152,196.00 |
2.00 |
202,928.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 4,155   |
CUYD |
0.10 |
- 415.50 |
0.01 |
- 41.55 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
3,395   |
LNFT |
1.25 |
4,243.75 |
1.10 |
3,734.50 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
4,234   |
LNFT |
1.40 |
5,927.60 |
1.25 |
5,292.50 |
|
|
|
|
| 602-05-I-01 |
full depth patching of jointed concrete pavement (9"
thick) (16.0 square yards and under) |
44.0 |
SQYD |
173.00 |
7,612.00 |
150.00 |
6,600.00 |
|
|
|
|
| 602-05-I-02 |
full depth patching of jointed concrete pavement (9"
thick) (16.1 square yards to 48.0 square yards) |
288.1 |
SQYD |
155.00 |
44,655.50 |
135.00 |
38,893.50 |
|
|
|
|
| 602-05-I-03 |
full depth patching of jointed concrete pavement (9"
thick) (48.1 square yards and over) |
141.3 |
SQYD |
138.00 |
19,499.40 |
120.00 |
16,956.00 |
|
|
|
|
| 602-10 |
longitudinal shoulder joints
|
6,790   |
LNFT |
1.15 |
7,808.50 |
1.00 |
6,790.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
65   |
EACH |
1,350.00 |
87,750.00 |
1,200.00 |
78,000.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
359.4 |
LNFT |
49.00 |
17,610.60 |
54.00 |
19,407.60 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
56.3 |
LNFT |
21.00 |
1,182.30 |
20.00 |
1,126.00 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
12.6 |
LNFT |
96.00 |
1,209.60 |
70.00 |
882.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,300.00 |
4,600.00 |
2,500.00 |
5,000.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
500.0 |
LNFT |
40.00 |
20,000.00 |
30.00 |
15,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
2,490   |
LNFT |
0.34 |
846.60 |
1.10 |
2,739.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
20.305 |
MILE |
200.00 |
4,061.00 |
215.00 |
4,365.57 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.041 |
MILE |
300.00 |
2,412.30 |
155.00 |
1,246.35 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
30.245 |
MILE |
600.00 |
18,147.00 |
495.00 |
14,971.27 |
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
230.00 |
1,380.00 |
105.00 |
630.00 |
|
|
|
|
| 713-06-E |
temporary pavement legends and symbols (school
crossing) |
6   |
EACH |
230.00 |
1,380.00 |
105.00 |
630.00 |
|
|
|
|
| 724-01-C |
pavement patching (18" minimum thickness)
|
2,500   |
SQYD |
82.50 |
206,250.00 |
97.00 |
242,500.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
1,000.0 |
TON |
90.00 |
90,000.00 |
76.00 |
76,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
130,000.00 |
130,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
92.00 |
184.00 |
65.00 |
130.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,662   |
EACH |
5.45 |
14,507.90 |
4.50 |
11,979.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,236   |
LNFT |
0.92 |
1,137.12 |
1.65 |
2,039.40 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
830   |
LNFT |
1.38 |
1,145.40 |
4.00 |
3,320.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.108 |
MILE |
2,068.00 |
18,835.34 |
3,000.00 |
27,324.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.510 |
MILE |
750.00 |
1,132.50 |
1,450.00 |
2,189.50 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
460.00 |
920.00 |
600.00 |
1,200.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
574.00 |
1,148.00 |
600.00 |
1,200.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.684 |
MILE |
5,700.00 |
3,898.80 |
7,000.00 |
4,788.00 |
|
|
|
|
| 735-01 |
mailboxes
|
59   |
EACH |
13.00 |
767.00 |
5.00 |
295.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
47   |
EACH |
125.00 |
5,875.00 |
125.00 |
5,875.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
320.00 |
640.00 |
175.00 |
350.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
26   |
EACH |
825.00 |
21,450.00 |
500.00 |
13,000.00 |
|
|
|
|
| S-002 |
stone or recycled concrete (6" thickness)
|
78.9 |
CUYD |
98.00 |
7,732.20 |
85.00 |
6,706.50 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,891,192.01 |
|
1,911,257.94 |
|
|
|
|
|