| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 4 - COASTAL BRIDGE CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
59   |
SQYD |
100.00 |
5,900.00 |
25.00 |
1,475.00 |
12.00 |
708.00 |
15.00 |
885.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
972.1 |
SQYD |
5.00 |
4,860.50 |
4.00 |
3,888.40 |
10.00 |
9,721.00 |
15.00 |
14,581.50 |
| 202-02-H |
removal of guard rail
|
307   |
LNFT |
3.00 |
921.00 |
6.00 |
1,842.00 |
3.00 |
921.00 |
3.00 |
921.00 |
| 202-02-I |
removal of grassed area
|
lump |
LUMP |
10,000.00 |
10,000.00 |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
3,500.00 |
3,500.00 |
| 203-08 |
borrow (vehicular measurement)
|
3,077   |
CUYD |
4.00 |
12,308.00 |
15.00 |
46,155.00 |
7.00 |
21,539.00 |
12.00 |
36,924.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
5,635   |
CUYD |
4.00 |
22,540.00 |
10.00 |
56,350.00 |
8.00 |
45,080.00 |
5.00 |
28,175.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
20   |
EACH |
90.00 |
1,800.00 |
150.00 |
3,000.00 |
100.00 |
2,000.00 |
85.00 |
1,700.00 |
| 204-06 |
temporary silt fencing
|
20,254   |
LNFT |
1.20 |
24,304.80 |
1.60 |
32,406.40 |
1.20 |
24,304.80 |
1.50 |
30,381.00 |
| 302-02-D |
class ii base course (crushed stone or recycled pccp)
(12" thick) |
622.0 |
SQYD |
20.00 |
12,440.00 |
25.00 |
15,550.00 |
25.00 |
15,550.00 |
25.00 |
15,550.00 |
| 302-02-E |
class ii base course (crushed stone or recycled pccp)
(4" thick) |
39,494.3 |
SQYD |
6.00 |
236,965.80 |
6.00 |
236,965.80 |
8.00 |
315,954.40 |
9.00 |
355,448.70 |
| 304-01 |
lime
|
25.49 |
TON |
25.00 |
637.25 |
160.00 |
4,078.40 |
115.00 |
2,931.35 |
0.01 |
0.25 |
| 304-03-B |
lime treatment (type c) (8 1/2" thick)
|
952   |
SQYD |
1.00 |
952.00 |
2.50 |
2,380.00 |
1.50 |
1,428.00 |
0.01 |
9.52 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,905   |
SQYD |
1.00 |
1,905.00 |
4.00 |
7,620.00 |
2.00 |
3,810.00 |
0.01 |
19.05 |
| 502-01 |
superpave asphaltic concrete
|
14,070.6 |
TON |
50.00 |
703,530.00 |
45.00 |
633,177.00 |
43.00 |
605,035.80 |
45.00 |
633,177.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
505.2 |
TON |
50.00 |
25,260.00 |
75.00 |
37,890.00 |
45.00 |
22,734.00 |
75.00 |
37,890.00 |
| 509-01-A |
cold planing asphaltic pavement (1 1/2" deep)
|
3,435   |
SQYD |
1.00 |
3,435.00 |
2.00 |
6,870.00 |
2.00 |
6,870.00 |
1.00 |
3,435.00 |
| 509-01-B |
cold planing asphaltic pavement (2" average depth)
|
1,828   |
SQYD |
1.00 |
1,828.00 |
2.25 |
4,113.00 |
2.00 |
3,656.00 |
1.50 |
2,742.00 |
| 509-01-C |
cold planing asphaltic pavement (4" average depth)
|
50,293   |
SQYD |
2.20 |
110,644.60 |
2.50 |
125,732.50 |
3.00 |
150,879.00 |
3.75 |
188,598.75 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,624   |
CUYD |
10.00 |
- 26,240.00 |
FREE |
FREE |
0.01 |
- 26.24 |
1.00 |
- 2,624.00 |
| 701-12-F |
corrugated metal pipe (extension)(15")
|
44   |
LNFT |
55.00 |
2,420.00 |
100.00 |
4,400.00 |
120.00 |
5,280.00 |
75.00 |
3,300.00 |
| 701-15 |
concrete collar
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
FREE |
FREE |
1,500.00 |
1,500.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
315.6 |
LNFT |
44.00 |
13,886.40 |
55.00 |
17,358.00 |
40.00 |
12,624.00 |
40.00 |
12,624.00 |
| 704-03 |
blocked out guard rail
|
125.1 |
LNFT |
19.00 |
2,376.90 |
26.00 |
3,252.60 |
20.00 |
2,502.00 |
17.00 |
2,126.70 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,100.00 |
4,200.00 |
2,400.00 |
4,800.00 |
2,000.00 |
4,000.00 |
1,950.00 |
3,900.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
48,000.00 |
48,000.00 |
50,000.00 |
50,000.00 |
73,000.00 |
73,000.00 |
15,000.00 |
15,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
1,530   |
LNFT |
0.35 |
535.50 |
0.50 |
765.00 |
0.20 |
306.00 |
0.41 |
627.30 |
| 713-03-E |
temporary pavement markings (24" width)
|
213   |
LNFT |
1.00 |
213.00 |
1.50 |
319.50 |
0.70 |
149.10 |
1.23 |
261.99 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.900 |
MILE |
50.00 |
595.00 |
650.00 |
7,735.00 |
500.00 |
5,950.00 |
300.00 |
3,570.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
11.508 |
MILE |
100.00 |
1,150.80 |
260.00 |
2,992.08 |
100.00 |
1,150.80 |
220.00 |
2,531.76 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
19.180 |
MILE |
500.00 |
9,590.00 |
500.00 |
9,590.00 |
10.00 |
191.80 |
440.00 |
8,439.20 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
150   |
EACH |
55.00 |
8,250.00 |
65.00 |
9,750.00 |
25.00 |
3,750.00 |
54.00 |
8,100.00 |
| 713-06-C |
temporary pavement legends and symbols (only)
|
15   |
EACH |
55.00 |
825.00 |
65.00 |
975.00 |
25.00 |
375.00 |
54.00 |
810.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
555   |
SQYD |
50.00 |
27,750.00 |
60.00 |
33,300.00 |
40.00 |
22,200.00 |
55.00 |
30,525.00 |
| 726-01 |
bedding material
|
14.8 |
CUYD |
50.00 |
740.00 |
30.00 |
444.00 |
FREE |
FREE |
50.00 |
740.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
130,000.00 |
130,000.00 |
68,000.00 |
68,000.00 |
85,000.00 |
85,000.00 |
100,000.00 |
100,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
70.00 |
1,400.00 |
80.00 |
1,600.00 |
68.00 |
1,360.00 |
68.00 |
1,360.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
90.00 |
360.00 |
100.00 |
400.00 |
88.00 |
352.00 |
88.00 |
352.00 |
| 731-02 |
reflectorized raised pavement markers
|
346   |
EACH |
6.00 |
2,076.00 |
6.00 |
2,076.00 |
6.00 |
2,076.00 |
4.90 |
1,695.40 |
| 732-01-C |
plastic pavement striping (8" width)
|
510   |
LNFT |
1.00 |
510.00 |
2.00 |
1,020.00 |
1.50 |
765.00 |
0.90 |
459.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
85   |
LNFT |
3.00 |
255.00 |
4.00 |
340.00 |
3.50 |
297.50 |
2.70 |
229.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.672 |
MILE |
2,000.00 |
15,344.00 |
2,050.00 |
15,727.60 |
2,200.00 |
16,878.40 |
1,790.00 |
13,732.88 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.836 |
MILE |
700.00 |
2,685.20 |
750.00 |
2,877.00 |
750.00 |
2,877.00 |
660.00 |
2,531.76 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
50   |
EACH |
135.00 |
6,750.00 |
150.00 |
7,500.00 |
150.00 |
7,500.00 |
125.00 |
6,250.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
EACH |
145.00 |
725.00 |
200.00 |
1,000.00 |
150.00 |
750.00 |
135.00 |
675.00 |
| 735-01 |
mailboxes
|
1   |
EACH |
10.00 |
10.00 |
6.00 |
6.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
200.00 |
200.00 |
300.00 |
300.00 |
135.00 |
135.00 |
110.00 |
110.00 |
| 736-09 |
loop detector
|
1,800   |
LNFT |
13.00 |
23,400.00 |
15.00 |
27,000.00 |
10.00 |
18,000.00 |
10.00 |
18,000.00 |
| 736-10 |
underground junction box
|
6   |
EACH |
280.00 |
1,680.00 |
300.00 |
1,800.00 |
300.00 |
1,800.00 |
260.00 |
1,560.00 |
| 739-01 |
hydro-seeding
|
2.32 |
ACRE |
1,100.00 |
2,552.00 |
1,500.00 |
3,480.00 |
1,100.00 |
2,552.00 |
1,100.00 |
2,552.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
15,000.00 |
15,000.00 |
| S-001 |
cement treated base course (8 1/2 in depth)
|
38,094   |
SQYD |
5.00 |
190,470.00 |
4.25 |
161,899.50 |
5.00 |
190,470.00 |
4.50 |
171,423.00 |
| S-002 |
rumble strips (ground-in)
|
3.5 |
MILE |
900.00 |
3,150.00 |
1,000.00 |
3,500.00 |
775.00 |
2,712.50 |
1,200.00 |
4,200.00 |
| S-003 |
special guardrail anchor section
|
2   |
EACH |
1,100.00 |
2,200.00 |
1,200.00 |
2,400.00 |
1,000.00 |
2,000.00 |
1,000.00 |
2,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,674,291.75 |
|
1,698,600.78 |
|
1,733,101.21 |
|
1,792,501.26 |
|