| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - SPECIALTY CONTRACTORS |
- 2 - LINCOLN CONCRETE, INC. |
- 3 - THE MABRY COMPANY, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
71,000.00 |
71,000.00 |
84,000.00 |
84,000.00 |
48,000.00 |
48,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
FREE |
FREE |
FREE |
FREE |
3,000.00 |
3,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
95   |
sq m |
10.00 |
950.00 |
20.00 |
1,900.00 |
25.00 |
2,375.00 |
|
|
| 202-02-01 |
removal of sign (lt. of sta. 1+350; 2.44m x 1.22m)
|
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-02 |
removal of sign w/wood post (lt. of sta. 1+497; 0.91m
x 1.22m) |
1   |
ea |
FREE |
FREE |
1.00 |
1.00 |
FREE |
FREE |
|
|
| 202-02-03 |
removal of sign w/wood post (lt. of sta. 1+524; 0.61m
x 0.91m) |
1   |
ea |
FREE |
FREE |
1.00 |
1.00 |
FREE |
FREE |
|
|
| 202-02-04 |
removal of sign (rt. of sta. 1+747; 1.22m x 1.52m)
|
1   |
ea |
FREE |
FREE |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-05 |
removal of sign w/wood post (rt. of sta. 1+778; 2.44m
x 3.05m) |
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
300.00 |
300.00 |
|
|
| 202-02-06 |
removal of sign (rt. of sta. 1+893; 0.91m x 3.05m)
|
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
300.00 |
300.00 |
|
|
| 202-02-07 |
removal of sign w/wood post (rt. of sta. 2+118; 1.22m
x 2.44m) |
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-08 |
removal of slab (rt. of sta. 2+122; 4.27m x 30.48m)
|
1   |
ea |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-09 |
removal of sign w/wood post (rt. of sta. 2+132; 1.22m
x 1.22m) |
1   |
ea |
FREE |
FREE |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-10 |
removal of sign w/wood post (rt. of sta. 2+553; 1.52m
x 1.52m) |
1   |
ea |
FREE |
FREE |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-11 |
removal of sign (rt. of sta. 2+684; 1.22m x 2.44m)
|
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-12 |
removal of 40' metal gate (rt. of sta. 2+820)
|
1   |
ea |
500.00 |
500.00 |
300.00 |
300.00 |
100.00 |
100.00 |
|
|
| 202-02-13 |
removal of sign (lt. of sta. 1+744)
|
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
FREE |
FREE |
|
|
| 202-02-14 |
removal of metal septic tank (lt. of sta. 2+915)
|
1   |
ea |
500.00 |
500.00 |
200.00 |
200.00 |
750.00 |
750.00 |
|
|
| 202-02-15 |
removal of signframe w/wood post (lt. of sta. 2+926;
3.05m x 6.10m) |
1   |
ea |
200.00 |
200.00 |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-16 |
removal of billboard w/wood post (lt. of sta. 2+965;
3.05m x 6.10m) |
1   |
ea |
500.00 |
500.00 |
200.00 |
200.00 |
300.00 |
300.00 |
|
|
| 202-02-17 |
removal of sign w/wood post (lt. of sta. 3+385; 0.61m
x 2.44m) |
1   |
ea |
FREE |
FREE |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-18 |
removal of mailbox w/metal post (rt. of sta. 4+031)
|
1   |
ea |
FREE |
FREE |
1.00 |
1.00 |
FREE |
FREE |
|
|
| 202-02-19 |
removal of mailbox w/metal post (rt. of sta. 4+102)
|
1   |
ea |
FREE |
FREE |
1.00 |
1.00 |
FREE |
FREE |
|
|
| 202-02-20 |
removal of sign (rt. of sta. 4+352; 0.91m x 2.44m)
|
1   |
ea |
FREE |
FREE |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-21 |
removal of sign (rt. of sta. 4+387; 4.88m x 2.44m)
|
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
500.00 |
500.00 |
|
|
| 202-02-22 |
removal of sign (lt. of sta. 4+486; 1.22m x 2.44m)
|
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-23 |
removal of sign (lt. of sta. 4+529; 0.91m x 2.44m)
|
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-24 |
removal of post (lt. of sta. 1+750; 1.5m)
|
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
FREE |
FREE |
|
|
| 202-02-25 |
removal of sign (lt. of sta. 1+833; 2.43m x 2.43m)
|
1   |
ea |
50.00 |
50.00 |
1.00 |
1.00 |
250.00 |
250.00 |
|
|
| 202-02-26 |
removal of sign (lt. of sta. 1+880; 6.10m x 2.43m)
|
1   |
ea |
250.00 |
250.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-27 |
removal of air & water station w/light (lt. of sta.
1+881) |
1   |
ea |
300.00 |
300.00 |
1.00 |
1.00 |
500.00 |
500.00 |
|
|
| 202-02-28 |
removal of underground storage tanks/filler caps
(3-8,000 gal.) |
3   |
ea |
1,500.00 |
4,500.00 |
1,000.00 |
3,000.00 |
3,650.00 |
10,950.00 |
|
|
| 202-02-29 |
removal of underground storage tanks/filler caps
(1-10,000 gal.) |
1   |
ea |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
4,450.00 |
4,450.00 |
|
|
| 202-02-30 |
removal of monitoring wells (lt.of sta. 1+878)
|
4   |
ea |
1,500.00 |
6,000.00 |
300.00 |
1,200.00 |
250.00 |
1,000.00 |
|
|
| 203-01 |
general excavation
|
80   |
cu m |
13.00 |
1,040.00 |
8.00 |
640.00 |
8.00 |
640.00 |
|
|
| 203-04 |
embankment
|
230   |
cu m |
13.00 |
2,990.00 |
9.60 |
2,208.00 |
20.00 |
4,600.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
125   |
ea |
50.00 |
6,250.00 |
50.00 |
6,250.00 |
150.00 |
18,750.00 |
|
|
| 204-06 |
temporary silt fencing
|
7,100   |
ln m |
0.10 |
710.00 |
FREE |
FREE |
5.00 |
35,500.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
cu m |
FREE |
FREE |
FREE |
FREE |
25.00 |
25,000.00 |
|
|
| 705-01 |
barbed wire fence
|
165   |
ln m |
18.00 |
2,970.00 |
16.00 |
2,640.00 |
23.00 |
3,795.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
9,000.00 |
9,000.00 |
15,000.00 |
15,000.00 |
3,500.00 |
3,500.00 |
|
|
| 717-01 |
seeding
|
385   |
kg |
13.78 |
5,305.30 |
20.00 |
7,700.00 |
16.50 |
6,352.50 |
|
|
| 718-01 |
fertilizer
|
9,576   |
kg |
0.51 |
4,883.76 |
0.70 |
6,703.20 |
0.75 |
7,182.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
13,000.00 |
13,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
138,899.06 |
|
149,964.20 |
|
216,194.50 |
|
|
|