Letting of 5/25/2005 LA DOTD Headquarters


REBID
go back
Go Back
 
Lead Project: 025-02-0040
Parish: SABINE
Routes: US 171, LA 6
Description: MANY SIDEWALKS
Type Const: concrete sidewalks and related work.
 
RankLicenseBidderAmount
141051 THE MECO GROUP INC. $400,665.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
THE MECO GROUP INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 4,000.00 4,000.00            
202-02-D removal of concrete walks & drives 2,365      SQYD 11.00 26,015.00            
202-03 relocation of signs 25      EACH 400.00 10,000.00            
702-04-A adjusting manholes 1      EACH 1,200.00 1,200.00            
706-01-A concrete walk (4" thick) 2,240.0    SQYD 37.00 82,880.00            
706-01-C concrete walk (6" thick) 125.0    SQYD 50.00 6,250.00            
707-03 combination concrete curb & gutter 2,130.0    LNFT 28.00 59,640.00            
713-01 temporary signs & barricades lump      LUMP 7,000.00 7,000.00            
714-01 slab sodding 140      SQYD 12.00 1,680.00            
723-02 granular material (vehicular measurement) 130      CUYD 55.00 7,150.00            
727-01 mobilization lump      LUMP 25,000.00 25,000.00            
732-01-B plastic pavement striping (6" width)(white solid line) 680      LNFT 9.00 6,120.00            
740-01 construction layout lump      LUMP 1,000.00 1,000.00            
805-01-I class a concrete (steps) 55.00   CUYD 500.00 27,500.00            
S-001 special design slotted drain 1      EACH 4,000.00 4,000.00            
S-002 special design faux brick overlay 21,288      SQFT 3.75 79,830.00            
S-003 special design ramp (sta 4+95, 26' to 51' rt) 1      EACH 6,000.00 6,000.00            
S-004 special design ramp (sta. 14+77, 32.5' to 47' right) 1      EACH 5,000.00 5,000.00            
S-005 special design retaining wall 3      EACH 6,800.00 20,400.00            
 SUBTOTAL GENERAL       380,665.00            
                       
ALTERNATE A additive alternate a1                    
                       
ALTERNATE A1 additive alternate a1                    
S-006 special design temporary access lump      LUMP 20,000.00 20,000.00            
 SUBTOTAL ALT A1       20,000.00            
                       
 CONTRACTOR TOTAL       400,665.00            