Lead Project: 015-07-0044
Parish: CALDWELL
Routes: US 165
Description: LA 847 - OUACHITA PARISH LINE
Type Const: lime trmt, class ii bc, superpave asp (atl. a-1), pccp (alt. a-2), conc. slab span
bridge, conc. girder bridge w/pile footing (alt. b-1), drill shaft (alt. b-2) & related work
 
RankLicenseBidderAmount
134567 JAMES CONSTRUCTION GROUP LLC $21,951,560.40
212312 GILCHRIST CONSTRUCTION CO. LLC $24,965,495.45
339462 DENTON-JAMES LLC $24,986,588.96
412487 DIAMOND B CONSTRUCTION CO., L.L.C. $26,989,798.80
521810 HIGHWAY SPECIALISTS INC. $28,230,922.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
DENTON-JAMES LLC
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 300,000.00 300,000.00 500,000.00 500,000.00 900,000.00 900,000.00 50,000.00 50,000.00
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00 20,000.00 20,000.00 40,000.00 40,000.00 20,000.00 20,000.00
202-02-A removal of bridges - sta. 487+08.00 to sta.
491+60.00 (23'x 452' concrete deck & bents with
steel i-beams)
1      EACH 50,000.00 50,000.00 50,000.00 50,000.00 80,000.00 80,000.00 50,000.00 50,000.00
202-02-B-01 removal of concrete box culverts (sta. 467+00; 1-3'x
6'x 54')
1      EACH 1,800.00 1,800.00 2,000.00 2,000.00 3,000.00 3,000.00 8,000.00 8,000.00
202-02-B-02 removal of concrete box culverts (sta. 482+25; 1-4'x
5'x 100')
1      EACH 1,800.00 1,800.00 4,000.00 4,000.00 6,000.00 6,000.00 16,000.00 16,000.00
202-02-B-03 removal of concrete box culverts (sta. 535+40; 2-3'x
8'x 52')
1      EACH 1,800.00 1,800.00 8,000.00 8,000.00 5,000.00 5,000.00 8,000.00 8,000.00
202-02-G removal of surfacing & stabilized base 3,603.8    SQYD 6.50 23,424.70 1.00 3,603.80 3.20 11,532.16 5.13 18,487.49
202-02-H removal of guard rail 380      LNFT 3.00 1,140.00 7.00 2,660.00 3.00 1,140.00 6.00 2,280.00
202-02-I removal of pavement structure (pcc pavement with 12"
asphaltic concrete overlay and shoulders)
4,210.3    LNFT 4.00 16,841.20 18.00 75,785.40 24.00 101,047.20 18.00 75,785.40
202-02-J removal of shoulder surfacing 5,066.0    SQYD 3.00 15,198.00 4.00 20,264.00 2.50 12,665.00 4.44 22,493.04
202-02-01 removal of headwalls 3      EACH 1,000.00 3,000.00 800.00 2,400.00 1,000.00 3,000.00 2,000.00 6,000.00
202-02-02 removal of 10' x 125' concrete pad (truck scale)(lt.
of sta. 547+00)
1      EACH 1,000.00 1,000.00 10,000.00 10,000.00 1.00 1.00 1.00 1.00
202-02-03 removal of 60' x 70' conc. block commercial building
(lt. of sta. 548+00) (contains non-friable
asbestos)
1      EACH 2,000.00 2,000.00 15,000.00 15,000.00 1.00 1.00 1.00 1.00
202-02-04 removal of sign (rt. of sta. 575+00) 1      EACH 100.00 100.00 300.00 300.00 1.00 1.00 1.00 1.00
202-02-05 removal of 40' x 50' metal frame commercial building
(lt. of sta. 589+50)
1      EACH 1,400.00 1,400.00 7,500.00 7,500.00 1.00 1.00 1.00 1.00
202-02-06 removal of 10' x 10' masonry commercial building (lt.
of sta. 590+00)
1      EACH 150.00 150.00 1,000.00 1,000.00 1.00 1.00 1.00 1.00
202-02-07 removal of signs (lt. of sta. 590+00) 2      EACH 100.00 200.00 50.00 100.00 1.00 2.00 1.00 2.00
202-02-08 removal of 45' x 45' concrete slab (lt. of sta. 603+00) 1      EACH 800.00 800.00 1,200.00 1,200.00 1.00 1.00 1.00 1.00
202-02-09 removal of 32' x 40' barn (lt. of sta. 683+50) 1      EACH 800.00 800.00 8,500.00 8,500.00 1.00 1.00 1.00 1.00
202-02-10 removal of 30' x 62' wood frame residence on piers
(lt. of sta. 686+00)
1      EACH 600.00 600.00 8,500.00 8,500.00 1.00 1.00 1.00 1.00
202-02-11 removal of 30' x 66' concrete slab (lt. of sta. 697+50) 1      EACH 1,000.00 1,000.00 1,000.00 1,000.00 1.00 1.00 1.00 1.00
202-02-12 removal of 30' x 56' brick residence (lt. of sta.
698+50)(contains non-friable asbestos)
1      EACH 1,700.00 1,700.00 7,500.00 7,500.00 1.00 1.00 1.00 1.00
202-02-13 removal of 40' x 45' wood frame residence on piers
(lt. of sta. 733+00) (contains non-friable
asbestos)
1      EACH 1,000.00 1,000.00 1,200.00 1,200.00 1.00 1.00 1.00 1.00
202-02-14 removal of 44' x 46' brick residence (lt. of sta.
734+30)(contains non-friable asbestos)
1      EACH 1,400.00 1,400.00 7,500.00 7,500.00 1.00 1.00 1.00 1.00
202-02-15 removal of 12' x 70' mobile home (lt. of sta. 734+30) 1      EACH 1.00 1.00 100.00 100.00 1.00 1.00 1.00 1.00
202-02-16 removal of 38' x 44' wood frame residence (lt. 747+00)
(contains non-friable asbestos)
1      EACH 1,100.00 1,100.00 7,500.00 7,500.00 1.00 1.00 1.00 1.00
202-02-17 removal of 28' x 37' wood frame residence on piers
(lt. of 752+00) (contains non-friable asbestos)
1      EACH 700.00 700.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-18 removal of 25' x 34' wood frame residence on piers
(lt. of sta. 758+50) (contains non-friable
asbestos)
1      EACH 400.00 400.00 6,000.00 6,000.00 1.00 1.00 1.00 1.00
202-02-19 removal of abandoned underground utilities (1" steel
gasline)
790      LNFT 3.00 2,370.00 3.50 2,765.00 1.00 790.00 3.00 2,370.00
202-02-20 removal of abandoned underground utilities (water line) 1,700      LNFT 3.00 5,100.00 4.00 6,800.00 1.00 1,700.00 3.00 5,100.00
202-05 excavation, disposal and backfilling of contaminated
soil
22      CUYD 10.00 220.00 600.00 13,200.00 300.00 6,600.00 550.00 12,100.00
203-01 general excavation 65,732      CUYD 2.80 184,049.60 4.50 295,794.00 3.50 230,062.00 4.00 262,928.00
203-02 drainage excavation 1,843      CUYD 6.00 11,058.00 6.00 11,058.00 8.00 14,744.00 4.00 7,372.00
203-03 muck excavation 2,000      CUYD 7.00 14,000.00 6.00 12,000.00 8.00 16,000.00 12.00 24,000.00
203-04 embankment 253,856      CUYD 7.50 1,903,920.00 10.00 2,538,560.00 8.00 2,030,848.00 10.75 2,728,952.00
204-02 temporary hay or straw bales 175      EACH 6.00 1,050.00 12.00 2,100.00 7.00 1,225.00 4.00 700.00
204-05-A temporary sediment check dam(hay) 76      EACH 90.00 6,840.00 150.00 11,400.00 90.00 6,840.00 100.00 7,600.00
204-06 temporary silt fencing 2,900      LNFT 2.00 5,800.00 2.25 6,525.00 1.40 4,060.00 6.00 17,400.00
401-02 aggregate surface course (adjusted vehicular
measurement)
648      CUYD 28.00 18,144.00 50.00 32,400.00 50.00 32,400.00 30.00 19,440.00
402-01 traffic maintenance aggregate (vehicular measurement) 2,500.0    CUYD 35.00 87,500.00 30.00 75,000.00 45.00 112,500.00 30.00 75,000.00
509-01 cold planing asphaltic pavement 3,483      SQYD 2.00 6,966.00 2.00 6,966.00 2.30 8,010.90 4.00 13,932.00
509-02 contractor retained reclaimed asphaltic pavement - 100      CUYD 1.00 - 100.00 1.00 - 100.00 1.00 - 100.00 0.10 - 10.00
701-01-F cross drain pipe (15" rcp/pcp) 944      LNFT 45.00 42,480.00 36.00 33,984.00 40.00 37,760.00 70.00 66,080.00
701-01-I cross drain pipe (24" rcp/pcp) 88      LNFT 52.00 4,576.00 56.00 4,928.00 52.00 4,576.00 90.00 7,920.00
701-02-A cross drain pipe arch (15" equiv. rcpa) 1,262      LNFT 75.00 94,650.00 47.00 59,314.00 50.00 63,100.00 80.00 100,960.00
701-02-D cross drain pipe arch (24" equiv. rcpa) 168      LNFT 85.00 14,280.00 63.00 10,584.00 65.00 10,920.00 90.00 15,120.00
701-02-E cross drain pipe arch (30" equiv. rcpa) 192      LNFT 95.00 18,240.00 80.00 15,360.00 70.00 13,440.00 118.00 22,656.00
701-02-F cross drain pipe arch (36" equiv. rcpa) 364      LNFT 125.00 45,500.00 100.00 36,400.00 90.00 32,760.00 129.00 46,956.00
701-02-I cross drain pipe arch (54" equiv. rcpa) 524      LNFT 180.00 94,320.00 175.00 91,700.00 160.00 83,840.00 182.00 95,368.00
701-02-J cross drain pipe arch (60" equiv. rcpa) 612      LNFT 210.00 128,520.00 200.00 122,400.00 200.00 122,400.00 240.00 146,880.00
701-05-G side drain pipe (18") 196      LNFT 35.00 6,860.00 50.00 9,800.00 35.00 6,860.00 43.00 8,428.00
701-05-I side drain pipe (24") 188      LNFT 50.00 9,400.00 70.00 13,160.00 40.00 7,520.00 54.00 10,152.00
701-05-K side drain pipe (30") 410      LNFT 60.00 24,600.00 85.00 34,850.00 50.00 20,500.00 75.00 30,750.00
701-05-M side drain pipe (36") 282      LNFT 75.00 21,150.00 100.00 28,200.00 60.00 16,920.00 107.00 30,174.00
701-05-N side drain pipe (42") 196      LNFT 95.00 18,620.00 115.00 22,540.00 70.00 13,720.00 139.00 27,244.00
701-05-O side drain pipe (48") 74      LNFT 115.00 8,510.00 150.00 11,100.00 80.00 5,920.00 180.00 13,320.00
701-06-D side drain pipe arch (24" equiv.) 60      LNFT 60.00 3,600.00 80.00 4,800.00 70.00 4,200.00 86.00 5,160.00
701-06-E side drain pipe arch (30" equiv.) 150      LNFT 70.00 10,500.00 90.00 13,500.00 80.00 12,000.00 100.00 15,000.00
701-06-F side drain pipe arch (36" equiv.) 112      LNFT 85.00 9,520.00 100.00 11,200.00 90.00 10,080.00 113.00 12,656.00
701-06-G side drain pipe arch (42" equiv.) 64      LNFT 100.00 6,400.00 140.00 8,960.00 120.00 7,680.00 134.00 8,576.00
701-06-H side drain pipe arch (48" equiv.) 62      LNFT 120.00 7,440.00 160.00 9,920.00 140.00 8,680.00 182.00 11,284.00
701-10-I reinforced concrete pipe (extension)(24") 394      LNFT 150.00 59,100.00 70.00 27,580.00 60.00 23,640.00 97.00 38,218.00
701-10-S reinforced concrete pipe (extension)(72") 320      LNFT 375.00 120,000.00 250.00 80,000.00 270.00 86,400.00 320.00 102,400.00
701-15 concrete collar 1      EACH 1,200.00 1,200.00 1,200.00 1,200.00 1,000.00 1,000.00 1,100.00 1,100.00
702-03-A catch basins (cb-01) 25      EACH 2,600.00 65,000.00 3,200.00 80,000.00 2,200.00 55,000.00 2,300.00 57,500.00
702-03-B catch basins (cb-02) 1      EACH 3,400.00 3,400.00 4,200.00 4,200.00 3,000.00 3,000.00 4,300.00 4,300.00
702-07-A cross drain safety end (type 1) 1      EACH 1,400.00 1,400.00 1,300.00 1,300.00 1,500.00 1,500.00 1,200.00 1,200.00
704-03 blocked out guard rail 1,318.8    LNFT 18.00 23,738.40 17.00 22,419.60 16.00 21,100.80 17.00 22,419.60
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 38.00 7,600.00 50.00 10,000.00 40.00 8,000.00 42.00 8,400.00
704-11-A guard rail end treatment (flared) 6      EACH 2,000.00 12,000.00 2,000.00 12,000.00 1,700.00 10,200.00 1,800.00 10,800.00
704-11-B guard rail end treatment (tangent) 2      EACH 2,200.00 4,400.00 2,500.00 5,000.00 1,900.00 3,800.00 2,000.00 4,000.00
705-02 combination mesh & barbed wire fence 6,569      LNFT 6.50 42,698.50 5.50 36,129.50 4.50 29,560.50 5.00 32,845.00
705-04 single swinging driveway gates 5      EACH 300.00 1,500.00 550.00 2,750.00 500.00 2,500.00 425.00 2,125.00
705-06-E-01 chain link fence (7'-4" height-structure mounted) 492      LNFT 16.00 7,872.00 45.00 22,140.00 30.00 14,760.00 37.00 18,204.00
708-01 right-of-way monument 89      EACH 200.00 17,800.00 275.00 24,475.00 100.00 8,900.00 110.00 9,790.00
708-02 right-of-way monument witness post 89      EACH 200.00 17,800.00 275.00 24,475.00 100.00 8,900.00 110.00 9,790.00
711-01-D riprap (55 lb.x 18" thick) 13,758      SQYD 0.01 137.58 1.00 13,758.00 35.00 481,530.00 32.00 440,256.00
711-04 geotextile fabric 13,758      SQYD 0.01 137.58 0.10 1,375.80 1.40 19,261.20 2.00 27,516.00
712-04 flexible revetment 7,699      SQYD 0.01 76.99 1.00 7,699.00 38.00 292,562.00 32.00 246,368.00
713-01 temporary signs & barricades lump      LUMP 80,000.00 80,000.00 120,000.00 120,000.00 100,000.00 100,000.00 100,000.00 100,000.00
713-07 temporary reflectorized raised pavement markers 831      EACH 3.00 2,493.00 9.00 7,479.00 5.00 4,155.00 5.00 4,155.00
716-01-A mulch (vegetative) 32.78   ACRE 500.00 16,390.00 650.00 21,307.00 600.00 19,668.00 640.00 20,979.20
717-01 seeding 3,000      LB 7.00 21,000.00 6.00 18,000.00 6.00 18,000.00 6.00 18,000.00
718-01 fertilizer 100,000      LB 0.25 25,000.00 0.35 35,000.00 0.22 22,000.00 0.32 32,000.00
718-02 agricultural lime 200.0    TON 60.00 12,000.00 85.00 17,000.00 80.00 16,000.00 86.00 17,200.00
720-01-A erosion control system, slope protection (type a) 5,901      SQYD 1.25 7,376.25 1.50 8,851.50 1.30 7,671.30 1.50 8,851.50
720-01-B erosion control system, slope protection (type b) 1,778      SQYD 1.25 2,222.50 1.50 2,667.00 1.30 2,311.40 1.50 2,667.00
720-01-C erosion control system, flexible channel liner (type c) 1,244      SQYD 1.50 1,866.00 2.00 2,488.00 2.60 3,234.40 2.00 2,488.00
722-02 project site laboratory (equipped) 1      EACH 8,000.00 8,000.00 15,000.00 15,000.00 30,000.00 30,000.00 20,000.00 20,000.00
724-01-C pavement patching (17" minimum thickness) 502      SQYD 200.00 100,400.00 100.00 50,200.00 80.00 40,160.00 125.00 62,750.00
725-01 temporary detour roads 1,255.4    LNFT 75.00 94,155.00 130.00 163,202.00 140.00 175,756.00 250.00 313,850.00
726-01 bedding material 1,826.5    CUYD 50.00 91,325.00 55.00 100,457.50 35.00 63,927.50 26.00 47,489.00
727-01 mobilization lump      LUMP 2,000,000.00 2,000,000.00 2,200,000.00 2,200,000.00 2,400,000.00 2,400,000.00 1,600,000.00 1,600,000.00
729-16-C object marker assembly (type 3) 8      EACH 75.00 600.00 75.00 600.00 70.00 560.00 70.00 560.00
729-19-A dead end road installations(type a) 3      EACH 5,000.00 15,000.00 3,300.00 9,900.00 3,700.00 11,100.00 4,000.00 12,000.00
731-01 nonreflectorized raised pavement markers 105      EACH 12.00 1,260.00 12.00 1,260.00 10.00 1,050.00 11.00 1,155.00
731-02 reflectorized raised pavement markers 2,492      EACH 8.50 21,182.00 8.50 21,182.00 5.00 12,460.00 5.00 12,460.00
732-02-A plastic pavement striping (solid line) (4" width) 25.746  MILE 2,200.00 56,641.20 2,300.00 59,215.80 1,800.00 46,342.80 2,000.00 51,492.00
732-02-C plastic pavement striping (solid line) (8" width) 0.886  MILE 4,500.00 3,987.00 4,500.00 3,987.00 4,300.00 3,809.80 4,600.00 4,075.60
732-02-E plastic pavement striping (solid line)(24" width) 0.304  MILE 12,500.00 3,800.00 14,000.00 4,256.00 13,000.00 3,952.00 14,000.00 4,256.00
732-04-A plastic pavement legends & symbols (arrow) 10      EACH 150.00 1,500.00 150.00 1,500.00 130.00 1,300.00 135.00 1,350.00
732-04-C plastic pavement legends & symbols (only) 10      EACH 150.00 1,500.00 150.00 1,500.00 130.00 1,300.00 135.00 1,350.00
732-05 removal of existing markings 10.240  MILE 5,500.00 56,320.00 5,500.00 56,320.00 4,000.00 40,960.00 4,300.00 44,032.00
735-01 mailboxes 35      EACH 1.00 35.00 50.00 1,750.00 1.00 35.00 15.00 525.00
735-02 mailbox supports (single) 35      EACH 150.00 5,250.00 200.00 7,000.00 140.00 4,900.00 150.00 5,250.00
740-01 construction layout lump      LUMP 200,000.00 200,000.00 240,000.00 240,000.00 200,000.00 200,000.00 95,000.00 95,000.00
744-01 traffic control management lump      LUMP 5,000.00 5,000.00 24,000.00 24,000.00 40,000.00 40,000.00 50,000.00 50,000.00
805-03 class aa concrete 5,481.38   CUYD 350.00 1,918,483.00 380.00 2,082,924.40 450.00 2,466,621.00 425.00 2,329,586.50
805-08-D precast-prestressed concrete girders (type iv) 29,317.7    LNFT 95.00 2,785,181.50 95.00 2,785,181.50 93.50 2,741,204.95 155.00 4,544,243.50
805-11 strip seal joints 664.00   LNFT 120.00 79,680.00 135.00 89,640.00 120.00 79,680.00 110.00 73,040.00
805-12-Y reinforced concrete box culverts (extension) (2'x 2') 106.0    LNFT 220.00 23,320.00 185.00 19,610.00 150.00 15,900.00 275.00 29,150.00
805-12-Z reinforced concrete box culverts (extension) (2'x 5') 104.0    LNFT 290.00 30,160.00 285.00 29,640.00 220.00 22,880.00 300.00 31,200.00
807-06 structural metal work lump      LUMP 10,000.00 10,000.00 14,000.00 14,000.00 20,000.00 20,000.00 10,000.00 10,000.00
810-01 concrete railing (barrier) 9,086.73   LNFT 30.00 272,601.90 40.00 363,469.20 35.00 318,035.55 37.00 336,209.01
813-01 concrete approach slabs 1,105.54   SQYD 150.00 165,831.00 150.00 165,831.00 130.00 143,720.20 175.00 193,469.50
814-02-J test hole (66") 97.4    LNFT 500.00 48,700.00 300.00 29,220.00 280.00 27,272.00 275.00 26,785.00
S-001 rumble strips (ground-in) 12.3    MILE 1,000.00 12,300.00 1,000.00 12,300.00 800.00 9,840.00 1,100.00 13,530.00
S-002 cleaning existing ditches 325      LNFT 30.00 9,750.00 9.00 2,925.00 10.00 3,250.00 10.00 3,250.00
S-003 sawcutting existing asphalt pavement (full depth) 19,643      INFT 1.00 19,643.00 1.00 19,643.00 0.60 11,785.80 1.50 29,464.50
S-004 temporary guard rail 575      LNFT 35.00 20,125.00 45.00 25,875.00 35.00 20,125.00 38.00 21,850.00
S-005 plugging existing water wells 2      EACH 1,000.00 2,000.00 5,000.00 10,000.00 2,000.00 4,000.00 1,600.00 3,200.00
S-006 sawcutting existing portland cement concrete pavement
(full depth)
640      INFT 1.50 960.00 2.50 1,600.00 1.20 768.00 1.50 960.00
S-101 precast-prestressed high performance (hpc) girders
(type iv)
2,241.0    LNFT 120.00 268,920.00 125.00 280,125.00 100.30 224,772.30 215.00 481,815.00
 SUBTOTAL GENERAL       12,143,257.90   13,834,390.00   14,564,080.76   15,827,551.84
                       
ALTERNATE A roadway                    
                       
ALTERNATE A1 superpave aspahltic concrete alternate                    
203-05 nonplastic embankment 4,645      CUYD 65.00 301,925.00 60.00 278,700.00 60.00 278,700.00 68.00 315,860.00
302-01 class ii base course 43,154.0    CUYD 44.00 1,898,776.00 56.00 2,416,624.00 49.00 2,114,546.00 60.00 2,589,240.00
304-05 lime treatment (type e) 1,194      TON 120.00 143,280.00 1.00 1,194.00 200.00 238,800.00 216.00 257,904.00
305-01 subgrade layer (12" thick) 168,497      SQYD 5.00 842,485.00 8.00 1,347,976.00 6.00 1,010,982.00 6.57 1,107,025.29
502-01 superpave asphaltic concrete 47,257.6    TON 49.00 2,315,622.40 50.00 2,362,880.00 49.00 2,315,622.40 48.00 2,268,364.80
502-01-A superpave asphaltic concrete, paved drives and
turnouts
4,865.9    TON 58.00 282,222.20 70.00 340,613.00 58.00 282,222.20 58.00 282,222.20
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.302  MILE 400.00 2,520.80 400.00 2,520.80 300.00 1,890.60 320.00 2,016.64
713-05-A temporary pavement markings (solid line)(4" width) 12.603  MILE 700.00 8,822.10 750.00 9,452.25 500.00 6,301.50 535.00 6,742.60
732-03-A plastic pavement striping (broken line)(4" width) 13.469  MILE 900.00 12,122.10 1,000.00 13,469.00 700.00 9,428.30 750.00 10,101.75
 SUBTOTAL ALT A1       5,807,775.60   6,773,429.05   6,258,493.00   6,839,477.28
                       
ALTERNATE A2 portland cement concrete pavement alternate                    
203-05 nonplastic embankment 4,645      CUYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
302-01 class ii base course 37,364.9    CUYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
304-05 lime treatment (type e) 1,196.46   TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
305-01 subgrade layer (12" thick) 168,531      SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
502-01 superpave asphaltic concrete 13,716.3    TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
502-01-A superpave asphaltic concrete, paved drives and
turnouts
931.7    TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601-01-G portland cement concrete pavement (8" thick) 97,254.2    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601-02-G portland cement concrete pavement (8" thick)
(crossovers & turnouts)
11,477.0    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601-04 portland cement concrete pavement coring 135      EACH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.795  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
713-04-B-01 temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable)
5.507  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
713-05-A temporary pavement markings (solid line)(4" width) 1.591  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
11.012  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
732-03-A plastic pavement striping (broken line)(4" width) 5.321  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
8.148  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
                       
ALTERNATE B bridge alternates                    
                       
ALTERNATE B1 pile footing alternate                    
802-02 structural excavation for intermediate bents 2,572.7    CUYD 20.00 51,454.00 12.00 30,872.40 12.00 30,872.40 20.00 51,454.00
804-01-B precast concrete piles (14") 29,454      LNFT 25.00 736,350.00 21.00 618,534.00 24.00 706,896.00 32.00 942,528.00
804-01-C precast concrete piles (16") 16,764      LNFT 30.00 502,920.00 28.00 469,392.00 28.00 469,392.00 34.00 569,976.00
804-12 loading permanent piles 2      EACH 800.00 1,600.00 12,000.00 24,000.00 1,000.00 2,000.00 3,700.00 7,400.00
805-01-D class a concrete (footings) 1,174.08   CUYD 240.00 281,779.20 400.00 469,632.00 240.00 281,779.20 246.00 288,823.68
805-01-F class a concrete (bents) 2,417.89   CUYD 330.00 797,903.70 400.00 967,156.00 440.00 1,063,871.60 400.00 967,156.00
806-01 deformed reinforcing steel 1,956,200      LB 0.60 1,173,720.00 0.70 1,369,340.00 0.62 1,212,844.00 0.56 1,095,472.00
814-01-J drilled shaft (66") 921.0    LNFT 400.00 368,400.00 350.00 322,350.00 360.00 331,560.00 360.00 331,560.00
814-03-J permanent casing (66") 240.0    LNFT 250.00 60,000.00 250.00 60,000.00 220.00 52,800.00 235.00 56,400.00
814-04-J crosshole sonic logging (66") 12      EACH 2,200.00 26,400.00 2,200.00 26,400.00 1,000.00 12,000.00 1,000.00 12,000.00
 SUBTOTAL ALT B1       4,000,526.90   4,357,676.40   4,164,015.20   4,322,769.68
                       
ALTERNATE B2 drilled shaft alternate                    
804-01-C precast concrete piles (16") 1,608      LNFT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
804-12 loading permanent piles 1      EACH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
805-01-F class a concrete (bents) 2,518.94   CUYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
806-01 deformed reinforcing steel 1,861,818      LB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
814-01-B drilled shaft (24") 272.8    LNFT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
814-01-J drilled shaft (66") 7,756.6    LNFT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
814-03-B permanent casing (24") 160.0    LNFT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
814-03-J permanent casing (66") 400.0    LNFT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
814-04-B crosshole sonic logging (24") 8      EACH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
814-04-J crosshole sonic logging (66") 96      EACH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
                       
 CONTRACTOR TOTAL       21,951,560.40   24,965,495.45   24,986,588.96   26,989,798.80
 
Item Number Item Description Quantity Unit of Measure - 5 -
HIGHWAY SPECIALISTS INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 100,000.00 100,000.00            
202-01 removal of structures & obstructions lump      LUMP 50,000.00 50,000.00            
202-02-A removal of bridges - sta. 487+08.00 to sta.
491+60.00 (23'x 452' concrete deck & bents with
steel i-beams)
1      EACH 100,000.00 100,000.00            
202-02-B-01 removal of concrete box culverts (sta. 467+00; 1-3'x
6'x 54')
1      EACH 3,000.00 3,000.00            
202-02-B-02 removal of concrete box culverts (sta. 482+25; 1-4'x
5'x 100')
1      EACH 6,000.00 6,000.00            
202-02-B-03 removal of concrete box culverts (sta. 535+40; 2-3'x
8'x 52')
1      EACH 5,000.00 5,000.00            
202-02-G removal of surfacing & stabilized base 3,603.8    SQYD 8.00 28,830.40            
202-02-H removal of guard rail 380      LNFT 6.00 2,280.00            
202-02-I removal of pavement structure (pcc pavement with 12"
asphaltic concrete overlay and shoulders)
4,210.3    LNFT 25.00 105,257.50            
202-02-J removal of shoulder surfacing 5,066.0    SQYD 7.00 35,462.00            
202-02-01 removal of headwalls 3      EACH 1,000.00 3,000.00            
202-02-02 removal of 10' x 125' concrete pad (truck scale)(lt.
of sta. 547+00)
1      EACH 1,500.00 1,500.00            
202-02-03 removal of 60' x 70' conc. block commercial building
(lt. of sta. 548+00) (contains non-friable
asbestos)
1      EACH 6,500.00 6,500.00            
202-02-04 removal of sign (rt. of sta. 575+00) 1      EACH 50.00 50.00            
202-02-05 removal of 40' x 50' metal frame commercial building
(lt. of sta. 589+50)
1      EACH 1,500.00 1,500.00            
202-02-06 removal of 10' x 10' masonry commercial building (lt.
of sta. 590+00)
1      EACH 100.00 100.00            
202-02-07 removal of signs (lt. of sta. 590+00) 2      EACH 50.00 100.00            
202-02-08 removal of 45' x 45' concrete slab (lt. of sta. 603+00) 1      EACH 1,000.00 1,000.00            
202-02-09 removal of 32' x 40' barn (lt. of sta. 683+50) 1      EACH 750.00 750.00            
202-02-10 removal of 30' x 62' wood frame residence on piers
(lt. of sta. 686+00)
1      EACH 750.00 750.00            
202-02-11 removal of 30' x 66' concrete slab (lt. of sta. 697+50) 1      EACH 1,200.00 1,200.00            
202-02-12 removal of 30' x 56' brick residence (lt. of sta.
698+50)(contains non-friable asbestos)
1      EACH 6,500.00 6,500.00            
202-02-13 removal of 40' x 45' wood frame residence on piers
(lt. of sta. 733+00) (contains non-friable
asbestos)
1      EACH 6,200.00 6,200.00            
202-02-14 removal of 44' x 46' brick residence (lt. of sta.
734+30)(contains non-friable asbestos)
1      EACH 6,500.00 6,500.00            
202-02-15 removal of 12' x 70' mobile home (lt. of sta. 734+30) 1      EACH 50.00 50.00            
202-02-16 removal of 38' x 44' wood frame residence (lt. 747+00)
(contains non-friable asbestos)
1      EACH 6,000.00 6,000.00            
202-02-17 removal of 28' x 37' wood frame residence on piers
(lt. of 752+00) (contains non-friable asbestos)
1      EACH 6,000.00 6,000.00            
202-02-18 removal of 25' x 34' wood frame residence on piers
(lt. of sta. 758+50) (contains non-friable
asbestos)
1      EACH 6,000.00 6,000.00            
202-02-19 removal of abandoned underground utilities (1" steel
gasline)
790      LNFT 1.50 1,185.00            
202-02-20 removal of abandoned underground utilities (water line) 1,700      LNFT 1.50 2,550.00            
202-05 excavation, disposal and backfilling of contaminated
soil
22      CUYD 250.00 5,500.00            
203-01 general excavation 65,732      CUYD 4.00 262,928.00            
203-02 drainage excavation 1,843      CUYD 7.50 13,822.50            
203-03 muck excavation 2,000      CUYD 15.00 30,000.00            
203-04 embankment 253,856      CUYD 8.50 2,157,776.00            
204-02 temporary hay or straw bales 175      EACH 3.00 525.00            
204-05-A temporary sediment check dam(hay) 76      EACH 75.00 5,700.00            
204-06 temporary silt fencing 2,900      LNFT 3.00 8,700.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
648      CUYD 75.00 48,600.00            
402-01 traffic maintenance aggregate (vehicular measurement) 2,500.0    CUYD 65.00 162,500.00            
509-01 cold planing asphaltic pavement 3,483      SQYD 5.00 17,415.00            
509-02 contractor retained reclaimed asphaltic pavement - 100      CUYD 0.01 - 1.00            
701-01-F cross drain pipe (15" rcp/pcp) 944      LNFT 75.00 70,800.00            
701-01-I cross drain pipe (24" rcp/pcp) 88      LNFT 90.00 7,920.00            
701-02-A cross drain pipe arch (15" equiv. rcpa) 1,262      LNFT 80.00 100,960.00            
701-02-D cross drain pipe arch (24" equiv. rcpa) 168      LNFT 85.00 14,280.00            
701-02-E cross drain pipe arch (30" equiv. rcpa) 192      LNFT 90.00 17,280.00            
701-02-F cross drain pipe arch (36" equiv. rcpa) 364      LNFT 100.00 36,400.00            
701-02-I cross drain pipe arch (54" equiv. rcpa) 524      LNFT 150.00 78,600.00            
701-02-J cross drain pipe arch (60" equiv. rcpa) 612      LNFT 180.00 110,160.00            
701-05-G side drain pipe (18") 196      LNFT 25.00 4,900.00            
701-05-I side drain pipe (24") 188      LNFT 35.00 6,580.00            
701-05-K side drain pipe (30") 410      LNFT 50.00 20,500.00            
701-05-M side drain pipe (36") 282      LNFT 65.00 18,330.00            
701-05-N side drain pipe (42") 196      LNFT 80.00 15,680.00            
701-05-O side drain pipe (48") 74      LNFT 120.00 8,880.00            
701-06-D side drain pipe arch (24" equiv.) 60      LNFT 55.00 3,300.00            
701-06-E side drain pipe arch (30" equiv.) 150      LNFT 65.00 9,750.00            
701-06-F side drain pipe arch (36" equiv.) 112      LNFT 75.00 8,400.00            
701-06-G side drain pipe arch (42" equiv.) 64      LNFT 85.00 5,440.00            
701-06-H side drain pipe arch (48" equiv.) 62      LNFT 135.00 8,370.00            
701-10-I reinforced concrete pipe (extension)(24") 394      LNFT 80.00 31,520.00            
701-10-S reinforced concrete pipe (extension)(72") 320      LNFT 250.00 80,000.00            
701-15 concrete collar 1      EACH 1,000.00 1,000.00            
702-03-A catch basins (cb-01) 25      EACH 2,500.00 62,500.00            
702-03-B catch basins (cb-02) 1      EACH 3,800.00 3,800.00            
702-07-A cross drain safety end (type 1) 1      EACH 1,500.00 1,500.00            
704-03 blocked out guard rail 1,318.8    LNFT 16.50 21,760.20            
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 49.00 9,800.00            
704-11-A guard rail end treatment (flared) 6      EACH 1,800.00 10,800.00            
704-11-B guard rail end treatment (tangent) 2      EACH 2,300.00 4,600.00            
705-02 combination mesh & barbed wire fence 6,569      LNFT 4.50 29,560.50            
705-04 single swinging driveway gates 5      EACH 400.00 2,000.00            
705-06-E-01 chain link fence (7'-4" height-structure mounted) 492      LNFT 11.00 5,412.00            
708-01 right-of-way monument 89      EACH 175.00 15,575.00            
708-02 right-of-way monument witness post 89      EACH 85.00 7,565.00            
711-01-D riprap (55 lb.x 18" thick) 13,758      SQYD 55.00 756,690.00            
711-04 geotextile fabric 13,758      SQYD 2.00 27,516.00            
712-04 flexible revetment 7,699      SQYD 35.00 269,465.00            
713-01 temporary signs & barricades lump      LUMP 750,000.00 750,000.00            
713-07 temporary reflectorized raised pavement markers 831      EACH 3.00 2,493.00            
716-01-A mulch (vegetative) 32.78   ACRE 600.00 19,668.00            
717-01 seeding 3,000      LB 5.50 16,500.00            
718-01 fertilizer 100,000      LB 0.30 30,000.00            
718-02 agricultural lime 200.0    TON 80.00 16,000.00            
720-01-A erosion control system, slope protection (type a) 5,901      SQYD 1.25 7,376.25            
720-01-B erosion control system, slope protection (type b) 1,778      SQYD 1.25 2,222.50            
720-01-C erosion control system, flexible channel liner (type c) 1,244      SQYD 1.75 2,177.00            
722-02 project site laboratory (equipped) 1      EACH 15,000.00 15,000.00            
724-01-C pavement patching (17" minimum thickness) 502      SQYD 150.00 75,300.00            
725-01 temporary detour roads 1,255.4    LNFT 175.00 219,695.00            
726-01 bedding material 1,826.5    CUYD 65.00 118,722.50            
727-01 mobilization lump      LUMP 2,050,000.00 2,050,000.00            
729-16-C object marker assembly (type 3) 8      EACH 72.00 576.00            
729-19-A dead end road installations(type a) 3      EACH 3,000.00 9,000.00            
731-01 nonreflectorized raised pavement markers 105      EACH 15.00 1,575.00            
731-02 reflectorized raised pavement markers 2,492      EACH 5.00 12,460.00            
732-02-A plastic pavement striping (solid line) (4" width) 25.746  MILE 2,650.00 68,226.90            
732-02-C plastic pavement striping (solid line) (8" width) 0.886  MILE 8,000.00 7,088.00            
732-02-E plastic pavement striping (solid line)(24" width) 0.304  MILE 17,000.00 5,168.00            
732-04-A plastic pavement legends & symbols (arrow) 10      EACH 250.00 2,500.00            
732-04-C plastic pavement legends & symbols (only) 10      EACH 250.00 2,500.00            
732-05 removal of existing markings 10.240  MILE 1,000.00 10,240.00            
735-01 mailboxes 35      EACH 25.00 875.00            
735-02 mailbox supports (single) 35      EACH 125.00 4,375.00            
740-01 construction layout lump      LUMP 450,000.00 450,000.00            
744-01 traffic control management lump      LUMP 55,000.00 55,000.00            
805-03 class aa concrete 5,481.38   CUYD 400.00 2,192,552.00            
805-08-D precast-prestressed concrete girders (type iv) 29,317.7    LNFT 150.00 4,397,655.00            
805-11 strip seal joints 664.00   LNFT 120.00 79,680.00            
805-12-Y reinforced concrete box culverts (extension) (2'x 2') 106.0    LNFT 275.00 29,150.00            
805-12-Z reinforced concrete box culverts (extension) (2'x 5') 104.0    LNFT 325.00 33,800.00            
807-06 structural metal work lump      LUMP 10,000.00 10,000.00            
810-01 concrete railing (barrier) 9,086.73   LNFT 35.00 318,035.55            
813-01 concrete approach slabs 1,105.54   SQYD 165.00 182,414.10            
814-02-J test hole (66") 97.4    LNFT 500.00 48,700.00            
S-001 rumble strips (ground-in) 12.3    MILE 1,200.00 14,760.00            
S-002 cleaning existing ditches 325      LNFT 15.00 4,875.00            
S-003 sawcutting existing asphalt pavement (full depth) 19,643      INFT 2.00 39,286.00            
S-004 temporary guard rail 575      LNFT 40.00 23,000.00            
S-005 plugging existing water wells 2      EACH 1,500.00 3,000.00            
S-006 sawcutting existing portland cement concrete pavement
(full depth)
640      INFT 12.00 7,680.00            
S-101 precast-prestressed high performance (hpc) girders
(type iv)
2,241.0    LNFT 200.00 448,200.00            
 SUBTOTAL GENERAL       16,881,849.90            
                       
ALTERNATE A roadway                    
                       
ALTERNATE A1 superpave aspahltic concrete alternate                    
203-05 nonplastic embankment 4,645      CUYD 90.00 418,050.00            
302-01 class ii base course 43,154.0    CUYD 60.00 2,589,240.00            
304-05 lime treatment (type e) 1,194      TON 221.00 263,874.00            
305-01 subgrade layer (12" thick) 168,497      SQYD 6.50 1,095,230.50            
502-01 superpave asphaltic concrete 47,257.6    TON 50.00 2,362,880.00            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
4,865.9    TON 61.00 296,819.90            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.302  MILE 350.00 2,205.70            
713-05-A temporary pavement markings (solid line)(4" width) 12.603  MILE 350.00 4,411.05            
732-03-A plastic pavement striping (broken line)(4" width) 13.469  MILE 1,050.00 14,142.45            
 SUBTOTAL ALT A1       7,046,853.60            
                       
ALTERNATE A2 portland cement concrete pavement alternate                    
203-05 nonplastic embankment 4,645      CUYD 0.00 0.00            
302-01 class ii base course 37,364.9    CUYD 0.00 0.00            
304-05 lime treatment (type e) 1,196.46   TON 0.00 0.00            
305-01 subgrade layer (12" thick) 168,531      SQYD 0.00 0.00            
502-01 superpave asphaltic concrete 13,716.3    TON 0.00 0.00            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
931.7    TON 0.00 0.00            
601-01-G portland cement concrete pavement (8" thick) 97,254.2    SQYD 0.00 0.00            
601-02-G portland cement concrete pavement (8" thick)
(crossovers & turnouts)
11,477.0    SQYD 0.00 0.00            
601-04 portland cement concrete pavement coring 135      EACH 0.00 0.00            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.795  MILE 0.00 0.00            
713-04-B-01 temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable)
5.507  MILE 0.00 0.00            
713-05-A temporary pavement markings (solid line)(4" width) 1.591  MILE 0.00 0.00            
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
11.012  MILE 0.00 0.00            
732-03-A plastic pavement striping (broken line)(4" width) 5.321  MILE 0.00 0.00            
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
8.148  MILE 0.00 0.00            
                       
ALTERNATE B bridge alternates                    
                       
ALTERNATE B1 pile footing alternate                    
802-02 structural excavation for intermediate bents 2,572.7    CUYD 20.00 51,454.00            
804-01-B precast concrete piles (14") 29,454      LNFT 30.00 883,620.00            
804-01-C precast concrete piles (16") 16,764      LNFT 32.00 536,448.00            
804-12 loading permanent piles 2      EACH 800.00 1,600.00            
805-01-D class a concrete (footings) 1,174.08   CUYD 240.00 281,779.20            
805-01-F class a concrete (bents) 2,417.89   CUYD 380.00 918,798.20            
806-01 deformed reinforcing steel 1,956,200      LB 0.60 1,173,720.00            
814-01-J drilled shaft (66") 921.0    LNFT 400.00 368,400.00            
814-03-J permanent casing (66") 240.0    LNFT 250.00 60,000.00            
814-04-J crosshole sonic logging (66") 12      EACH 2,200.00 26,400.00            
 SUBTOTAL ALT B1       4,302,219.40            
                       
ALTERNATE B2 drilled shaft alternate                    
804-01-C precast concrete piles (16") 1,608      LNFT 0.00 0.00            
804-12 loading permanent piles 1      EACH 0.00 0.00            
805-01-F class a concrete (bents) 2,518.94   CUYD 0.00 0.00            
806-01 deformed reinforcing steel 1,861,818      LB 0.00 0.00            
814-01-B drilled shaft (24") 272.8    LNFT 0.00 0.00            
814-01-J drilled shaft (66") 7,756.6    LNFT 0.00 0.00            
814-03-B permanent casing (24") 160.0    LNFT 0.00 0.00            
814-03-J permanent casing (66") 400.0    LNFT 0.00 0.00            
814-04-B crosshole sonic logging (24") 8      EACH 0.00 0.00            
814-04-J crosshole sonic logging (66") 96      EACH 0.00 0.00            
                       
 CONTRACTOR TOTAL       28,230,922.90            