Lead Project: 012-06-0048
Parish: ALLEN, CALCASIEU, JEFF DAVIS
Routes: US 190, LA 101
Description: E.END CALCASIEU RIVER BR-ACADIA PH LINE&LA14-JEFF DAVIS P.L.
Type Const: asphaltic surface treatment and related work.
 
RankLicenseBidderAmount
101552 W. R. CORE, LLC. $453,052.90
214422 T. L. WALLACE CONSTRUCTION, INC. $463,379.40
330339 MISSOURI PETROLEUM PRODUCTS CO. LLC $489,948.02
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. R. CORE, LLC.
- 2 -
T. L. WALLACE CONSTRUCTION, INC.
- 3 -
MISSOURI PETROLEUM PRODUCTS CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
507-01-A asphaltic surface treatment (1 application) 280,074      SQYD 1.30 364,096.20 1.30 364,096.20 1.35 378,099.90    
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 16,000.00 16,000.00 5,000.00 5,000.00    
713-07-A temporary reflectorized raised pavement markers (tabs) 2,694      EACH 1.25 3,367.50 1.00 2,694.00 0.95 2,559.30    
727-01 mobilization lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00 34,000.00 34,000.00    
731-02 reflectorized raised pavement markers 2,694      EACH 5.00 13,470.00 5.00 13,470.00 4.90 13,200.60    
732-02-A-03 plastic pavement striping (solid line)(4" width)
(40 mil thickness)
37.575  MILE 1,200.00 45,090.00 1,200.00 45,090.00 1,220.00 45,841.50    
732-03-A-03 plastic pavement striping (broken line)(4" width)
(40 mil thickness)
17.573  MILE 400.00 7,029.20 400.00 7,029.20 640.00 11,246.72    
                       
 CONTRACTOR TOTAL       453,052.90   463,379.40   489,948.02    