Lead Project: 003-08-0022
Parish: JEFF DAVIS
Routes: US 90
Description: US 90: C.S.L.M. 1.43 - C.S.L.M. 2.62
Type Const: superpave asphaltic concrete, aggregate surface course, temp signs and barraicades,
temp pavement markings, pavement patc hing, refl raised pavement markers, and related work
 
RankLicenseBidderAmount
100183 R. E. HEIDT CONSTRUCTION CO., INC. $159,197.99
234356 PRAIRIE CONTRACTORS INC. $173,667.76
314096 BESSETTE DEVELOPMENT CORP. $176,351.51
 
Item Number Item Description Quantity Unit of Measure - 1 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 2 -
PRAIRIE CONTRACTORS INC.
- 3 -
BESSETTE DEVELOPMENT CORP.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
465      CUYD 53.00 24,645.00 60.00 27,900.00 53.50 24,877.50    
502-01 superpave asphaltic concrete 1,843.1    TON 53.50 98,605.85 61.00 112,429.10 60.90 112,244.79    
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 4,500.00 4,500.00 18,600.00 18,600.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
1.190  MILE 255.00 303.45 500.00 595.00 832.75 990.97    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.190  MILE 266.00 316.54 1.00 1.19 266.25 316.83    
713-05-A temporary pavement markings (solid line)(4" width) 2.475  MILE 530.00 1,311.75 1.00 2.47 533.00 1,319.17    
724-01-B pavement patching (12" minimum thickness) 75      SQYD 85.00 6,375.00 105.00 7,875.00 52.75 3,956.25    
727-01 mobilization lump      LUMP 15,000.00 15,000.00 12,000.00 12,000.00 6,550.00 6,550.00    
731-02 reflectorized raised pavement markers 158      EACH 5.55 876.90 6.25 987.50 5.75 908.50    
732-02-A plastic pavement striping (solid line) (4" width) 2.475  MILE 2,300.00 5,692.50 2,500.00 6,187.50 2,245.00 5,556.37    
732-03-A plastic pavement striping (broken line)(4" width) 1.190  MILE 900.00 1,071.00 1,000.00 1,190.00 866.50 1,031.13    
                       
 CONTRACTOR TOTAL       159,197.99   173,667.76   176,351.51    