| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - PRAIRIE CONTRACTORS INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of rip rap and unfinished concrete revetment
|
lump |
LUMP |
1,500.00 |
1,500.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-J |
removal of surfacing
|
635.0 |
SQYD |
9.00 |
5,715.00 |
15.00 |
9,525.00 |
20.00 |
12,700.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
100   |
CUYD |
26.00 |
2,600.00 |
90.00 |
9,000.00 |
18.00 |
1,800.00 |
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
3,055   |
CUYD |
20.00 |
61,100.00 |
17.00 |
51,935.00 |
18.00 |
54,990.00 |
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
19,685   |
SQYD |
7.50 |
147,637.50 |
15.00 |
295,275.00 |
16.50 |
324,802.50 |
|
|
| 303-02 |
removal of existing patches
|
500   |
SQYD |
20.00 |
10,000.00 |
25.00 |
12,500.00 |
10.00 |
5,000.00 |
|
|
| 304-01 |
lime
|
68.28 |
TON |
140.00 |
9,559.20 |
175.00 |
11,949.00 |
228.00 |
15,567.84 |
|
|
| 304-02-B |
lime treatment (type b) (8 1/2" thick)
|
10,200   |
SQYD |
1.50 |
15,300.00 |
11.00 |
112,200.00 |
13.00 |
132,600.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
136   |
CUYD |
33.00 |
4,488.00 |
100.00 |
13,600.00 |
80.00 |
10,880.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
3,307.0 |
TON |
56.00 |
185,192.00 |
60.00 |
198,420.00 |
58.00 |
191,806.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
60.0 |
TON |
100.00 |
6,000.00 |
255.00 |
15,300.00 |
100.00 |
6,000.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
22,755   |
SQYD |
1.75 |
39,821.25 |
1.75 |
39,821.25 |
3.00 |
68,265.00 |
|
|
| 602-05-G |
full depth patching of jointed concrete pavement (8"
thick) |
88.5 |
SQYD |
92.00 |
8,142.00 |
150.00 |
13,275.00 |
150.00 |
13,275.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
56   |
LNFT |
90.00 |
5,040.00 |
110.00 |
6,160.00 |
110.00 |
6,160.00 |
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
1,100.00 |
1,100.00 |
1,000.00 |
1,000.00 |
1,300.00 |
1,300.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
3,000.00 |
3,000.00 |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
|
|
| 702-04-A |
adjusting manholes
|
3   |
EACH |
500.00 |
1,500.00 |
1,000.00 |
3,000.00 |
4,000.00 |
12,000.00 |
|
|
| 712-04 |
flexible revetment
|
23   |
SQYD |
50.00 |
1,150.00 |
90.00 |
2,070.00 |
200.00 |
4,600.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
158   |
LNFT |
0.70 |
110.60 |
4.00 |
632.00 |
1.00 |
158.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.111 |
MILE |
320.00 |
1,315.52 |
176.00 |
723.53 |
400.00 |
1,644.40 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.132 |
MILE |
350.00 |
396.20 |
1,000.00 |
1,132.00 |
1.00 |
1.13 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.695 |
MILE |
470.00 |
6,906.65 |
560.00 |
8,229.20 |
1.00 |
14.69 |
|
|
| 717-01 |
seeding
|
27   |
LB |
9.00 |
243.00 |
10.00 |
270.00 |
20.00 |
540.00 |
|
|
| 718-01 |
fertilizer
|
600   |
LB |
1.00 |
600.00 |
0.40 |
240.00 |
1.00 |
600.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
120   |
SQYD |
2.00 |
240.00 |
2.00 |
240.00 |
5.00 |
600.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
100   |
SQYD |
80.00 |
8,000.00 |
75.00 |
7,500.00 |
50.00 |
5,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
100.00 |
50,000.00 |
90.00 |
45,000.00 |
100.00 |
50,000.00 |
|
|
| 726-01 |
bedding material
|
6.8 |
CUYD |
90.00 |
612.00 |
125.00 |
850.00 |
200.00 |
1,360.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
15,000.00 |
15,000.00 |
90,000.00 |
90,000.00 |
86,000.00 |
86,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
276   |
EACH |
6.00 |
1,656.00 |
6.50 |
1,794.00 |
10.00 |
2,760.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
50   |
LNFT |
1.20 |
60.00 |
13.00 |
650.00 |
5.00 |
250.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
79   |
LNFT |
3.50 |
276.50 |
12.00 |
948.00 |
6.00 |
474.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.348 |
MILE |
2,000.00 |
14,696.00 |
2,500.00 |
18,370.00 |
2,200.00 |
16,165.60 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.566 |
MILE |
800.00 |
452.80 |
1,250.00 |
707.50 |
1,000.00 |
566.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
180.00 |
360.00 |
525.00 |
1,050.00 |
500.00 |
1,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
|
|
| S-001 |
cleaning grated cross drains
|
84   |
LNFT |
17.00 |
1,428.00 |
30.00 |
2,520.00 |
75.00 |
6,300.00 |
|
|
| S-002 |
slotted drain
|
40   |
LNFT |
280.00 |
11,200.00 |
150.00 |
6,000.00 |
800.00 |
32,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
641,398.22 |
|
1,055,386.48 |
|
1,112,180.16 |
|
|
|