Letting of 4/27/2005 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 801-17-0005
Parish: ACADIA, LAFAYETTE
Routes: LA 1119, LA 723
Description: JCT LA 92 TO END OF CONTROL AND JCT LA 724 TO JCT LA 93
Type Const: minor overlay
 
RankLicenseBidderAmount
100183 R. E. HEIDT CONSTRUCTION CO., INC. $320,100.65
234356 PRAIRIE CONTRACTORS INC. $352,389.53
304089 H & S CONSTRUCTION CO., INC. $372,225.03
 
Item Number Item Description Quantity Unit of Measure - 1 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 2 -
PRAIRIE CONTRACTORS INC.
- 3 -
H & S CONSTRUCTION CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
994      CUYD 45.00 44,730.00 49.00 48,706.00 58.00 57,652.00    
502-01 superpave asphaltic concrete 3,262.1    TON 53.65 175,011.66 60.00 195,726.00 64.00 208,774.40    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
250.7    TON 95.00 23,816.50 95.00 23,816.50 66.00 16,546.20    
713-01 temporary signs & barricades lump      LUMP 5,200.00 5,200.00 8,000.00 8,000.00 14,000.00 14,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
2.418  MILE 310.00 749.58 350.00 846.30 300.00 725.40    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.973  MILE 325.00 641.22 1.00 1.97 350.00 690.55    
713-05-A temporary pavement markings (solid line)(4" width) 1.763  MILE 650.00 1,145.95 1.00 1.76 705.00 1,242.91    
724-01-B pavement patching (12" minimum thickness) 379      SQYD 60.00 22,740.00 60.00 22,740.00 52.00 19,708.00    
727-01 mobilization lump      LUMP 20,000.00 20,000.00 16,000.00 16,000.00 30,000.00 30,000.00    
731-02 reflectorized raised pavement markers 322      EACH 5.20 1,674.40 6.00 1,932.00 5.65 1,819.30    
732-02-A plastic pavement striping (solid line) (4" width) 1.763  MILE 1,900.00 3,349.70 6,500.00 11,459.50 2,050.00 3,614.15    
732-03-A plastic pavement striping (broken line)(4" width) 1.973  MILE 680.00 1,341.64 1,500.00 2,959.50 736.00 1,452.12    
740-01 construction layout lump      LUMP 3,200.00 3,200.00 200.00 200.00 6,000.00 6,000.00    
S-001 surface preparation lump      LUMP 16,500.00 16,500.00 20,000.00 20,000.00 10,000.00 10,000.00    
                       
 CONTRACTOR TOTAL       320,100.65   352,389.53   372,225.03    