Letting of 4/27/2005 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 744-15-0008
Parish: CONCORDIA
Routes:
Description: VIDALIA SIDEWALKS
Type Const: clearing & grubbing, grading, drainage structures, concrete sidewalks, and related
work.
 
RankLicenseBidderAmount
108999 NOTTINGHAM CONSTRUCTION CO. INC. $446,382.00
241051 THE MECO GROUP INC. $463,534.00
323029 TRIAD BUILDERS OF RUSTON INC $465,111.00
438516 DOZER, INC. $604,195.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
NOTTINGHAM CONSTRUCTION CO. INC.
- 2 -
THE MECO GROUP INC.
- 3 -
TRIAD BUILDERS OF RUSTON INC
- 4 -
DOZER, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 2,000.00 2,000.00 6,000.00 6,000.00 2,300.00 2,300.00 15,000.00 15,000.00
202-01 removal of structures & obstructions lump      LUMP 2,750.00 2,750.00 4,000.00 4,000.00 3,400.00 3,400.00 15,000.00 15,000.00
202-03-A relocation of wood fence 40      LF 25.00 1,000.00 10.00 400.00 57.00 2,280.00 25.00 1,000.00
202-03-B relocation of chain link fence 19      LF 42.00 798.00 10.00 190.00 57.00 1,083.00 25.00 475.00
203-06 excavation & embankment lump      LUMP 18,900.00 18,900.00 14,000.00 14,000.00 9,100.00 9,100.00 7,800.00 7,800.00
203-08 borrow (vehicular measurement) 50      CUYD 59.00 2,950.00 11.00 550.00 17.00 850.00 25.00 1,250.00
701-01-E cross drain pipe (12" cmp) 20      LNFT 40.00 800.00 30.00 600.00 23.00 460.00 50.00 1,000.00
701-07-B yard drain pipe (6" pvc) 6      LNFT 90.00 540.00 25.00 150.00 23.00 138.00 25.00 150.00
702-04-D adjusting monitoring well cover 2      EACH 475.00 950.00 200.00 400.00 600.00 1,200.00 1,000.00 2,000.00
702-04-E adjusting gas valve box 1      EACH 750.00 750.00 400.00 400.00 600.00 600.00 1,000.00 1,000.00
706-01-A concrete walk (4" thick) 10,400.0    SQYD 28.20 293,280.00 33.00 343,200.00 34.00 353,600.00 38.00 395,200.00
706-01-C concrete walk (6" thick) 800.0    SQYD 55.70 44,560.00 43.00 34,400.00 51.00 40,800.00 47.00 37,600.00
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 7,000.00 7,000.00 9,600.00 9,600.00 15,000.00 15,000.00
717-01 seeding 144      LB 8.50 1,224.00 9.00 1,296.00 12.00 1,728.00 25.00 3,600.00
718-01 fertilizer 4,120      LB 0.25 1,030.00 0.40 1,648.00 0.60 2,472.00 1.00 4,120.00
727-01 mobilization lump      LUMP 44,600.00 44,600.00 45,000.00 45,000.00 32,000.00 32,000.00 87,000.00 87,000.00
740-01 construction layout lump      LUMP 4,500.00 4,500.00 4,000.00 4,000.00 2,900.00 2,900.00 16,000.00 16,000.00
741-11 adjusting water valve and meter box 1      EACH 750.00 750.00 300.00 300.00 600.00 600.00 1,000.00 1,000.00
                       
 CONTRACTOR TOTAL       446,382.00   463,534.00   465,111.00   604,195.00