Letting of 4/27/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 742-07-0031
Parish: ORLEANS
Routes:
Description: MORRISON ROAD IMPROVEMENTS (GANNON ROAD TO VINCENT ROAD)
Type Const: grading, drainage structures, sanitary sewer system, class ii base course, portland
cement concrete pavement, and related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC. $1,633,633.20
224901 HARD ROCK CONSTRUCTION CO. $1,748,219.30
336961 CYCLE CONSTRUCTION CO. L.L.C. $1,775,848.00
435678 BEVERLY CONSTRUCTION CO. LLC $1,845,963.67
502074 CIRCLE, INC. $1,879,999.99
612069 B & K CONSTRUCTION CO. $1,905,928.42
702179 BOH BROS. CONSTRUCTION CO., LLC. $2,068,093.15
808579 RONALD ADAMS CONTRACTOR, INC. $2,150,170.65
940038 COMMAND CONSTRUCTION LLC $2,197,389.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
HARD ROCK CONSTRUCTION CO.
- 3 -
CYCLE CONSTRUCTION CO. L.L.C.
- 4 -
BEVERLY CONSTRUCTION CO. LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 8,500.00 8,500.00 14,000.00 14,000.00
202-01 removal of structures & obstructions lump      LUMP 8,000.00 8,000.00 25,000.00 25,000.00 600.00 600.00 23,000.00 23,000.00
202-02-C removal of portland cement concrete pavement 1,003      SQYD 8.00 8,024.00 15.00 15,045.00 6.00 6,018.00 7.25 7,271.75
202-02-D removal of concrete walks & drives 676      SQYD 8.00 5,408.00 10.00 6,760.00 7.00 4,732.00 7.25 4,901.00
202-02-F removal of concrete combination curb & gutter 1,353.4    LNFT 5.00 6,767.00 2.00 2,706.80 2.00 2,706.80 8.30 11,233.22
202-02-G removal of surfacing & stabilized base 729.0    SQYD 5.00 3,645.00 10.00 7,290.00 2.00 1,458.00 7.40 5,394.60
202-02-H removal of guard rail 78      LNFT 4.00 312.00 4.00 312.00 5.00 390.00 4.40 343.20
202-02-I removal of barricades 4      EACH 200.00 800.00 400.00 1,600.00 350.00 1,400.00 370.00 1,480.00
203-01 general excavation 3,848      CUYD 5.00 19,240.00 5.00 19,240.00 7.50 28,860.00 4.50 17,316.00
203-04 embankment 5,149      CUYD 5.00 25,745.00 5.00 25,745.00 14.00 72,086.00 11.75 60,500.75
203-08 borrow (vehicular measurement) 2,846      CUYD 1.00 2,846.00 FREE FREE 12.00 34,152.00 10.00 28,460.00
204-02 temporary hay or straw bales 200      EACH 7.00 1,400.00 7.00 1,400.00 7.00 1,400.00 10.00 2,000.00
204-06 temporary silt fencing 4,000      LNFT 1.40 5,600.00 1.00 4,000.00 1.50 6,000.00 1.56 6,240.00
302-02-A class ii base course (8" thick) 10,079.0    SQYD 13.00 131,027.00 12.00 120,948.00 12.50 125,987.50 15.12 152,394.48
302-02-B class ii base course (4" thick) 1,922.7    SQYD 10.00 19,227.00 20.00 38,454.00 8.00 15,381.60 13.20 25,379.64
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 20.00 1,000.00 50.00 2,500.00 40.00 2,000.00 54.00 2,700.00
601-01-G portland cement concrete pavement (8" thick) 9,396.4    SQYD 38.00 357,063.20 38.00 357,063.20 47.00 441,630.80 39.50 371,157.80
704-03 blocked out guard rail 115.0    LNFT 14.00 1,610.00 12.00 1,380.00 14.00 1,610.00 14.00 1,610.00
704-11-A guard rail end treatment (flared) 2      EACH 1,600.00 3,200.00 1,500.00 3,000.00 1,600.00 3,200.00 1,600.00 3,200.00
705-09 rebuilt fence 18      LNFT 25.00 450.00 25.00 450.00 23.00 414.00 20.00 360.00
706-01-A concrete walk (4" thick) 1,634.9    SQYD 40.00 65,396.00 35.00 57,221.50 34.00 55,586.60 43.00 70,300.70
706-02-C concrete drive(6" thick) 200.3    SQYD 47.00 9,414.10 50.00 10,015.00 48.00 9,614.40 52.00 10,415.60
706-02-D concrete drive(8" thick) 87.5    SQYD 50.00 4,375.00 55.00 4,812.50 60.00 5,250.00 62.00 5,425.00
707-01 concrete curb 6,002.4    LNFT 6.00 36,014.40 5.00 30,012.00 7.50 45,018.00 8.50 51,020.40
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 25,000.00 25,000.00 18,000.00 18,000.00 20,600.00 20,600.00
717-01 seeding 150      LB 9.00 1,350.00 15.00 2,250.00 10.00 1,500.00 9.44 1,416.00
718-01 fertilizer 2,475      LB 0.50 1,237.50 1.00 2,475.00 0.50 1,237.50 0.54 1,336.50
722-01 project site laboratory 1      EACH 10,000.00 10,000.00 12,000.00 12,000.00 6,000.00 6,000.00 16,000.00 16,000.00
727-01 mobilization lump      LUMP 80,000.00 80,000.00 154,000.00 154,000.00 73,000.00 73,000.00 24,000.00 24,000.00
729-01 sign (type a) 49.6    SQFT 22.00 1,091.20 20.00 992.00 23.00 1,140.80 22.00 1,091.20
729-19-B dead end road installations(type b) 5      EACH 800.00 4,000.00 800.00 4,000.00 900.00 4,500.00 1,200.00 6,000.00
729-21 u-channel post 9      EACH 130.00 1,170.00 125.00 1,125.00 97.00 873.00 138.00 1,242.00
731-02 reflectorized raised pavement markers 63      EACH 5.00 315.00 5.00 315.00 6.00 378.00 5.50 346.50
732-01-A plastic pavement striping (4" width) 5,848      LNFT 0.40 2,339.20 0.40 2,339.20 0.50 2,924.00 0.45 2,631.60
732-01-B plastic pavement striping (6" width) 553      LNFT 0.60 331.80 0.60 331.80 1.00 553.00 0.66 364.98
732-01-D plastic pavement striping (12" width) 118      LNFT 1.35 159.30 1.35 159.30 1.50 177.00 1.50 177.00
740-01 construction layout lump      LUMP 20,000.00 20,000.00 30,000.00 30,000.00 22,000.00 22,000.00 21,000.00 21,000.00
S-001 existing site conditions survey lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00 6,000.00 6,000.00 4,300.00 4,300.00
S-002 geogrid 10,079      SQYD 2.50 25,197.50 3.00 30,237.00 3.00 30,237.00 2.75 27,717.25
S-003 saw cut concrete or asphalt (1" depth) 3,982      LNFT 1.00 3,982.00 1.00 3,982.00 1.50 5,973.00 1.10 4,380.20
S-004 slope paving at drain outlets 8      EACH 300.00 2,400.00 500.00 4,000.00 600.00 4,800.00 900.00 7,200.00
S-005 storm drain pipe (15" rcp) (d-12) 509      LNFT 55.00 27,995.00 52.00 26,468.00 56.00 28,504.00 47.00 23,923.00
S-006 storm drain pipe (18" rcp) (d-12) 152      LNFT 75.00 11,400.00 56.00 8,512.00 60.00 9,120.00 69.00 10,488.00
S-007 storm drain pipe (24" rcp) (d-12) 111      LNFT 90.00 9,990.00 86.00 9,546.00 81.00 8,991.00 90.00 9,990.00
S-008 storm drain pipe (30" rcp) (d-12) 8      LNFT 400.00 3,200.00 411.00 3,288.00 370.00 2,960.00 248.00 1,984.00
S-009 storm drain pipe (36" rcp) (d-12) 9      LNFT 450.00 4,050.00 376.00 3,384.00 372.00 3,348.00 325.00 2,925.00
S-010 storm drain pipe (30" x 18" rcpa) (d-13) 305      LNFT 90.00 27,450.00 79.00 24,095.00 86.00 26,230.00 96.40 29,402.00
S-011 drop inlet catch basin (d-8) 3      EACH 2,300.00 6,900.00 1,800.00 5,400.00 2,500.00 7,500.00 2,450.00 7,350.00
S-012 double mountable catch basin (d-11) 1      EACH 4,100.00 4,100.00 3,300.00 3,300.00 5,000.00 5,000.00 3,750.00 3,750.00
S-013 single vertical catch basin #1 (d-3) 7      EACH 2,600.00 18,200.00 2,100.00 14,700.00 2,400.00 16,800.00 2,300.00 16,100.00
S-014 double vertical catch basin #1 (d-4) 6      EACH 5,000.00 30,000.00 2,600.00 15,600.00 5,000.00 30,000.00 3,100.00 18,600.00
S-015 water valve manhole #1 (d-1) 5      EACH 1,500.00 7,500.00 2,000.00 10,000.00 2,700.00 13,500.00 2,408.00 12,040.00
S-016 drain manhole #2 (d-1) 17.8    FTHT 500.00 8,900.00 350.00 6,230.00 400.00 7,120.00 315.00 5,607.00
S-017 drain manhole #3 (d-1) 9.9    FTHT 540.00 5,346.00 450.00 4,455.00 450.00 4,455.00 315.00 3,118.50
S-018 adjust manhole (d-1) 14      EACH 500.00 7,000.00 300.00 4,200.00 400.00 5,600.00 744.00 10,416.00
S-019 adjust catch basin (d-3) 5      EACH 100.00 500.00 700.00 3,500.00 500.00 2,500.00 725.00 3,625.00
S-020 8" sewer main (6.1 to 8.0' depth) (d-14) 176      LNFT 90.00 15,840.00 80.00 14,080.00 75.00 13,200.00 148.00 26,048.00
S-021 8" sewer main (8.1 to 10.0'depth) (d-14) 462      LNFT 100.00 46,200.00 90.00 41,580.00 90.00 41,580.00 150.00 69,300.00
S-022 10"sewer main (8.1 to 10.0'depth) (d-14) 181      LNFT 110.00 19,910.00 110.00 19,910.00 111.00 20,091.00 152.00 27,512.00
S-023 10"sewer main (10.1 to 12.0' depth) (d-14) 694      LNFT 140.00 97,160.00 115.00 79,810.00 113.00 78,422.00 172.00 119,368.00
S-024 15"sewer main (10.1 to 12.0' depth) (d-14) 169      LNFT 150.00 25,350.00 200.00 33,800.00 142.00 23,998.00 181.00 30,589.00
S-025 sewer manhole #1 (d-1) 105.7    FTHT 450.00 47,565.00 300.00 31,710.00 400.00 42,280.00 244.00 25,790.80
S-026 16" force main 47      LNFT 400.00 18,800.00 500.00 23,500.00 280.00 13,160.00 116.00 5,452.00
S-027 20" force main 1,261      LNFT 100.00 126,100.00 110.00 138,710.00 102.00 128,622.00 117.00 147,537.00
S-028 24" force main 1,342      LNFT 120.00 161,040.00 140.00 187,880.00 134.00 179,828.00 157.00 210,694.00
S-029 replace sewer manhole casting (d-7) 5      EACH 250.00 1,250.00 500.00 2,500.00 450.00 2,250.00 525.00 2,625.00
S-030 6" sewer house connection (d-15) 5      EACH 100.00 500.00 500.00 2,500.00 900.00 4,500.00 900.00 4,500.00
S-031 street name sign on existing post (std 11) 5      EACH 170.00 850.00 200.00 1,000.00 400.00 2,000.00 178.00 890.00
S-032 street name sign on new post (std 11) 2      EACH 200.00 400.00 200.00 400.00 500.00 1,000.00 216.00 432.00
                       
 CONTRACTOR TOTAL       1,633,633.20   1,748,219.30   1,775,848.00   1,845,963.67
 
Item Number Item Description Quantity Unit of Measure - 5 -
CIRCLE, INC.
- 6 -
B & K CONSTRUCTION CO.
- 7 -
BOH BROS. CONSTRUCTION CO., LLC.
- 8 -
RONALD ADAMS CONTRACTOR, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 4,000.00 4,000.00 6,300.00 6,300.00 5,000.00 5,000.00 32,000.00 32,000.00
202-01 removal of structures & obstructions lump      LUMP 5,100.00 5,100.00 33,000.00 33,000.00 15,000.00 15,000.00 15,000.00 15,000.00
202-02-C removal of portland cement concrete pavement 1,003      SQYD 6.20 6,218.60 7.00 7,021.00 7.00 7,021.00 6.50 6,519.50
202-02-D removal of concrete walks & drives 676      SQYD 5.60 3,785.60 6.50 4,394.00 7.00 4,732.00 8.50 5,746.00
202-02-F removal of concrete combination curb & gutter 1,353.4    LNFT 2.80 3,789.52 2.50 3,383.50 4.00 5,413.60 4.50 6,090.30
202-02-G removal of surfacing & stabilized base 729.0    SQYD 2.70 1,968.30 6.50 4,738.50 7.00 5,103.00 5.00 3,645.00
202-02-H removal of guard rail 78      LNFT 4.00 312.00 3.25 253.50 4.00 312.00 5.00 390.00
202-02-I removal of barricades 4      EACH 101.00 404.00 110.00 440.00 500.00 2,000.00 300.00 1,200.00
203-01 general excavation 3,848      CUYD 4.30 16,546.40 6.00 23,088.00 7.00 26,936.00 8.00 30,784.00
203-04 embankment 5,149      CUYD 4.00 20,596.00 9.00 46,341.00 8.00 41,192.00 7.50 38,617.50
203-08 borrow (vehicular measurement) 2,846      CUYD 15.00 42,690.00 11.00 31,306.00 10.00 28,460.00 8.00 22,768.00
204-02 temporary hay or straw bales 200      EACH 7.00 1,400.00 5.00 1,000.00 6.00 1,200.00 6.00 1,200.00
204-06 temporary silt fencing 4,000      LNFT 1.50 6,000.00 2.00 8,000.00 1.50 6,000.00 1.50 6,000.00
302-02-A class ii base course (8" thick) 10,079.0    SQYD 15.00 151,185.00 11.00 110,869.00 14.00 141,106.00 12.50 125,987.50
302-02-B class ii base course (4" thick) 1,922.7    SQYD 13.00 24,995.10 5.00 9,613.50 11.00 21,149.70 12.50 24,033.75
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 36.50 1,825.00 26.00 1,300.00 28.00 1,400.00 30.00 1,500.00
601-01-G portland cement concrete pavement (8" thick) 9,396.4    SQYD 41.00 385,252.40 55.30 519,620.92 45.00 422,838.00 40.00 375,856.00
704-03 blocked out guard rail 115.0    LNFT 15.00 1,725.00 19.00 2,185.00 13.00 1,495.00 14.00 1,610.00
704-11-A guard rail end treatment (flared) 2      EACH 1,700.00 3,400.00 2,000.00 4,000.00 1,500.00 3,000.00 1,600.00 3,200.00
705-09 rebuilt fence 18      LNFT 95.00 1,710.00 10.00 180.00 55.00 990.00 25.00 450.00
706-01-A concrete walk (4" thick) 1,634.9    SQYD 34.00 55,586.60 34.00 55,586.60 38.00 62,126.20 30.00 49,047.00
706-02-C concrete drive(6" thick) 200.3    SQYD 42.00 8,412.60 38.00 7,611.40 42.00 8,412.60 36.00 7,210.80
706-02-D concrete drive(8" thick) 87.5    SQYD 48.00 4,200.00 44.00 3,850.00 45.00 3,937.50 45.00 3,937.50
707-01 concrete curb 6,002.4    LNFT 9.50 57,022.80 19.00 114,045.60 6.00 36,014.40 5.50 33,013.20
713-01 temporary signs & barricades lump      LUMP 29,300.00 29,300.00 35,000.00 35,000.00 25,000.00 25,000.00 24,000.00 24,000.00
717-01 seeding 150      LB 10.00 1,500.00 12.00 1,800.00 9.00 1,350.00 9.00 1,350.00
718-01 fertilizer 2,475      LB 0.60 1,485.00 0.50 1,237.50 0.50 1,237.50 0.35 866.25
722-01 project site laboratory 1      EACH 4,900.00 4,900.00 8,000.00 8,000.00 7,000.00 7,000.00 5,000.00 5,000.00
727-01 mobilization lump      LUMP 33,000.00 33,000.00 33,000.00 33,000.00 101,000.00 101,000.00 72,000.00 72,000.00
729-01 sign (type a) 49.6    SQFT 26.00 1,289.60 21.00 1,041.60 21.00 1,041.60 22.00 1,091.20
729-19-B dead end road installations(type b) 5      EACH 950.00 4,750.00 1,325.00 6,625.00 1,200.00 6,000.00 900.00 4,500.00
729-21 u-channel post 9      EACH 148.50 1,336.50 50.00 450.00 130.00 1,170.00 135.00 1,215.00
731-02 reflectorized raised pavement markers 63      EACH 6.00 378.00 5.00 315.00 5.50 346.50 5.00 315.00
732-01-A plastic pavement striping (4" width) 5,848      LNFT 0.50 2,924.00 0.80 4,678.40 0.45 2,631.60 0.45 2,631.60
732-01-B plastic pavement striping (6" width) 553      LNFT 0.70 387.10 3.00 1,659.00 0.65 359.45 0.65 359.45
732-01-D plastic pavement striping (12" width) 118      LNFT 2.00 236.00 4.50 531.00 1.50 177.00 1.50 177.00
740-01 construction layout lump      LUMP 32,000.00 32,000.00 51,000.00 51,000.00 25,000.00 25,000.00 50,000.00 50,000.00
S-001 existing site conditions survey lump      LUMP 3,519.92 3,519.92 8,125.00 8,125.00 5,000.00 5,000.00 4,000.00 4,000.00
S-002 geogrid 10,079      SQYD 2.50 25,197.50 2.00 20,158.00 3.00 30,237.00 2.90 29,229.10
S-003 saw cut concrete or asphalt (1" depth) 3,982      LNFT 0.55 2,190.10 1.50 5,973.00 1.25 4,977.50 1.25 4,977.50
S-004 slope paving at drain outlets 8      EACH 1,400.00 11,200.00 245.00 1,960.00 1,000.00 8,000.00 600.00 4,800.00
S-005 storm drain pipe (15" rcp) (d-12) 509      LNFT 42.00 21,378.00 55.00 27,995.00 70.00 35,630.00 55.00 27,995.00
S-006 storm drain pipe (18" rcp) (d-12) 152      LNFT 52.00 7,904.00 71.00 10,792.00 80.00 12,160.00 83.00 12,616.00
S-007 storm drain pipe (24" rcp) (d-12) 111      LNFT 73.25 8,130.75 98.00 10,878.00 100.00 11,100.00 114.00 12,654.00
S-008 storm drain pipe (30" rcp) (d-12) 8      LNFT 116.50 932.00 170.00 1,360.00 300.00 2,400.00 300.00 2,400.00
S-009 storm drain pipe (36" rcp) (d-12) 9      LNFT 196.00 1,764.00 221.00 1,989.00 400.00 3,600.00 300.00 2,700.00
S-010 storm drain pipe (30" x 18" rcpa) (d-13) 305      LNFT 76.50 23,332.50 120.00 36,600.00 120.00 36,600.00 112.00 34,160.00
S-011 drop inlet catch basin (d-8) 3      EACH 2,550.00 7,650.00 2,125.00 6,375.00 2,800.00 8,400.00 1,700.00 5,100.00
S-012 double mountable catch basin (d-11) 1      EACH 5,575.00 5,575.00 2,950.00 2,950.00 5,400.00 5,400.00 6,000.00 6,000.00
S-013 single vertical catch basin #1 (d-3) 7      EACH 3,190.00 22,330.00 2,385.00 16,695.00 3,700.00 25,900.00 3,300.00 23,100.00
S-014 double vertical catch basin #1 (d-4) 6      EACH 10,800.00 64,800.00 4,298.00 25,788.00 6,100.00 36,600.00 7,000.00 42,000.00
S-015 water valve manhole #1 (d-1) 5      EACH 3,360.00 16,800.00 4,207.00 21,035.00 2,200.00 11,000.00 2,900.00 14,500.00
S-016 drain manhole #2 (d-1) 17.8    FTHT 340.00 6,052.00 513.00 9,131.40 480.00 8,544.00 440.00 7,832.00
S-017 drain manhole #3 (d-1) 9.9    FTHT 344.00 3,405.60 538.00 5,326.20 500.00 4,950.00 440.00 4,356.00
S-018 adjust manhole (d-1) 14      EACH 1,475.00 20,650.00 200.00 2,800.00 350.00 4,900.00 600.00 8,400.00
S-019 adjust catch basin (d-3) 5      EACH 950.00 4,750.00 698.00 3,490.00 350.00 1,750.00 1,900.00 9,500.00
S-020 8" sewer main (6.1 to 8.0' depth) (d-14) 176      LNFT 93.00 16,368.00 87.00 15,312.00 93.00 16,368.00 180.00 31,680.00
S-021 8" sewer main (8.1 to 10.0'depth) (d-14) 462      LNFT 104.00 48,048.00 114.00 52,668.00 116.00 53,592.00 200.00 92,400.00
S-022 10"sewer main (8.1 to 10.0'depth) (d-14) 181      LNFT 108.00 19,548.00 117.00 21,177.00 124.00 22,444.00 210.00 38,010.00
S-023 10"sewer main (10.1 to 12.0' depth) (d-14) 694      LNFT 125.00 86,750.00 141.00 97,854.00 147.00 102,018.00 245.00 170,030.00
S-024 15"sewer main (10.1 to 12.0' depth) (d-14) 169      LNFT 136.00 22,984.00 158.00 26,702.00 166.00 28,054.00 275.00 46,475.00
S-025 sewer manhole #1 (d-1) 105.7    FTHT 365.00 38,580.50 364.00 38,474.80 330.00 34,881.00 285.00 30,124.50
S-026 16" force main 47      LNFT 286.00 13,442.00 250.00 11,750.00 180.00 8,460.00 380.00 17,860.00
S-027 20" force main 1,261      LNFT 155.00 195,455.00 90.00 113,490.00 190.00 239,590.00 170.00 214,370.00
S-028 24" force main 1,342      LNFT 189.00 253,638.00 120.00 161,040.00 205.00 275,110.00 210.00 281,820.00
S-029 replace sewer manhole casting (d-7) 5      EACH 430.00 2,150.00 250.00 1,250.00 400.00 2,000.00 600.00 3,000.00
S-030 6" sewer house connection (d-15) 5      EACH 475.00 2,375.00 488.00 2,440.00 800.00 4,000.00 1,500.00 7,500.00
S-031 street name sign on existing post (std 11) 5      EACH 205.00 1,025.00 125.00 625.00 175.00 875.00 170.00 850.00
S-032 street name sign on new post (std 11) 2      EACH 232.00 464.00 130.00 260.00 200.00 400.00 210.00 420.00
                       
 CONTRACTOR TOTAL       1,879,999.99   1,905,928.42   2,068,093.15   2,150,170.65
 
Item Number Item Description Quantity Unit of Measure - 9 -
COMMAND CONSTRUCTION LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 25,000.00 25,000.00            
202-01 removal of structures & obstructions lump      LUMP 12,000.00 12,000.00            
202-02-C removal of portland cement concrete pavement 1,003      SQYD 10.00 10,030.00            
202-02-D removal of concrete walks & drives 676      SQYD 10.00 6,760.00            
202-02-F removal of concrete combination curb & gutter 1,353.4    LNFT 20.00 27,068.00            
202-02-G removal of surfacing & stabilized base 729.0    SQYD 3.00 2,187.00            
202-02-H removal of guard rail 78      LNFT 4.00 312.00            
202-02-I removal of barricades 4      EACH 100.00 400.00            
203-01 general excavation 3,848      CUYD 5.00 19,240.00            
203-04 embankment 5,149      CUYD 12.00 61,788.00            
203-08 borrow (vehicular measurement) 2,846      CUYD 7.50 21,345.00            
204-02 temporary hay or straw bales 200      EACH 8.00 1,600.00            
204-06 temporary silt fencing 4,000      LNFT 1.50 6,000.00            
302-02-A class ii base course (8" thick) 10,079.0    SQYD 13.00 131,027.00            
302-02-B class ii base course (4" thick) 1,922.7    SQYD 8.00 15,381.60            
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 50.00 2,500.00            
601-01-G portland cement concrete pavement (8" thick) 9,396.4    SQYD 40.00 375,856.00            
704-03 blocked out guard rail 115.0    LNFT 14.00 1,610.00            
704-11-A guard rail end treatment (flared) 2      EACH 1,500.00 3,000.00            
705-09 rebuilt fence 18      LNFT 20.00 360.00            
706-01-A concrete walk (4" thick) 1,634.9    SQYD 35.00 57,221.50            
706-02-C concrete drive(6" thick) 200.3    SQYD 45.00 9,013.50            
706-02-D concrete drive(8" thick) 87.5    SQYD 50.00 4,375.00            
707-01 concrete curb 6,002.4    LNFT 6.00 36,014.40            
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00            
717-01 seeding 150      LB 10.00 1,500.00            
718-01 fertilizer 2,475      LB 0.50 1,237.50            
722-01 project site laboratory 1      EACH 2,500.00 2,500.00            
727-01 mobilization lump      LUMP 200,000.00 200,000.00            
729-01 sign (type a) 49.6    SQFT 21.00 1,041.60            
729-19-B dead end road installations(type b) 5      EACH 850.00 4,250.00            
729-21 u-channel post 9      EACH 140.00 1,260.00            
731-02 reflectorized raised pavement markers 63      EACH 5.00 315.00            
732-01-A plastic pavement striping (4" width) 5,848      LNFT 0.50 2,924.00            
732-01-B plastic pavement striping (6" width) 553      LNFT 0.60 331.80            
732-01-D plastic pavement striping (12" width) 118      LNFT 1.50 177.00            
740-01 construction layout lump      LUMP 5,000.00 5,000.00            
S-001 existing site conditions survey lump      LUMP 20,000.00 20,000.00            
S-002 geogrid 10,079      SQYD 3.00 30,237.00            
S-003 saw cut concrete or asphalt (1" depth) 3,982      LNFT 1.00 3,982.00            
S-004 slope paving at drain outlets 8      EACH 600.00 4,800.00            
S-005 storm drain pipe (15" rcp) (d-12) 509      LNFT 80.00 40,720.00            
S-006 storm drain pipe (18" rcp) (d-12) 152      LNFT 120.00 18,240.00            
S-007 storm drain pipe (24" rcp) (d-12) 111      LNFT 150.00 16,650.00            
S-008 storm drain pipe (30" rcp) (d-12) 8      LNFT 400.00 3,200.00            
S-009 storm drain pipe (36" rcp) (d-12) 9      LNFT 400.00 3,600.00            
S-010 storm drain pipe (30" x 18" rcpa) (d-13) 305      LNFT 200.00 61,000.00            
S-011 drop inlet catch basin (d-8) 3      EACH 6,000.00 18,000.00            
S-012 double mountable catch basin (d-11) 1      EACH 6,000.00 6,000.00            
S-013 single vertical catch basin #1 (d-3) 7      EACH 4,000.00 28,000.00            
S-014 double vertical catch basin #1 (d-4) 6      EACH 6,000.00 36,000.00            
S-015 water valve manhole #1 (d-1) 5      EACH 2,200.00 11,000.00            
S-016 drain manhole #2 (d-1) 17.8    FTHT 500.00 8,900.00            
S-017 drain manhole #3 (d-1) 9.9    FTHT 500.00 4,950.00            
S-018 adjust manhole (d-1) 14      EACH 300.00 4,200.00            
S-019 adjust catch basin (d-3) 5      EACH 300.00 1,500.00            
S-020 8" sewer main (6.1 to 8.0' depth) (d-14) 176      LNFT 85.00 14,960.00            
S-021 8" sewer main (8.1 to 10.0'depth) (d-14) 462      LNFT 105.00 48,510.00            
S-022 10"sewer main (8.1 to 10.0'depth) (d-14) 181      LNFT 135.00 24,435.00            
S-023 10"sewer main (10.1 to 12.0' depth) (d-14) 694      LNFT 150.00 104,100.00            
S-024 15"sewer main (10.1 to 12.0' depth) (d-14) 169      LNFT 200.00 33,800.00            
S-025 sewer manhole #1 (d-1) 105.7    FTHT 500.00 52,850.00            
S-026 16" force main 47      LNFT 180.00 8,460.00            
S-027 20" force main 1,261      LNFT 190.00 239,590.00            
S-028 24" force main 1,342      LNFT 215.00 288,530.00            
S-029 replace sewer manhole casting (d-7) 5      EACH 250.00 1,250.00            
S-030 6" sewer house connection (d-15) 5      EACH 600.00 3,000.00            
S-031 street name sign on existing post (std 11) 5      EACH 180.00 900.00            
S-032 street name sign on new post (std 11) 2      EACH 200.00 400.00            
                       
 CONTRACTOR TOTAL       2,197,389.90            