| DBE GOAL FED |
| Lead Project: 742-07-0031 |
| Parish: ORLEANS |
| Routes: |
| Description: MORRISON ROAD IMPROVEMENTS (GANNON ROAD TO VINCENT ROAD) |
Type Const:
grading, drainage structures, sanitary sewer system, class ii base course, portland
cement concrete pavement, and related work. |
|
| |
| Rank | License | Bidder | Amount |
| 1 | 06276 |
BARRIERE CONSTRUCTION CO., LLC. | $1,633,633.20 |
| 2 | 24901 |
HARD ROCK CONSTRUCTION CO. | $1,748,219.30 |
| 3 | 36961 |
CYCLE CONSTRUCTION CO. L.L.C. | $1,775,848.00 |
| 4 | 35678 |
BEVERLY CONSTRUCTION CO. LLC | $1,845,963.67 |
| 5 | 02074 |
CIRCLE, INC. | $1,879,999.99 |
| 6 | 12069 |
B & K CONSTRUCTION CO. | $1,905,928.42 |
| 7 | 02179 |
BOH BROS. CONSTRUCTION CO., LLC. | $2,068,093.15 |
| 8 | 08579 |
RONALD ADAMS CONTRACTOR, INC. | $2,150,170.65 |
| 9 | 40038 |
COMMAND CONSTRUCTION LLC | $2,197,389.90 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - HARD ROCK CONSTRUCTION CO. |
- 3 - CYCLE CONSTRUCTION CO. L.L.C. |
- 4 - BEVERLY CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
8,500.00 |
8,500.00 |
14,000.00 |
14,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
8,000.00 |
8,000.00 |
25,000.00 |
25,000.00 |
600.00 |
600.00 |
23,000.00 |
23,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
1,003   |
SQYD |
8.00 |
8,024.00 |
15.00 |
15,045.00 |
6.00 |
6,018.00 |
7.25 |
7,271.75 |
| 202-02-D |
removal of concrete walks & drives
|
676   |
SQYD |
8.00 |
5,408.00 |
10.00 |
6,760.00 |
7.00 |
4,732.00 |
7.25 |
4,901.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
1,353.4 |
LNFT |
5.00 |
6,767.00 |
2.00 |
2,706.80 |
2.00 |
2,706.80 |
8.30 |
11,233.22 |
| 202-02-G |
removal of surfacing & stabilized base
|
729.0 |
SQYD |
5.00 |
3,645.00 |
10.00 |
7,290.00 |
2.00 |
1,458.00 |
7.40 |
5,394.60 |
| 202-02-H |
removal of guard rail
|
78   |
LNFT |
4.00 |
312.00 |
4.00 |
312.00 |
5.00 |
390.00 |
4.40 |
343.20 |
| 202-02-I |
removal of barricades
|
4   |
EACH |
200.00 |
800.00 |
400.00 |
1,600.00 |
350.00 |
1,400.00 |
370.00 |
1,480.00 |
| 203-01 |
general excavation
|
3,848   |
CUYD |
5.00 |
19,240.00 |
5.00 |
19,240.00 |
7.50 |
28,860.00 |
4.50 |
17,316.00 |
| 203-04 |
embankment
|
5,149   |
CUYD |
5.00 |
25,745.00 |
5.00 |
25,745.00 |
14.00 |
72,086.00 |
11.75 |
60,500.75 |
| 203-08 |
borrow (vehicular measurement)
|
2,846   |
CUYD |
1.00 |
2,846.00 |
FREE |
FREE |
12.00 |
34,152.00 |
10.00 |
28,460.00 |
| 204-02 |
temporary hay or straw bales
|
200   |
EACH |
7.00 |
1,400.00 |
7.00 |
1,400.00 |
7.00 |
1,400.00 |
10.00 |
2,000.00 |
| 204-06 |
temporary silt fencing
|
4,000   |
LNFT |
1.40 |
5,600.00 |
1.00 |
4,000.00 |
1.50 |
6,000.00 |
1.56 |
6,240.00 |
| 302-02-A |
class ii base course (8" thick)
|
10,079.0 |
SQYD |
13.00 |
131,027.00 |
12.00 |
120,948.00 |
12.50 |
125,987.50 |
15.12 |
152,394.48 |
| 302-02-B |
class ii base course (4" thick)
|
1,922.7 |
SQYD |
10.00 |
19,227.00 |
20.00 |
38,454.00 |
8.00 |
15,381.60 |
13.20 |
25,379.64 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
20.00 |
1,000.00 |
50.00 |
2,500.00 |
40.00 |
2,000.00 |
54.00 |
2,700.00 |
| 601-01-G |
portland cement concrete pavement (8" thick)
|
9,396.4 |
SQYD |
38.00 |
357,063.20 |
38.00 |
357,063.20 |
47.00 |
441,630.80 |
39.50 |
371,157.80 |
| 704-03 |
blocked out guard rail
|
115.0 |
LNFT |
14.00 |
1,610.00 |
12.00 |
1,380.00 |
14.00 |
1,610.00 |
14.00 |
1,610.00 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
1,600.00 |
3,200.00 |
1,500.00 |
3,000.00 |
1,600.00 |
3,200.00 |
1,600.00 |
3,200.00 |
| 705-09 |
rebuilt fence
|
18   |
LNFT |
25.00 |
450.00 |
25.00 |
450.00 |
23.00 |
414.00 |
20.00 |
360.00 |
| 706-01-A |
concrete walk (4" thick)
|
1,634.9 |
SQYD |
40.00 |
65,396.00 |
35.00 |
57,221.50 |
34.00 |
55,586.60 |
43.00 |
70,300.70 |
| 706-02-C |
concrete drive(6" thick)
|
200.3 |
SQYD |
47.00 |
9,414.10 |
50.00 |
10,015.00 |
48.00 |
9,614.40 |
52.00 |
10,415.60 |
| 706-02-D |
concrete drive(8" thick)
|
87.5 |
SQYD |
50.00 |
4,375.00 |
55.00 |
4,812.50 |
60.00 |
5,250.00 |
62.00 |
5,425.00 |
| 707-01 |
concrete curb
|
6,002.4 |
LNFT |
6.00 |
36,014.40 |
5.00 |
30,012.00 |
7.50 |
45,018.00 |
8.50 |
51,020.40 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
18,000.00 |
18,000.00 |
20,600.00 |
20,600.00 |
| 717-01 |
seeding
|
150   |
LB |
9.00 |
1,350.00 |
15.00 |
2,250.00 |
10.00 |
1,500.00 |
9.44 |
1,416.00 |
| 718-01 |
fertilizer
|
2,475   |
LB |
0.50 |
1,237.50 |
1.00 |
2,475.00 |
0.50 |
1,237.50 |
0.54 |
1,336.50 |
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
6,000.00 |
6,000.00 |
16,000.00 |
16,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
80,000.00 |
80,000.00 |
154,000.00 |
154,000.00 |
73,000.00 |
73,000.00 |
24,000.00 |
24,000.00 |
| 729-01 |
sign (type a)
|
49.6 |
SQFT |
22.00 |
1,091.20 |
20.00 |
992.00 |
23.00 |
1,140.80 |
22.00 |
1,091.20 |
| 729-19-B |
dead end road installations(type b)
|
5   |
EACH |
800.00 |
4,000.00 |
800.00 |
4,000.00 |
900.00 |
4,500.00 |
1,200.00 |
6,000.00 |
| 729-21 |
u-channel post
|
9   |
EACH |
130.00 |
1,170.00 |
125.00 |
1,125.00 |
97.00 |
873.00 |
138.00 |
1,242.00 |
| 731-02 |
reflectorized raised pavement markers
|
63   |
EACH |
5.00 |
315.00 |
5.00 |
315.00 |
6.00 |
378.00 |
5.50 |
346.50 |
| 732-01-A |
plastic pavement striping (4" width)
|
5,848   |
LNFT |
0.40 |
2,339.20 |
0.40 |
2,339.20 |
0.50 |
2,924.00 |
0.45 |
2,631.60 |
| 732-01-B |
plastic pavement striping (6" width)
|
553   |
LNFT |
0.60 |
331.80 |
0.60 |
331.80 |
1.00 |
553.00 |
0.66 |
364.98 |
| 732-01-D |
plastic pavement striping (12" width)
|
118   |
LNFT |
1.35 |
159.30 |
1.35 |
159.30 |
1.50 |
177.00 |
1.50 |
177.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
22,000.00 |
22,000.00 |
21,000.00 |
21,000.00 |
| S-001 |
existing site conditions survey
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
4,300.00 |
4,300.00 |
| S-002 |
geogrid
|
10,079   |
SQYD |
2.50 |
25,197.50 |
3.00 |
30,237.00 |
3.00 |
30,237.00 |
2.75 |
27,717.25 |
| S-003 |
saw cut concrete or asphalt (1" depth)
|
3,982   |
LNFT |
1.00 |
3,982.00 |
1.00 |
3,982.00 |
1.50 |
5,973.00 |
1.10 |
4,380.20 |
| S-004 |
slope paving at drain outlets
|
8   |
EACH |
300.00 |
2,400.00 |
500.00 |
4,000.00 |
600.00 |
4,800.00 |
900.00 |
7,200.00 |
| S-005 |
storm drain pipe (15" rcp) (d-12)
|
509   |
LNFT |
55.00 |
27,995.00 |
52.00 |
26,468.00 |
56.00 |
28,504.00 |
47.00 |
23,923.00 |
| S-006 |
storm drain pipe (18" rcp) (d-12)
|
152   |
LNFT |
75.00 |
11,400.00 |
56.00 |
8,512.00 |
60.00 |
9,120.00 |
69.00 |
10,488.00 |
| S-007 |
storm drain pipe (24" rcp) (d-12)
|
111   |
LNFT |
90.00 |
9,990.00 |
86.00 |
9,546.00 |
81.00 |
8,991.00 |
90.00 |
9,990.00 |
| S-008 |
storm drain pipe (30" rcp) (d-12)
|
8   |
LNFT |
400.00 |
3,200.00 |
411.00 |
3,288.00 |
370.00 |
2,960.00 |
248.00 |
1,984.00 |
| S-009 |
storm drain pipe (36" rcp) (d-12)
|
9   |
LNFT |
450.00 |
4,050.00 |
376.00 |
3,384.00 |
372.00 |
3,348.00 |
325.00 |
2,925.00 |
| S-010 |
storm drain pipe (30" x 18" rcpa) (d-13)
|
305   |
LNFT |
90.00 |
27,450.00 |
79.00 |
24,095.00 |
86.00 |
26,230.00 |
96.40 |
29,402.00 |
| S-011 |
drop inlet catch basin (d-8)
|
3   |
EACH |
2,300.00 |
6,900.00 |
1,800.00 |
5,400.00 |
2,500.00 |
7,500.00 |
2,450.00 |
7,350.00 |
| S-012 |
double mountable catch basin (d-11)
|
1   |
EACH |
4,100.00 |
4,100.00 |
3,300.00 |
3,300.00 |
5,000.00 |
5,000.00 |
3,750.00 |
3,750.00 |
| S-013 |
single vertical catch basin #1 (d-3)
|
7   |
EACH |
2,600.00 |
18,200.00 |
2,100.00 |
14,700.00 |
2,400.00 |
16,800.00 |
2,300.00 |
16,100.00 |
| S-014 |
double vertical catch basin #1 (d-4)
|
6   |
EACH |
5,000.00 |
30,000.00 |
2,600.00 |
15,600.00 |
5,000.00 |
30,000.00 |
3,100.00 |
18,600.00 |
| S-015 |
water valve manhole #1 (d-1)
|
5   |
EACH |
1,500.00 |
7,500.00 |
2,000.00 |
10,000.00 |
2,700.00 |
13,500.00 |
2,408.00 |
12,040.00 |
| S-016 |
drain manhole #2 (d-1)
|
17.8 |
FTHT |
500.00 |
8,900.00 |
350.00 |
6,230.00 |
400.00 |
7,120.00 |
315.00 |
5,607.00 |
| S-017 |
drain manhole #3 (d-1)
|
9.9 |
FTHT |
540.00 |
5,346.00 |
450.00 |
4,455.00 |
450.00 |
4,455.00 |
315.00 |
3,118.50 |
| S-018 |
adjust manhole (d-1)
|
14   |
EACH |
500.00 |
7,000.00 |
300.00 |
4,200.00 |
400.00 |
5,600.00 |
744.00 |
10,416.00 |
| S-019 |
adjust catch basin (d-3)
|
5   |
EACH |
100.00 |
500.00 |
700.00 |
3,500.00 |
500.00 |
2,500.00 |
725.00 |
3,625.00 |
| S-020 |
8" sewer main (6.1 to 8.0' depth) (d-14)
|
176   |
LNFT |
90.00 |
15,840.00 |
80.00 |
14,080.00 |
75.00 |
13,200.00 |
148.00 |
26,048.00 |
| S-021 |
8" sewer main (8.1 to 10.0'depth) (d-14)
|
462   |
LNFT |
100.00 |
46,200.00 |
90.00 |
41,580.00 |
90.00 |
41,580.00 |
150.00 |
69,300.00 |
| S-022 |
10"sewer main (8.1 to 10.0'depth) (d-14)
|
181   |
LNFT |
110.00 |
19,910.00 |
110.00 |
19,910.00 |
111.00 |
20,091.00 |
152.00 |
27,512.00 |
| S-023 |
10"sewer main (10.1 to 12.0' depth) (d-14)
|
694   |
LNFT |
140.00 |
97,160.00 |
115.00 |
79,810.00 |
113.00 |
78,422.00 |
172.00 |
119,368.00 |
| S-024 |
15"sewer main (10.1 to 12.0' depth) (d-14)
|
169   |
LNFT |
150.00 |
25,350.00 |
200.00 |
33,800.00 |
142.00 |
23,998.00 |
181.00 |
30,589.00 |
| S-025 |
sewer manhole #1 (d-1)
|
105.7 |
FTHT |
450.00 |
47,565.00 |
300.00 |
31,710.00 |
400.00 |
42,280.00 |
244.00 |
25,790.80 |
| S-026 |
16" force main
|
47   |
LNFT |
400.00 |
18,800.00 |
500.00 |
23,500.00 |
280.00 |
13,160.00 |
116.00 |
5,452.00 |
| S-027 |
20" force main
|
1,261   |
LNFT |
100.00 |
126,100.00 |
110.00 |
138,710.00 |
102.00 |
128,622.00 |
117.00 |
147,537.00 |
| S-028 |
24" force main
|
1,342   |
LNFT |
120.00 |
161,040.00 |
140.00 |
187,880.00 |
134.00 |
179,828.00 |
157.00 |
210,694.00 |
| S-029 |
replace sewer manhole casting (d-7)
|
5   |
EACH |
250.00 |
1,250.00 |
500.00 |
2,500.00 |
450.00 |
2,250.00 |
525.00 |
2,625.00 |
| S-030 |
6" sewer house connection (d-15)
|
5   |
EACH |
100.00 |
500.00 |
500.00 |
2,500.00 |
900.00 |
4,500.00 |
900.00 |
4,500.00 |
| S-031 |
street name sign on existing post (std 11)
|
5   |
EACH |
170.00 |
850.00 |
200.00 |
1,000.00 |
400.00 |
2,000.00 |
178.00 |
890.00 |
| S-032 |
street name sign on new post (std 11)
|
2   |
EACH |
200.00 |
400.00 |
200.00 |
400.00 |
500.00 |
1,000.00 |
216.00 |
432.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,633,633.20 |
|
1,748,219.30 |
|
1,775,848.00 |
|
1,845,963.67 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - CIRCLE, INC. |
- 6 - B & K CONSTRUCTION CO. |
- 7 - BOH BROS. CONSTRUCTION CO., LLC. |
- 8 - RONALD ADAMS CONTRACTOR, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
4,000.00 |
4,000.00 |
6,300.00 |
6,300.00 |
5,000.00 |
5,000.00 |
32,000.00 |
32,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,100.00 |
5,100.00 |
33,000.00 |
33,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
1,003   |
SQYD |
6.20 |
6,218.60 |
7.00 |
7,021.00 |
7.00 |
7,021.00 |
6.50 |
6,519.50 |
| 202-02-D |
removal of concrete walks & drives
|
676   |
SQYD |
5.60 |
3,785.60 |
6.50 |
4,394.00 |
7.00 |
4,732.00 |
8.50 |
5,746.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
1,353.4 |
LNFT |
2.80 |
3,789.52 |
2.50 |
3,383.50 |
4.00 |
5,413.60 |
4.50 |
6,090.30 |
| 202-02-G |
removal of surfacing & stabilized base
|
729.0 |
SQYD |
2.70 |
1,968.30 |
6.50 |
4,738.50 |
7.00 |
5,103.00 |
5.00 |
3,645.00 |
| 202-02-H |
removal of guard rail
|
78   |
LNFT |
4.00 |
312.00 |
3.25 |
253.50 |
4.00 |
312.00 |
5.00 |
390.00 |
| 202-02-I |
removal of barricades
|
4   |
EACH |
101.00 |
404.00 |
110.00 |
440.00 |
500.00 |
2,000.00 |
300.00 |
1,200.00 |
| 203-01 |
general excavation
|
3,848   |
CUYD |
4.30 |
16,546.40 |
6.00 |
23,088.00 |
7.00 |
26,936.00 |
8.00 |
30,784.00 |
| 203-04 |
embankment
|
5,149   |
CUYD |
4.00 |
20,596.00 |
9.00 |
46,341.00 |
8.00 |
41,192.00 |
7.50 |
38,617.50 |
| 203-08 |
borrow (vehicular measurement)
|
2,846   |
CUYD |
15.00 |
42,690.00 |
11.00 |
31,306.00 |
10.00 |
28,460.00 |
8.00 |
22,768.00 |
| 204-02 |
temporary hay or straw bales
|
200   |
EACH |
7.00 |
1,400.00 |
5.00 |
1,000.00 |
6.00 |
1,200.00 |
6.00 |
1,200.00 |
| 204-06 |
temporary silt fencing
|
4,000   |
LNFT |
1.50 |
6,000.00 |
2.00 |
8,000.00 |
1.50 |
6,000.00 |
1.50 |
6,000.00 |
| 302-02-A |
class ii base course (8" thick)
|
10,079.0 |
SQYD |
15.00 |
151,185.00 |
11.00 |
110,869.00 |
14.00 |
141,106.00 |
12.50 |
125,987.50 |
| 302-02-B |
class ii base course (4" thick)
|
1,922.7 |
SQYD |
13.00 |
24,995.10 |
5.00 |
9,613.50 |
11.00 |
21,149.70 |
12.50 |
24,033.75 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
36.50 |
1,825.00 |
26.00 |
1,300.00 |
28.00 |
1,400.00 |
30.00 |
1,500.00 |
| 601-01-G |
portland cement concrete pavement (8" thick)
|
9,396.4 |
SQYD |
41.00 |
385,252.40 |
55.30 |
519,620.92 |
45.00 |
422,838.00 |
40.00 |
375,856.00 |
| 704-03 |
blocked out guard rail
|
115.0 |
LNFT |
15.00 |
1,725.00 |
19.00 |
2,185.00 |
13.00 |
1,495.00 |
14.00 |
1,610.00 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
1,700.00 |
3,400.00 |
2,000.00 |
4,000.00 |
1,500.00 |
3,000.00 |
1,600.00 |
3,200.00 |
| 705-09 |
rebuilt fence
|
18   |
LNFT |
95.00 |
1,710.00 |
10.00 |
180.00 |
55.00 |
990.00 |
25.00 |
450.00 |
| 706-01-A |
concrete walk (4" thick)
|
1,634.9 |
SQYD |
34.00 |
55,586.60 |
34.00 |
55,586.60 |
38.00 |
62,126.20 |
30.00 |
49,047.00 |
| 706-02-C |
concrete drive(6" thick)
|
200.3 |
SQYD |
42.00 |
8,412.60 |
38.00 |
7,611.40 |
42.00 |
8,412.60 |
36.00 |
7,210.80 |
| 706-02-D |
concrete drive(8" thick)
|
87.5 |
SQYD |
48.00 |
4,200.00 |
44.00 |
3,850.00 |
45.00 |
3,937.50 |
45.00 |
3,937.50 |
| 707-01 |
concrete curb
|
6,002.4 |
LNFT |
9.50 |
57,022.80 |
19.00 |
114,045.60 |
6.00 |
36,014.40 |
5.50 |
33,013.20 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
29,300.00 |
29,300.00 |
35,000.00 |
35,000.00 |
25,000.00 |
25,000.00 |
24,000.00 |
24,000.00 |
| 717-01 |
seeding
|
150   |
LB |
10.00 |
1,500.00 |
12.00 |
1,800.00 |
9.00 |
1,350.00 |
9.00 |
1,350.00 |
| 718-01 |
fertilizer
|
2,475   |
LB |
0.60 |
1,485.00 |
0.50 |
1,237.50 |
0.50 |
1,237.50 |
0.35 |
866.25 |
| 722-01 |
project site laboratory
|
1   |
EACH |
4,900.00 |
4,900.00 |
8,000.00 |
8,000.00 |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
33,000.00 |
33,000.00 |
33,000.00 |
33,000.00 |
101,000.00 |
101,000.00 |
72,000.00 |
72,000.00 |
| 729-01 |
sign (type a)
|
49.6 |
SQFT |
26.00 |
1,289.60 |
21.00 |
1,041.60 |
21.00 |
1,041.60 |
22.00 |
1,091.20 |
| 729-19-B |
dead end road installations(type b)
|
5   |
EACH |
950.00 |
4,750.00 |
1,325.00 |
6,625.00 |
1,200.00 |
6,000.00 |
900.00 |
4,500.00 |
| 729-21 |
u-channel post
|
9   |
EACH |
148.50 |
1,336.50 |
50.00 |
450.00 |
130.00 |
1,170.00 |
135.00 |
1,215.00 |
| 731-02 |
reflectorized raised pavement markers
|
63   |
EACH |
6.00 |
378.00 |
5.00 |
315.00 |
5.50 |
346.50 |
5.00 |
315.00 |
| 732-01-A |
plastic pavement striping (4" width)
|
5,848   |
LNFT |
0.50 |
2,924.00 |
0.80 |
4,678.40 |
0.45 |
2,631.60 |
0.45 |
2,631.60 |
| 732-01-B |
plastic pavement striping (6" width)
|
553   |
LNFT |
0.70 |
387.10 |
3.00 |
1,659.00 |
0.65 |
359.45 |
0.65 |
359.45 |
| 732-01-D |
plastic pavement striping (12" width)
|
118   |
LNFT |
2.00 |
236.00 |
4.50 |
531.00 |
1.50 |
177.00 |
1.50 |
177.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
32,000.00 |
32,000.00 |
51,000.00 |
51,000.00 |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
| S-001 |
existing site conditions survey
|
lump |
LUMP |
3,519.92 |
3,519.92 |
8,125.00 |
8,125.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
| S-002 |
geogrid
|
10,079   |
SQYD |
2.50 |
25,197.50 |
2.00 |
20,158.00 |
3.00 |
30,237.00 |
2.90 |
29,229.10 |
| S-003 |
saw cut concrete or asphalt (1" depth)
|
3,982   |
LNFT |
0.55 |
2,190.10 |
1.50 |
5,973.00 |
1.25 |
4,977.50 |
1.25 |
4,977.50 |
| S-004 |
slope paving at drain outlets
|
8   |
EACH |
1,400.00 |
11,200.00 |
245.00 |
1,960.00 |
1,000.00 |
8,000.00 |
600.00 |
4,800.00 |
| S-005 |
storm drain pipe (15" rcp) (d-12)
|
509   |
LNFT |
42.00 |
21,378.00 |
55.00 |
27,995.00 |
70.00 |
35,630.00 |
55.00 |
27,995.00 |
| S-006 |
storm drain pipe (18" rcp) (d-12)
|
152   |
LNFT |
52.00 |
7,904.00 |
71.00 |
10,792.00 |
80.00 |
12,160.00 |
83.00 |
12,616.00 |
| S-007 |
storm drain pipe (24" rcp) (d-12)
|
111   |
LNFT |
73.25 |
8,130.75 |
98.00 |
10,878.00 |
100.00 |
11,100.00 |
114.00 |
12,654.00 |
| S-008 |
storm drain pipe (30" rcp) (d-12)
|
8   |
LNFT |
116.50 |
932.00 |
170.00 |
1,360.00 |
300.00 |
2,400.00 |
300.00 |
2,400.00 |
| S-009 |
storm drain pipe (36" rcp) (d-12)
|
9   |
LNFT |
196.00 |
1,764.00 |
221.00 |
1,989.00 |
400.00 |
3,600.00 |
300.00 |
2,700.00 |
| S-010 |
storm drain pipe (30" x 18" rcpa) (d-13)
|
305   |
LNFT |
76.50 |
23,332.50 |
120.00 |
36,600.00 |
120.00 |
36,600.00 |
112.00 |
34,160.00 |
| S-011 |
drop inlet catch basin (d-8)
|
3   |
EACH |
2,550.00 |
7,650.00 |
2,125.00 |
6,375.00 |
2,800.00 |
8,400.00 |
1,700.00 |
5,100.00 |
| S-012 |
double mountable catch basin (d-11)
|
1   |
EACH |
5,575.00 |
5,575.00 |
2,950.00 |
2,950.00 |
5,400.00 |
5,400.00 |
6,000.00 |
6,000.00 |
| S-013 |
single vertical catch basin #1 (d-3)
|
7   |
EACH |
3,190.00 |
22,330.00 |
2,385.00 |
16,695.00 |
3,700.00 |
25,900.00 |
3,300.00 |
23,100.00 |
| S-014 |
double vertical catch basin #1 (d-4)
|
6   |
EACH |
10,800.00 |
64,800.00 |
4,298.00 |
25,788.00 |
6,100.00 |
36,600.00 |
7,000.00 |
42,000.00 |
| S-015 |
water valve manhole #1 (d-1)
|
5   |
EACH |
3,360.00 |
16,800.00 |
4,207.00 |
21,035.00 |
2,200.00 |
11,000.00 |
2,900.00 |
14,500.00 |
| S-016 |
drain manhole #2 (d-1)
|
17.8 |
FTHT |
340.00 |
6,052.00 |
513.00 |
9,131.40 |
480.00 |
8,544.00 |
440.00 |
7,832.00 |
| S-017 |
drain manhole #3 (d-1)
|
9.9 |
FTHT |
344.00 |
3,405.60 |
538.00 |
5,326.20 |
500.00 |
4,950.00 |
440.00 |
4,356.00 |
| S-018 |
adjust manhole (d-1)
|
14   |
EACH |
1,475.00 |
20,650.00 |
200.00 |
2,800.00 |
350.00 |
4,900.00 |
600.00 |
8,400.00 |
| S-019 |
adjust catch basin (d-3)
|
5   |
EACH |
950.00 |
4,750.00 |
698.00 |
3,490.00 |
350.00 |
1,750.00 |
1,900.00 |
9,500.00 |
| S-020 |
8" sewer main (6.1 to 8.0' depth) (d-14)
|
176   |
LNFT |
93.00 |
16,368.00 |
87.00 |
15,312.00 |
93.00 |
16,368.00 |
180.00 |
31,680.00 |
| S-021 |
8" sewer main (8.1 to 10.0'depth) (d-14)
|
462   |
LNFT |
104.00 |
48,048.00 |
114.00 |
52,668.00 |
116.00 |
53,592.00 |
200.00 |
92,400.00 |
| S-022 |
10"sewer main (8.1 to 10.0'depth) (d-14)
|
181   |
LNFT |
108.00 |
19,548.00 |
117.00 |
21,177.00 |
124.00 |
22,444.00 |
210.00 |
38,010.00 |
| S-023 |
10"sewer main (10.1 to 12.0' depth) (d-14)
|
694   |
LNFT |
125.00 |
86,750.00 |
141.00 |
97,854.00 |
147.00 |
102,018.00 |
245.00 |
170,030.00 |
| S-024 |
15"sewer main (10.1 to 12.0' depth) (d-14)
|
169   |
LNFT |
136.00 |
22,984.00 |
158.00 |
26,702.00 |
166.00 |
28,054.00 |
275.00 |
46,475.00 |
| S-025 |
sewer manhole #1 (d-1)
|
105.7 |
FTHT |
365.00 |
38,580.50 |
364.00 |
38,474.80 |
330.00 |
34,881.00 |
285.00 |
30,124.50 |
| S-026 |
16" force main
|
47   |
LNFT |
286.00 |
13,442.00 |
250.00 |
11,750.00 |
180.00 |
8,460.00 |
380.00 |
17,860.00 |
| S-027 |
20" force main
|
1,261   |
LNFT |
155.00 |
195,455.00 |
90.00 |
113,490.00 |
190.00 |
239,590.00 |
170.00 |
214,370.00 |
| S-028 |
24" force main
|
1,342   |
LNFT |
189.00 |
253,638.00 |
120.00 |
161,040.00 |
205.00 |
275,110.00 |
210.00 |
281,820.00 |
| S-029 |
replace sewer manhole casting (d-7)
|
5   |
EACH |
430.00 |
2,150.00 |
250.00 |
1,250.00 |
400.00 |
2,000.00 |
600.00 |
3,000.00 |
| S-030 |
6" sewer house connection (d-15)
|
5   |
EACH |
475.00 |
2,375.00 |
488.00 |
2,440.00 |
800.00 |
4,000.00 |
1,500.00 |
7,500.00 |
| S-031 |
street name sign on existing post (std 11)
|
5   |
EACH |
205.00 |
1,025.00 |
125.00 |
625.00 |
175.00 |
875.00 |
170.00 |
850.00 |
| S-032 |
street name sign on new post (std 11)
|
2   |
EACH |
232.00 |
464.00 |
130.00 |
260.00 |
200.00 |
400.00 |
210.00 |
420.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,879,999.99 |
|
1,905,928.42 |
|
2,068,093.15 |
|
2,150,170.65 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 9 - COMMAND CONSTRUCTION LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
1,003   |
SQYD |
10.00 |
10,030.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
676   |
SQYD |
10.00 |
6,760.00 |
|
|
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
1,353.4 |
LNFT |
20.00 |
27,068.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
729.0 |
SQYD |
3.00 |
2,187.00 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
78   |
LNFT |
4.00 |
312.00 |
|
|
|
|
|
|
| 202-02-I |
removal of barricades
|
4   |
EACH |
100.00 |
400.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
3,848   |
CUYD |
5.00 |
19,240.00 |
|
|
|
|
|
|
| 203-04 |
embankment
|
5,149   |
CUYD |
12.00 |
61,788.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,846   |
CUYD |
7.50 |
21,345.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
200   |
EACH |
8.00 |
1,600.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
4,000   |
LNFT |
1.50 |
6,000.00 |
|
|
|
|
|
|
| 302-02-A |
class ii base course (8" thick)
|
10,079.0 |
SQYD |
13.00 |
131,027.00 |
|
|
|
|
|
|
| 302-02-B |
class ii base course (4" thick)
|
1,922.7 |
SQYD |
8.00 |
15,381.60 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
50.00 |
2,500.00 |
|
|
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
9,396.4 |
SQYD |
40.00 |
375,856.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
115.0 |
LNFT |
14.00 |
1,610.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
1,500.00 |
3,000.00 |
|
|
|
|
|
|
| 705-09 |
rebuilt fence
|
18   |
LNFT |
20.00 |
360.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
1,634.9 |
SQYD |
35.00 |
57,221.50 |
|
|
|
|
|
|
| 706-02-C |
concrete drive(6" thick)
|
200.3 |
SQYD |
45.00 |
9,013.50 |
|
|
|
|
|
|
| 706-02-D |
concrete drive(8" thick)
|
87.5 |
SQYD |
50.00 |
4,375.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
6,002.4 |
LNFT |
6.00 |
36,014.40 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
150   |
LB |
10.00 |
1,500.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
2,475   |
LB |
0.50 |
1,237.50 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| 729-01 |
sign (type a)
|
49.6 |
SQFT |
21.00 |
1,041.60 |
|
|
|
|
|
|
| 729-19-B |
dead end road installations(type b)
|
5   |
EACH |
850.00 |
4,250.00 |
|
|
|
|
|
|
| 729-21 |
u-channel post
|
9   |
EACH |
140.00 |
1,260.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
63   |
EACH |
5.00 |
315.00 |
|
|
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
5,848   |
LNFT |
0.50 |
2,924.00 |
|
|
|
|
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
553   |
LNFT |
0.60 |
331.80 |
|
|
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
118   |
LNFT |
1.50 |
177.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| S-001 |
existing site conditions survey
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| S-002 |
geogrid
|
10,079   |
SQYD |
3.00 |
30,237.00 |
|
|
|
|
|
|
| S-003 |
saw cut concrete or asphalt (1" depth)
|
3,982   |
LNFT |
1.00 |
3,982.00 |
|
|
|
|
|
|
| S-004 |
slope paving at drain outlets
|
8   |
EACH |
600.00 |
4,800.00 |
|
|
|
|
|
|
| S-005 |
storm drain pipe (15" rcp) (d-12)
|
509   |
LNFT |
80.00 |
40,720.00 |
|
|
|
|
|
|
| S-006 |
storm drain pipe (18" rcp) (d-12)
|
152   |
LNFT |
120.00 |
18,240.00 |
|
|
|
|
|
|
| S-007 |
storm drain pipe (24" rcp) (d-12)
|
111   |
LNFT |
150.00 |
16,650.00 |
|
|
|
|
|
|
| S-008 |
storm drain pipe (30" rcp) (d-12)
|
8   |
LNFT |
400.00 |
3,200.00 |
|
|
|
|
|
|
| S-009 |
storm drain pipe (36" rcp) (d-12)
|
9   |
LNFT |
400.00 |
3,600.00 |
|
|
|
|
|
|
| S-010 |
storm drain pipe (30" x 18" rcpa) (d-13)
|
305   |
LNFT |
200.00 |
61,000.00 |
|
|
|
|
|
|
| S-011 |
drop inlet catch basin (d-8)
|
3   |
EACH |
6,000.00 |
18,000.00 |
|
|
|
|
|
|
| S-012 |
double mountable catch basin (d-11)
|
1   |
EACH |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| S-013 |
single vertical catch basin #1 (d-3)
|
7   |
EACH |
4,000.00 |
28,000.00 |
|
|
|
|
|
|
| S-014 |
double vertical catch basin #1 (d-4)
|
6   |
EACH |
6,000.00 |
36,000.00 |
|
|
|
|
|
|
| S-015 |
water valve manhole #1 (d-1)
|
5   |
EACH |
2,200.00 |
11,000.00 |
|
|
|
|
|
|
| S-016 |
drain manhole #2 (d-1)
|
17.8 |
FTHT |
500.00 |
8,900.00 |
|
|
|
|
|
|
| S-017 |
drain manhole #3 (d-1)
|
9.9 |
FTHT |
500.00 |
4,950.00 |
|
|
|
|
|
|
| S-018 |
adjust manhole (d-1)
|
14   |
EACH |
300.00 |
4,200.00 |
|
|
|
|
|
|
| S-019 |
adjust catch basin (d-3)
|
5   |
EACH |
300.00 |
1,500.00 |
|
|
|
|
|
|
| S-020 |
8" sewer main (6.1 to 8.0' depth) (d-14)
|
176   |
LNFT |
85.00 |
14,960.00 |
|
|
|
|
|
|
| S-021 |
8" sewer main (8.1 to 10.0'depth) (d-14)
|
462   |
LNFT |
105.00 |
48,510.00 |
|
|
|
|
|
|
| S-022 |
10"sewer main (8.1 to 10.0'depth) (d-14)
|
181   |
LNFT |
135.00 |
24,435.00 |
|
|
|
|
|
|
| S-023 |
10"sewer main (10.1 to 12.0' depth) (d-14)
|
694   |
LNFT |
150.00 |
104,100.00 |
|
|
|
|
|
|
| S-024 |
15"sewer main (10.1 to 12.0' depth) (d-14)
|
169   |
LNFT |
200.00 |
33,800.00 |
|
|
|
|
|
|
| S-025 |
sewer manhole #1 (d-1)
|
105.7 |
FTHT |
500.00 |
52,850.00 |
|
|
|
|
|
|
| S-026 |
16" force main
|
47   |
LNFT |
180.00 |
8,460.00 |
|
|
|
|
|
|
| S-027 |
20" force main
|
1,261   |
LNFT |
190.00 |
239,590.00 |
|
|
|
|
|
|
| S-028 |
24" force main
|
1,342   |
LNFT |
215.00 |
288,530.00 |
|
|
|
|
|
|
| S-029 |
replace sewer manhole casting (d-7)
|
5   |
EACH |
250.00 |
1,250.00 |
|
|
|
|
|
|
| S-030 |
6" sewer house connection (d-15)
|
5   |
EACH |
600.00 |
3,000.00 |
|
|
|
|
|
|
| S-031 |
street name sign on existing post (std 11)
|
5   |
EACH |
180.00 |
900.00 |
|
|
|
|
|
|
| S-032 |
street name sign on new post (std 11)
|
2   |
EACH |
200.00 |
400.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,197,389.90 |
|
|
|
|
|
|
|