Letting of 4/27/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 450-90-0107
Parish: ORLEANS
Routes: I-10
Description: I-10/S. CLAIBORNE AVE.
Type Const: sidewalks, landscaping, lighting and related work
 
RankLicenseBidderAmount
140038 COMMAND CONSTRUCTION LLC $1,597,501.00
202074 CIRCLE, INC. $1,690,109.00
325747 KOSTMAYER CONSTRUCTION, LLC $1,720,589.70
402179 BOH BROS. CONSTRUCTION CO., LLC. $1,775,198.00
512702 J. CALDARERA & CO., INC. $1,958,813.45
 
Item Number Item Description Quantity Unit of Measure - 1 -
COMMAND CONSTRUCTION LLC
- 2 -
CIRCLE, INC.
- 3 -
KOSTMAYER CONSTRUCTION, LLC
- 4 -
BOH BROS. CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 5,000.00 5,000.00 16,000.00 16,000.00 14,000.00 14,000.00 3,000.00 3,000.00
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 6,500.00 6,500.00 14,000.00 14,000.00 3,000.00 3,000.00
202-02-D removal of concrete walks & drives 2,409      SQYD 10.00 24,090.00 8.50 20,476.50 11.00 26,499.00 8.00 19,272.00
202-02-E-01 removal of concrete curbs 2,869.0    LNFT 25.00 71,725.00 9.50 27,255.50 4.00 11,476.00 3.00 8,607.00
202-02-E-02 removal of asphalt curbs 1,183.0    LNFT 25.00 29,575.00 4.50 5,323.50 4.00 4,732.00 3.00 3,549.00
202-02-F removal of concrete combination curb & gutter 1,384.0    LNFT 25.00 34,600.00 11.00 15,224.00 6.00 8,304.00 6.00 8,304.00
202-02-I removal of bollards 80      EACH 1.00 80.00 23.00 1,840.00 60.00 4,800.00 50.00 4,000.00
202-02-J removal of parking meters 24      EACH 1.00 24.00 51.00 1,224.00 24.00 576.00 50.00 1,200.00
203-09 geotextile fabric 2,900      SQYD 1.00 2,900.00 2.10 6,090.00 1.07 3,103.00 1.50 4,350.00
302-01 class ii base course 214.0    CUYD 125.00 26,750.00 42.00 8,988.00 60.00 12,840.00 70.00 14,980.00
701-07-E yard drain pipe (12" rcp) 19      LNFT 150.00 2,850.00 70.00 1,330.00 48.00 912.00 50.00 950.00
702-03-C catch basins (cb-06) 5      EACH 7,000.00 35,000.00 3,800.00 19,000.00 3,000.00 15,000.00 3,500.00 17,500.00
702-04-A adjusting manholes 8      EACH 200.00 1,600.00 415.00 3,320.00 650.00 5,200.00 400.00 3,200.00
702-04-B adjusting catch basins 18      EACH 250.00 4,500.00 1,300.00 23,400.00 400.00 7,200.00 400.00 7,200.00
705-09 rebuilt fence 306      LNFT 30.00 9,180.00 23.00 7,038.00 18.00 5,508.00 35.00 10,710.00
706-02-C concrete drive (6" thick) 290.0    SQYD 35.00 10,150.00 51.00 14,790.00 70.00 20,300.00 60.00 17,400.00
707-03 combination concrete curb & gutter 4,620.0    LNFT 25.00 115,500.00 16.50 76,230.00 9.00 41,580.00 17.00 78,540.00
713-01 temporary signs & barricades lump      LUMP 1,000.00 1,000.00 35,000.00 35,000.00 7,700.00 7,700.00 15,000.00 15,000.00
718-01 fertilizer 160      LB 0.50 80.00 0.60 96.00 3.00 480.00 3.00 480.00
719-01-A plants (ilex s attenuata, "savannah holly", 3" cal,
8'-10' ht, 2" dbh, 30 gal container)
28      EACH 250.00 7,000.00 300.00 8,400.00 625.00 17,500.00 275.00 7,700.00
719-01-B plants (pisatacia chinensis, "chinese pistache",4" cal,
12'-14' ht, 2" dbh, 60 gal container)
27      EACH 500.00 13,500.00 565.00 15,255.00 700.00 18,900.00 500.00 13,500.00
719-01-C plants (lagerstroemia indica x fauriei, "crape myrtle
tuskegee", 12'-14'ht, trunk size 1" min, 30 gal
container)
7      EACH 200.00 1,400.00 215.00 1,505.00 400.00 2,800.00 200.00 1,400.00
719-01-D plants (trachelospermum asiaticum, "asian jasmine",
1 gal, 48 per tree opening)
2,784      EACH 3.00 8,352.00 3.50 9,744.00 6.00 16,704.00 4.00 11,136.00
719-02 top dressing mulch (3" depth)(crushed pine straw) 380      SQYD 4.00 1,520.00 4.25 1,615.00 7.00 2,660.00 4.00 1,520.00
719-03 bed preparation (24" depth) 45      SQYD 40.00 1,800.00 12.00 540.00 65.00 2,925.00 11.00 495.00
724-01-C pavement patching (2" asp surface) 100      SQYD 20.00 2,000.00 15.55 1,555.00 48.00 4,800.00 25.00 2,500.00
724-01-D pavement patching (surface & base) 100      SQYD 200.00 20,000.00 17.49 1,749.00 68.00 6,800.00 95.00 9,500.00
727-01 mobilization lump      LUMP 150,000.00 150,000.00 28,400.00 28,400.00 70,000.00 70,000.00 122,000.00 122,000.00
730-02 conduit with conductors (1 1/2" dia. pvc with 4 -
#4 stranded single conductors)
3,000      LNFT 15.00 45,000.00 15.00 45,000.00 12.00 36,000.00 13.00 39,000.00
730-04 jacked or bored casing (1 1/2" dia. pvc with 4 -
#4 stranded single conductors)
375      LNFT 22.00 8,250.00 25.00 9,375.00 27.25 10,218.75 18.00 6,750.00
730-05 light pole (13' ht, decorative cast ductile iron,
including handhole)
56      EACH 2,700.00 151,200.00 2,925.00 163,800.00 3,288.00 184,128.00 3,000.00 168,000.00
730-07 luminaire (washington postlight, 175 watt metal halide,
120 volts, type ii distribution)
56      EACH 950.00 53,200.00 1,025.00 57,400.00 1,261.00 70,616.00 1,150.00 64,400.00
730-08 electrical service point 2      EACH 900.00 1,800.00 940.00 1,880.00 489.00 978.00 1,500.00 3,000.00
732-01-A plastic pavement striping (4" width) 870      LNFT 0.50 435.00 0.50 435.00 1.35 1,174.50 0.50 435.00
732-01-B plastic pavement striping (6" width) 1,780      LNFT 1.00 1,780.00 0.80 1,424.00 2.07 3,684.60 0.75 1,335.00
732-01-E plastic pavement striping (24" width) 445      LNFT 3.00 1,335.00 3.00 1,335.00 6.53 2,905.85 3.00 1,335.00
740-01 construction layout lump      LUMP 1,000.00 1,000.00 25,000.00 25,000.00 38,000.00 38,000.00 10,000.00 10,000.00
805-01-C class a concrete (retaining walls) 322.00   CUYD 400.00 128,800.00 395.00 127,190.00 700.00 225,400.00 400.00 128,800.00
S-001 full depth saw cut 58,100      LFIN 0.75 43,575.00 1.65 95,865.00 1.00 58,100.00 1.50 87,150.00
S-002 brick paver sidewalk, (5" thick concrete base and sand
subbase)
2,500      SQYD 90.00 225,000.00 130.00 325,000.00 128.00 320,000.00 125.00 312,500.00
S-003 decorative concrete sidewalk, (5" thick with sand base) 2,870      SQYD 70.00 200,900.00 95.00 272,650.00 92.00 264,040.00 120.00 344,400.00
S-004 handicapped ramps (concrete & pavers) (type "a") 110      SQYD 50.00 5,500.00 113.00 12,430.00 180.00 19,800.00 200.00 22,000.00
S-005 handicapped ramps (concrete & pavers) (type "b") 130      SQYD 50.00 6,500.00 186.00 24,180.00 180.00 23,400.00 200.00 26,000.00
S-006 ornamental fence 1,545      LNFT 60.00 92,700.00 78.00 120,510.00 42.00 64,890.00 75.00 115,875.00
S-007 relocate ornamental fence 460      LNFT 22.00 10,120.00 24.00 11,040.00 15.00 6,900.00 25.00 11,500.00
S-008 remove and reset ornamental fence 130      LNFT 22.00 2,860.00 24.00 3,120.00 15.00 1,950.00 25.00 3,250.00
S-009 ornamental walk through gate and hardware 8      EACH 1,000.00 8,000.00 1,075.00 8,600.00 1,450.00 11,600.00 1,200.00 9,600.00
S-010 relocate ornamental walk through gate and hardware 1      EACH 270.00 270.00 290.00 290.00 410.00 410.00 250.00 250.00
S-011 ornamental sliding gate and hardware 1      EACH 5,500.00 5,500.00 5,950.00 5,950.00 12,650.00 12,650.00 6,000.00 6,000.00
S-012 relocate ornamental sliding gate and hardware 1      EACH 1,100.00 1,100.00 1,226.00 1,226.00 1,000.00 1,000.00 1,200.00 1,200.00
S-013 wheel stop 90      EACH 30.00 2,700.00 50.50 4,545.00 29.00 2,610.00 40.00 3,600.00
S-014 project sign 2      EACH 1,000.00 2,000.00 650.00 1,300.00 950.00 1,900.00 750.00 1,500.00
S-015 iron bench 4      EACH 1,100.00 4,400.00 1,900.00 7,600.00 1,300.00 5,200.00 2,000.00 8,000.00
S-016 trash receptacle 2      EACH 400.00 800.00 1,050.00 2,100.00 800.00 1,600.00 1,250.00 2,500.00
S-017 adjust sewer cleanouts 3      EACH 100.00 300.00 125.00 375.00 600.00 1,800.00 750.00 2,250.00
S-018 adjust traffic control box 2      EACH 100.00 200.00 350.25 700.50 395.00 790.00 350.00 700.00
S-019 adjust electrical box 1      EACH 100.00 100.00 300.00 300.00 395.00 395.00 375.00 375.00
S-020 drop inlet (24" x 30") 1      EACH 7,000.00 7,000.00 1,600.00 1,600.00 1,150.00 1,150.00 2,500.00 2,500.00
                       
 CONTRACTOR TOTAL       1,597,501.00   1,690,109.00   1,720,589.70   1,775,198.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
J. CALDARERA & CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 2,500.00 2,500.00            
202-01 removal of structures & obstructions lump      LUMP 3,000.00 3,000.00            
202-02-D removal of concrete walks & drives 2,409      SQYD 3.95 9,515.55            
202-02-E-01 removal of concrete curbs 2,869.0    LNFT 3.30 9,467.70            
202-02-E-02 removal of asphalt curbs 1,183.0    LNFT 3.00 3,549.00            
202-02-F removal of concrete combination curb & gutter 1,384.0    LNFT 4.30 5,951.20            
202-02-I removal of bollards 80      EACH 176.00 14,080.00            
202-02-J removal of parking meters 24      EACH 398.00 9,552.00            
203-09 geotextile fabric 2,900      SQYD 2.65 7,685.00            
302-01 class ii base course 214.0    CUYD 41.00 8,774.00            
701-07-E yard drain pipe (12" rcp) 19      LNFT 87.00 1,653.00            
702-03-C catch basins (cb-06) 5      EACH 3,200.00 16,000.00            
702-04-A adjusting manholes 8      EACH 500.00 4,000.00            
702-04-B adjusting catch basins 18      EACH 500.00 9,000.00            
705-09 rebuilt fence 306      LNFT 16.00 4,896.00            
706-02-C concrete drive (6" thick) 290.0    SQYD 58.00 16,820.00            
707-03 combination concrete curb & gutter 4,620.0    LNFT 33.00 152,460.00            
713-01 temporary signs & barricades lump      LUMP 9,200.00 9,200.00            
718-01 fertilizer 160      LB 3.80 608.00            
719-01-A plants (ilex s attenuata, "savannah holly", 3" cal,
8'-10' ht, 2" dbh, 30 gal container)
28      EACH 240.00 6,720.00            
719-01-B plants (pisatacia chinensis, "chinese pistache",4" cal,
12'-14' ht, 2" dbh, 60 gal container)
27      EACH 240.00 6,480.00            
719-01-C plants (lagerstroemia indica x fauriei, "crape myrtle
tuskegee", 12'-14'ht, trunk size 1" min, 30 gal
container)
7      EACH 430.00 3,010.00            
719-01-D plants (trachelospermum asiaticum, "asian jasmine",
1 gal, 48 per tree opening)
2,784      EACH 10.00 27,840.00            
719-02 top dressing mulch (3" depth)(crushed pine straw) 380      SQYD 6.85 2,603.00            
719-03 bed preparation (24" depth) 45      SQYD 43.00 1,935.00            
724-01-C pavement patching (2" asp surface) 100      SQYD 63.00 6,300.00            
724-01-D pavement patching (surface & base) 100      SQYD 100.00 10,000.00            
727-01 mobilization lump      LUMP 43,000.00 43,000.00            
730-02 conduit with conductors (1 1/2" dia. pvc with 4 -
#4 stranded single conductors)
3,000      LNFT 11.76 35,280.00            
730-04 jacked or bored casing (1 1/2" dia. pvc with 4 -
#4 stranded single conductors)
375      LNFT 108.00 40,500.00            
730-05 light pole (13' ht, decorative cast ductile iron,
including handhole)
56      EACH 2,500.00 140,000.00            
730-07 luminaire (washington postlight, 175 watt metal halide,
120 volts, type ii distribution)
56      EACH 1,160.00 64,960.00            
730-08 electrical service point 2      EACH 1,771.00 3,542.00            
732-01-A plastic pavement striping (4" width) 870      LNFT 2.80 2,436.00            
732-01-B plastic pavement striping (6" width) 1,780      LNFT 4.25 7,565.00            
732-01-E plastic pavement striping (24" width) 445      LNFT 7.80 3,471.00            
740-01 construction layout lump      LUMP 27,000.00 27,000.00            
805-01-C class a concrete (retaining walls) 322.00   CUYD 440.00 141,680.00            
S-001 full depth saw cut 58,100      LFIN 1.50 87,150.00            
S-002 brick paver sidewalk, (5" thick concrete base and sand
subbase)
2,500      SQYD 165.00 412,500.00            
S-003 decorative concrete sidewalk, (5" thick with sand base) 2,870      SQYD 95.00 272,650.00            
S-004 handicapped ramps (concrete & pavers) (type "a") 110      SQYD 250.00 27,500.00            
S-005 handicapped ramps (concrete & pavers) (type "b") 130      SQYD 250.00 32,500.00            
S-006 ornamental fence 1,545      LNFT 115.00 177,675.00            
S-007 relocate ornamental fence 460      LNFT 55.00 25,300.00            
S-008 remove and reset ornamental fence 130      LNFT 60.00 7,800.00            
S-009 ornamental walk through gate and hardware 8      EACH 1,200.00 9,600.00            
S-010 relocate ornamental walk through gate and hardware 1      EACH 500.00 500.00            
S-011 ornamental sliding gate and hardware 1      EACH 3,000.00 3,000.00            
S-012 relocate ornamental sliding gate and hardware 1      EACH 3,800.00 3,800.00            
S-013 wheel stop 90      EACH 40.00 3,600.00            
S-014 project sign 2      EACH 2,600.00 5,200.00            
S-015 iron bench 4      EACH 1,955.00 7,820.00            
S-016 trash receptacle 2      EACH 1,955.00 3,910.00            
S-017 adjust sewer cleanouts 3      EACH 725.00 2,175.00            
S-018 adjust traffic control box 2      EACH 3,100.00 6,200.00            
S-019 adjust electrical box 1      EACH 3,500.00 3,500.00            
S-020 drop inlet (24" x 30") 1      EACH 3,400.00 3,400.00            
                       
 CONTRACTOR TOTAL       1,958,813.45            