Letting of 4/27/2005 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 260-10-0005
Parish: ST HELENA
Routes: LA 441
Description: DISTRICT WIDE ASPHALTIC SURFACE TREATMENT (CM)
Type Const: asphaltic surface treatment (type b) (crs-2p only) (stone only), thermoplastic striping,
and related work
 
RankLicenseBidderAmount
114422 T. L. WALLACE CONSTRUCTION, INC. $546,028.60
201552 W. R. CORE, LLC. $553,952.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
T. L. WALLACE CONSTRUCTION, INC.
- 2 -
W. R. CORE, LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
507-01-A asphaltic surface treatment (1 application) 354,505      SQYD 1.06 375,775.30 0.98 347,414.90        
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 30,000.00 30,000.00        
713-07-A temporary reflectorized raised pavement markers (tabs) 3,568      EACH 1.00 3,568.00 1.50 5,352.00        
727-01 mobilization lump      LUMP 10,000.00 10,000.00 35,000.00 35,000.00        
731-02 reflectorized raised pavement markers 3,568      EACH 4.50 16,056.00 4.50 16,056.00        
732-01-E plastic pavement striping (24" width) 59      LNFT 2.00 118.00 2.00 118.00        
732-02-A-03 plast pvmt striping(solid line)(4" width)hot appl
thermo (40mil thickness)
93.040  MILE 1,200.00 111,648.00 1,200.00 111,648.00        
732-03-A-03 plastic pvmt striping(broken line)(4" width) hot appl
thermo (40 mil thick)
11.310  MILE 430.00 4,863.30 430.00 4,863.30        
740-01 construction layout lump      LUMP 4,000.00 4,000.00 3,500.00 3,500.00        
                       
 CONTRACTOR TOTAL       546,028.60   553,952.20        