| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BULLIARD CONSTRUCTION CO. INC. |
- 2 - DARRAN CONSTRUCTION CO., INC |
- 3 - THE MECO GROUP INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,299.54 |
4,299.54 |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
568   |
SQYD |
13.68 |
7,770.24 |
12.30 |
6,986.40 |
9.00 |
5,112.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
652   |
SQYD |
10.39 |
6,774.28 |
12.00 |
7,824.00 |
7.00 |
4,564.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
2,746.59 |
2,746.59 |
14,350.00 |
14,350.00 |
10,000.00 |
10,000.00 |
|
|
| 302-02-D |
class ii base course (12" thick) (stone or recycled
concrete) |
304.8 |
SQYD |
45.36 |
13,825.72 |
41.00 |
12,496.80 |
21.00 |
6,400.80 |
|
|
| 701-03-F |
storm drain pipe (15" rcp)
|
26   |
LNFT |
50.90 |
1,323.40 |
55.00 |
1,430.00 |
45.00 |
1,170.00 |
|
|
| 702-02-B |
manholes (r-cb-11)
|
1   |
EACH |
2,125.41 |
2,125.41 |
2,120.00 |
2,120.00 |
3,500.00 |
3,500.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
2   |
EACH |
2,369.01 |
4,738.02 |
2,270.00 |
4,540.00 |
3,200.00 |
6,400.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
1,018.0 |
SQYD |
36.24 |
36,892.32 |
42.00 |
42,756.00 |
40.00 |
40,720.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
111.0 |
SQYD |
35.01 |
3,886.11 |
85.50 |
9,490.50 |
45.00 |
4,995.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
982.6 |
LNFT |
18.90 |
18,571.14 |
22.40 |
22,010.24 |
28.00 |
27,512.80 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,439.61 |
4,439.61 |
2,700.00 |
2,700.00 |
4,000.00 |
4,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
6,333.60 |
6,333.60 |
1,370.00 |
1,370.00 |
24,800.00 |
24,800.00 |
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.036 |
MILE |
101,094.00 |
3,639.38 |
83,333.33 |
2,999.99 |
200,000.00 |
7,200.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
1,934.79 |
1,934.79 |
1,560.00 |
1,560.00 |
1,000.00 |
1,000.00 |
|
|
| S-001 |
stenciled concrete header
|
1,150   |
LNFT |
7.31 |
8,406.50 |
14.70 |
16,905.00 |
10.00 |
11,500.00 |
|
|
| S-002 |
furnish and install 9" x 2' bolt-down trench frame and
cover |
11   |
EACH |
228.66 |
2,515.26 |
390.00 |
4,290.00 |
275.00 |
3,025.00 |
|
|
| S-003 |
furnish and install 18" x 2' bolt-down trench frame
and cover |
16   |
EACH |
349.57 |
5,593.12 |
520.00 |
8,320.00 |
400.00 |
6,400.00 |
|
|
| S-004 |
saw cut full depth
|
10,975   |
LFIN |
1.22 |
13,389.50 |
1.20 |
13,170.00 |
1.25 |
13,718.75 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
149,204.53 |
|
177,318.93 |
|
186,018.35 |
|
|
|