| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - MADDEN CONTRACTING CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
774   |
LNFT |
4.00 |
3,096.00 |
5.00 |
3,870.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
100   |
CUYD |
19.00 |
1,900.00 |
25.00 |
2,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
7,776.1 |
TON |
52.00 |
404,357.20 |
55.08 |
428,307.58 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
20.2 |
TON |
179.00 |
3,615.80 |
366.00 |
7,393.20 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
67,617   |
SQYD |
0.90 |
60,855.30 |
1.35 |
91,282.95 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,626   |
CUYD |
1.00 |
- 1,626.00 |
0.10 |
- 162.60 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
200.0 |
LNFT |
34.00 |
6,800.00 |
30.00 |
6,000.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
18.00 |
2,700.00 |
16.00 |
2,400.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
61.00 |
6,100.00 |
54.00 |
5,400.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
1,800.00 |
7,200.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,000.00 |
7,000.00 |
31,400.00 |
31,400.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
3,168   |
LNFT |
0.12 |
380.16 |
0.10 |
316.80 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
540   |
LNFT |
0.25 |
135.00 |
0.20 |
108.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
166   |
LNFT |
0.70 |
116.20 |
0.60 |
99.60 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.839 |
MILE |
340.00 |
2,665.26 |
263.50 |
2,065.57 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.487 |
MILE |
250.00 |
2,121.75 |
1.00 |
8.48 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
21.070 |
MILE |
200.00 |
4,214.00 |
1.00 |
21.07 |
|
|
|
|
| 717-01 |
seeding
|
8   |
LB |
8.00 |
64.00 |
20.00 |
160.00 |
|
|
|
|
| 718-01 |
fertilizer
|
250   |
LB |
0.45 |
112.50 |
1.00 |
250.00 |
|
|
|
|
| 721-01 |
asphalt mulch
|
605   |
GAL |
1.00 |
605.00 |
1.00 |
605.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
150   |
SQYD |
120.00 |
18,000.00 |
96.80 |
14,520.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
17,000.00 |
17,000.00 |
31,400.00 |
31,400.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
70.00 |
280.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
711   |
EACH |
5.00 |
3,555.00 |
4.50 |
3,199.50 |
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
1,584   |
LNFT |
0.45 |
712.80 |
0.40 |
633.60 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
270   |
LNFT |
1.00 |
270.00 |
0.80 |
216.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
83   |
LNFT |
3.00 |
249.00 |
2.40 |
199.20 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.535 |
MILE |
1,700.00 |
17,909.50 |
1,800.00 |
18,963.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.244 |
MILE |
725.00 |
3,076.90 |
675.00 |
2,864.70 |
|
|
|
|
| 735-01 |
mailboxes
|
70   |
EACH |
1.15 |
80.50 |
1.00 |
70.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
36   |
EACH |
120.00 |
4,320.00 |
125.00 |
4,500.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
17   |
EACH |
150.00 |
2,550.00 |
170.00 |
2,890.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
3   |
EACH |
300.00 |
900.00 |
300.00 |
900.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
8,500.00 |
8,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
588,155.87 |
|
678,361.65 |
|
|
|
|
|