| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
385   |
CUYD |
40.00 |
15,400.00 |
40.00 |
15,400.00 |
70.73 |
27,231.05 |
|
|
| 502-01 |
superpave asphaltic concrete
|
1,012.2 |
TON |
53.00 |
53,646.60 |
65.00 |
65,793.00 |
66.35 |
67,159.47 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
473.5 |
TON |
53.00 |
25,095.50 |
70.00 |
33,145.00 |
121.63 |
57,591.80 |
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
7,961   |
SQYD |
3.50 |
27,863.50 |
2.75 |
21,892.75 |
3.52 |
28,022.72 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
7,961   |
SQYD |
1.60 |
12,737.60 |
1.75 |
13,931.75 |
2.71 |
21,574.31 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 221   |
CUYD |
10.00 |
- 2,210.00 |
10.00 |
- 2,210.00 |
0.10 |
- 22.10 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
24,000.00 |
24,000.00 |
5,725.00 |
5,725.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
110   |
LNFT |
1.00 |
110.00 |
0.30 |
33.00 |
1.13 |
124.30 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.620 |
MILE |
150.00 |
93.00 |
10.00 |
6.20 |
281.00 |
174.22 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.060 |
MILE |
350.00 |
371.00 |
10.00 |
10.60 |
382.00 |
404.92 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
3.380 |
MILE |
700.00 |
2,366.00 |
20.00 |
67.60 |
764.00 |
2,582.32 |
|
|
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
82   |
EACH |
2.00 |
164.00 |
0.25 |
20.50 |
1.79 |
146.78 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
100   |
SQYD |
85.00 |
8,500.00 |
100.00 |
10,000.00 |
128.07 |
12,807.00 |
|
|
| 724-01-C |
pavement patching (15" minimum thickness)
|
20   |
SQYD |
90.00 |
1,800.00 |
110.00 |
2,200.00 |
204.26 |
4,085.20 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
19,000.00 |
19,000.00 |
22,000.00 |
22,000.00 |
29,300.00 |
29,300.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
70.00 |
420.00 |
150.00 |
900.00 |
77.54 |
465.24 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
82   |
EACH |
6.00 |
492.00 |
5.50 |
451.00 |
6.68 |
547.76 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
55   |
LNFT |
5.00 |
275.00 |
3.40 |
187.00 |
3.70 |
203.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.690 |
MILE |
2,200.00 |
3,718.00 |
2,250.00 |
3,802.50 |
2,481.00 |
4,192.89 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.530 |
MILE |
750.00 |
397.50 |
700.00 |
371.00 |
826.00 |
437.78 |
|
|
| 736-09 |
loop detector
|
700   |
LNFT |
13.00 |
9,100.00 |
12.00 |
8,400.00 |
13.12 |
9,184.00 |
|
|
| 736-10 |
underground junction box
|
1   |
EACH |
300.00 |
300.00 |
350.00 |
350.00 |
300.00 |
300.00 |
|
|
| 739-01 |
hydro-seeding
|
0.36 |
ACRE |
4,000.00 |
1,440.00 |
1,000.00 |
360.00 |
2,985.00 |
1,074.60 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
2,500.00 |
2,500.00 |
7,100.00 |
7,100.00 |
|
|
| S-001 |
u-channel post installation
|
40   |
each |
45.00 |
1,800.00 |
70.00 |
2,800.00 |
54.00 |
2,160.00 |
|
|
| S-002 |
cleaning existing ditches
|
1,600   |
LNFT |
3.00 |
4,800.00 |
2.00 |
3,200.00 |
12.00 |
19,200.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
198,679.70 |
|
229,611.90 |
|
301,772.76 |
|
|
|