Letting of 3/30/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 845-02-0018
Parish: ST CHARLES
Routes: LA 628
Description: LA 628, ST. JOHN PARISH LINE - U.S. 61
Type Const: grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete overlay, pavement widening, and related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC $1,806,890.82
206487 HUEY STOCKSTILL, INC. $1,993,756.50
300481 COASTAL BRIDGE CO., L.L.C. $2,051,360.69
400849 F.G. SULLIVAN, JR. CONTRACTOR LLC $2,061,060.40
502179 BOH BROS. CONSTRUCTION CO., LLC. $2,191,739.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
HUEY STOCKSTILL, INC.
- 3 -
COASTAL BRIDGE CO., L.L.C.
- 4 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-G removal of surfacing and stabilized base 1,500.0    SQYD 5.00 7,500.00 5.00 7,500.00 10.00 15,000.00 10.00 15,000.00
203-02 drainage excavation 1,000      CUYD 14.00 14,000.00 8.00 8,000.00 5.00 5,000.00 10.00 10,000.00
203-04 embankment 1,000      CUYD 14.00 14,000.00 16.00 16,000.00 16.00 16,000.00 10.00 10,000.00
203-05 nonplastic embankment 5,169      CUYD 14.00 72,366.00 16.00 82,704.00 14.00 72,366.00 10.00 51,690.00
203-08 borrow (vehicular measurement) 1,500      CUYD 12.00 18,000.00 10.00 15,000.00 12.00 18,000.00 10.00 15,000.00
203-08-A borrow (vehicular measurement)(select soils) 250      CUYD 12.00 3,000.00 10.00 2,500.00 14.00 3,500.00 10.00 2,500.00
203-09 geotextile fabric 9,500      SQYD 1.00 9,500.00 1.40 13,300.00 1.50 14,250.00 3.00 28,500.00
302-02-B class ii base course (8 1/2" thick) 4,350.0    SQYD 15.00 65,250.00 13.00 56,550.00 17.00 73,950.00 35.00 152,250.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,129      CUYD 40.00 45,160.00 19.00 21,451.00 25.00 28,225.00 35.00 39,515.00
502-01 superpave asphaltic concrete 16,254.6    TON 45.00 731,457.00 51.00 828,984.60 55.00 894,003.00 43.00 698,947.80
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,200.0    TON 60.00 72,000.00 100.00 120,000.00 72.00 86,400.00 85.00 102,000.00
509-01 cold planing asphaltic pavement 64,077      SQYD 1.50 96,115.50 1.00 64,077.00 1.75 112,134.75 2.00 128,154.00
509-02 contractor retained reclaimed asphaltic pavement - 1,779      CUYD 10.00 - 17,790.00 FREE FREE 1.00 - 1,779.00 0.10 - 177.90
701-01-G cross drain pipe (18" rcp/pcp) 812      LNFT 75.00 60,900.00 60.00 48,720.00 100.00 81,200.00 70.00 56,840.00
713-01 temporary signs & barricades lump      LUMP 60,000.00 60,000.00 17,000.00 17,000.00 15,000.00 15,000.00 110,000.00 110,000.00
713-03-E temporary pavement markings (24" width) 183      LNFT 1.00 183.00 1.00 183.00 1.70 311.10 0.50 91.50
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
5.410  MILE 250.00 1,352.50 500.00 2,705.00 300.00 1,623.00 500.00 2,705.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
10.560  MILE 1.00 10.56 10.00 105.60 221.00 2,333.76 100.00 1,056.00
713-05-A temporary pavement markings (solid line)(4" width) 33.690  MILE 4.00 134.76 20.00 673.80 442.00 14,890.98 100.00 3,369.00
713-06-D temporary pavement legends and symbols (rr crossing) 12      EACH 10.00 120.00 10.00 120.00 150.00 1,800.00 100.00 1,200.00
724-01-B pavement patching (12" minimum thickness) 5,000      SQYD 30.00 150,000.00 45.00 225,000.00 20.00 100,000.00 25.00 125,000.00
724-02 pavement widening 4,238.7    SQYD 25.00 105,967.50 25.00 105,967.50 30.00 127,161.00 40.00 169,548.00
726-01 bedding material 156.0    CUYD 35.00 5,460.00 40.00 6,240.00 60.00 9,360.00 40.00 6,240.00
727-01 mobilization lump      LUMP 180,000.00 180,000.00 174,000.00 174,000.00 200,000.00 200,000.00 150,000.00 150,000.00
729-01 sign (type a) 120.0    SQFT 36.00 4,320.00 40.00 4,800.00 35.00 4,200.00 40.00 4,800.00
729-16-B object marker assembly (type 2) 36      EACH 46.00 1,656.00 50.00 1,800.00 45.00 1,620.00 50.00 1,800.00
729-19-C dead end road installations(type c) 10      EACH 475.00 4,750.00 500.00 5,000.00 450.00 4,500.00 500.00 5,000.00
731-02 reflectorized raised pavement markers 720      EACH 6.00 4,320.00 5.00 3,600.00 5.10 3,672.00 6.00 4,320.00
732-01-E plastic pavement striping (24" width) 61      LNFT 4.00 244.00 3.00 183.00 3.10 189.10 5.00 305.00
732-02-A plastic pavement striping (solid line) (4" width) 11.230  MILE 2,000.00 22,460.00 1,800.00 20,214.00 1,992.00 22,370.16 2,400.00 26,952.00
732-03-A plastic pavement striping (broken line)(4" width) 3.520  MILE 700.00 2,464.00 700.00 2,464.00 642.00 2,259.84 1,000.00 3,520.00
732-04-D plastic pavement legends & symbols (rr crossing) 4      EACH 500.00 2,000.00 500.00 2,000.00 460.00 1,840.00 700.00 2,800.00
735-01 mailboxes 37      EACH 10.00 370.00 12.00 444.00 10.00 370.00 5.00 185.00
735-02 mailbox supports (single) 35      EACH 100.00 3,500.00 110.00 3,850.00 100.00 3,500.00 150.00 5,250.00
735-03 mailbox supports (double) 1      EACH 120.00 120.00 120.00 120.00 110.00 110.00 200.00 200.00
740-01 construction layout lump      LUMP 20,000.00 20,000.00 15,000.00 15,000.00 50,000.00 50,000.00 50,000.00 50,000.00
S-001 cleaning existing ditches 25,000      LNFT 1.00 25,000.00 3.00 75,000.00 1.50 37,500.00 2.50 62,500.00
S-002 tree removal 10      EACH 1,200.00 12,000.00 2,000.00 20,000.00 1,500.00 15,000.00 500.00 5,000.00
S-003 scarifying, rolling and compacting roadbed 4,500      SQYD 2.00 9,000.00 5.00 22,500.00 3.00 13,500.00 2.00 9,000.00
                       
 CONTRACTOR TOTAL       1,806,890.82   1,993,756.50   2,051,360.69   2,061,060.40
 
Item Number Item Description Quantity Unit of Measure - 5 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-G removal of surfacing and stabilized base 1,500.0    SQYD 5.00 7,500.00            
203-02 drainage excavation 1,000      CUYD 12.00 12,000.00            
203-04 embankment 1,000      CUYD 10.00 10,000.00            
203-05 nonplastic embankment 5,169      CUYD 10.00 51,690.00            
203-08 borrow (vehicular measurement) 1,500      CUYD 10.00 15,000.00            
203-08-A borrow (vehicular measurement)(select soils) 250      CUYD 10.00 2,500.00            
203-09 geotextile fabric 9,500      SQYD 1.00 9,500.00            
302-02-B class ii base course (8 1/2" thick) 4,350.0    SQYD 12.00 52,200.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
1,129      CUYD 50.00 56,450.00            
502-01 superpave asphaltic concrete 16,254.6    TON 60.00 975,276.00            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,200.0    TON 80.00 96,000.00            
509-01 cold planing asphaltic pavement 64,077      SQYD 1.50 96,115.50            
509-02 contractor retained reclaimed asphaltic pavement - 1,779      CUYD 10.00 - 17,790.00            
701-01-G cross drain pipe (18" rcp/pcp) 812      LNFT 110.00 89,320.00            
713-01 temporary signs & barricades lump      LUMP 60,000.00 60,000.00            
713-03-E temporary pavement markings (24" width) 183      LNFT 0.20 36.60            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
5.410  MILE 10.00 54.10            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
10.560  MILE 10.00 105.60            
713-05-A temporary pavement markings (solid line)(4" width) 33.690  MILE 20.00 673.80            
713-06-D temporary pavement legends and symbols (rr crossing) 12      EACH 50.00 600.00            
724-01-B pavement patching (12" minimum thickness) 5,000      SQYD 40.00 200,000.00            
724-02 pavement widening 4,238.7    SQYD 40.00 169,548.00            
726-01 bedding material 156.0    CUYD 50.00 7,800.00            
727-01 mobilization lump      LUMP 200,000.00 200,000.00            
729-01 sign (type a) 120.0    SQFT 38.00 4,560.00            
729-16-B object marker assembly (type 2) 36      EACH 45.00 1,620.00            
729-19-C dead end road installations(type c) 10      EACH 425.00 4,250.00            
731-02 reflectorized raised pavement markers 720      EACH 5.50 3,960.00            
732-01-E plastic pavement striping (24" width) 61      LNFT 3.30 201.30            
732-02-A plastic pavement striping (solid line) (4" width) 11.230  MILE 2,100.00 23,583.00            
732-03-A plastic pavement striping (broken line)(4" width) 3.520  MILE 700.00 2,464.00            
732-04-D plastic pavement legends & symbols (rr crossing) 4      EACH 500.00 2,000.00            
735-01 mailboxes 37      EACH 1.00 37.00            
735-02 mailbox supports (single) 35      EACH 110.00 3,850.00            
735-03 mailbox supports (double) 1      EACH 135.00 135.00            
740-01 construction layout lump      LUMP 5,000.00 5,000.00            
S-001 cleaning existing ditches 25,000      LNFT 1.00 25,000.00            
S-002 tree removal 10      EACH 1,150.00 11,500.00            
S-003 scarifying, rolling and compacting roadbed 4,500      SQYD 2.00 9,000.00            
                       
 CONTRACTOR TOTAL       2,191,739.90            