| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HUEY STOCKSTILL, INC. |
- 3 - COASTAL BRIDGE CO., L.L.C. |
- 4 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-G |
removal of surfacing and stabilized base
|
1,500.0 |
SQYD |
5.00 |
7,500.00 |
5.00 |
7,500.00 |
10.00 |
15,000.00 |
10.00 |
15,000.00 |
| 203-02 |
drainage excavation
|
1,000   |
CUYD |
14.00 |
14,000.00 |
8.00 |
8,000.00 |
5.00 |
5,000.00 |
10.00 |
10,000.00 |
| 203-04 |
embankment
|
1,000   |
CUYD |
14.00 |
14,000.00 |
16.00 |
16,000.00 |
16.00 |
16,000.00 |
10.00 |
10,000.00 |
| 203-05 |
nonplastic embankment
|
5,169   |
CUYD |
14.00 |
72,366.00 |
16.00 |
82,704.00 |
14.00 |
72,366.00 |
10.00 |
51,690.00 |
| 203-08 |
borrow (vehicular measurement)
|
1,500   |
CUYD |
12.00 |
18,000.00 |
10.00 |
15,000.00 |
12.00 |
18,000.00 |
10.00 |
15,000.00 |
| 203-08-A |
borrow (vehicular measurement)(select soils)
|
250   |
CUYD |
12.00 |
3,000.00 |
10.00 |
2,500.00 |
14.00 |
3,500.00 |
10.00 |
2,500.00 |
| 203-09 |
geotextile fabric
|
9,500   |
SQYD |
1.00 |
9,500.00 |
1.40 |
13,300.00 |
1.50 |
14,250.00 |
3.00 |
28,500.00 |
| 302-02-B |
class ii base course (8 1/2" thick)
|
4,350.0 |
SQYD |
15.00 |
65,250.00 |
13.00 |
56,550.00 |
17.00 |
73,950.00 |
35.00 |
152,250.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,129   |
CUYD |
40.00 |
45,160.00 |
19.00 |
21,451.00 |
25.00 |
28,225.00 |
35.00 |
39,515.00 |
| 502-01 |
superpave asphaltic concrete
|
16,254.6 |
TON |
45.00 |
731,457.00 |
51.00 |
828,984.60 |
55.00 |
894,003.00 |
43.00 |
698,947.80 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,200.0 |
TON |
60.00 |
72,000.00 |
100.00 |
120,000.00 |
72.00 |
86,400.00 |
85.00 |
102,000.00 |
| 509-01 |
cold planing asphaltic pavement
|
64,077   |
SQYD |
1.50 |
96,115.50 |
1.00 |
64,077.00 |
1.75 |
112,134.75 |
2.00 |
128,154.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,779   |
CUYD |
10.00 |
- 17,790.00 |
FREE |
FREE |
1.00 |
- 1,779.00 |
0.10 |
- 177.90 |
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
812   |
LNFT |
75.00 |
60,900.00 |
60.00 |
48,720.00 |
100.00 |
81,200.00 |
70.00 |
56,840.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,000.00 |
60,000.00 |
17,000.00 |
17,000.00 |
15,000.00 |
15,000.00 |
110,000.00 |
110,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
183   |
LNFT |
1.00 |
183.00 |
1.00 |
183.00 |
1.70 |
311.10 |
0.50 |
91.50 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.410 |
MILE |
250.00 |
1,352.50 |
500.00 |
2,705.00 |
300.00 |
1,623.00 |
500.00 |
2,705.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
10.560 |
MILE |
1.00 |
10.56 |
10.00 |
105.60 |
221.00 |
2,333.76 |
100.00 |
1,056.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
33.690 |
MILE |
4.00 |
134.76 |
20.00 |
673.80 |
442.00 |
14,890.98 |
100.00 |
3,369.00 |
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
12   |
EACH |
10.00 |
120.00 |
10.00 |
120.00 |
150.00 |
1,800.00 |
100.00 |
1,200.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
5,000   |
SQYD |
30.00 |
150,000.00 |
45.00 |
225,000.00 |
20.00 |
100,000.00 |
25.00 |
125,000.00 |
| 724-02 |
pavement widening
|
4,238.7 |
SQYD |
25.00 |
105,967.50 |
25.00 |
105,967.50 |
30.00 |
127,161.00 |
40.00 |
169,548.00 |
| 726-01 |
bedding material
|
156.0 |
CUYD |
35.00 |
5,460.00 |
40.00 |
6,240.00 |
60.00 |
9,360.00 |
40.00 |
6,240.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
180,000.00 |
180,000.00 |
174,000.00 |
174,000.00 |
200,000.00 |
200,000.00 |
150,000.00 |
150,000.00 |
| 729-01 |
sign (type a)
|
120.0 |
SQFT |
36.00 |
4,320.00 |
40.00 |
4,800.00 |
35.00 |
4,200.00 |
40.00 |
4,800.00 |
| 729-16-B |
object marker assembly (type 2)
|
36   |
EACH |
46.00 |
1,656.00 |
50.00 |
1,800.00 |
45.00 |
1,620.00 |
50.00 |
1,800.00 |
| 729-19-C |
dead end road installations(type c)
|
10   |
EACH |
475.00 |
4,750.00 |
500.00 |
5,000.00 |
450.00 |
4,500.00 |
500.00 |
5,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
720   |
EACH |
6.00 |
4,320.00 |
5.00 |
3,600.00 |
5.10 |
3,672.00 |
6.00 |
4,320.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
61   |
LNFT |
4.00 |
244.00 |
3.00 |
183.00 |
3.10 |
189.10 |
5.00 |
305.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.230 |
MILE |
2,000.00 |
22,460.00 |
1,800.00 |
20,214.00 |
1,992.00 |
22,370.16 |
2,400.00 |
26,952.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.520 |
MILE |
700.00 |
2,464.00 |
700.00 |
2,464.00 |
642.00 |
2,259.84 |
1,000.00 |
3,520.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
EACH |
500.00 |
2,000.00 |
500.00 |
2,000.00 |
460.00 |
1,840.00 |
700.00 |
2,800.00 |
| 735-01 |
mailboxes
|
37   |
EACH |
10.00 |
370.00 |
12.00 |
444.00 |
10.00 |
370.00 |
5.00 |
185.00 |
| 735-02 |
mailbox supports (single)
|
35   |
EACH |
100.00 |
3,500.00 |
110.00 |
3,850.00 |
100.00 |
3,500.00 |
150.00 |
5,250.00 |
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
120.00 |
120.00 |
120.00 |
120.00 |
110.00 |
110.00 |
200.00 |
200.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
| S-001 |
cleaning existing ditches
|
25,000   |
LNFT |
1.00 |
25,000.00 |
3.00 |
75,000.00 |
1.50 |
37,500.00 |
2.50 |
62,500.00 |
| S-002 |
tree removal
|
10   |
EACH |
1,200.00 |
12,000.00 |
2,000.00 |
20,000.00 |
1,500.00 |
15,000.00 |
500.00 |
5,000.00 |
| S-003 |
scarifying, rolling and compacting roadbed
|
4,500   |
SQYD |
2.00 |
9,000.00 |
5.00 |
22,500.00 |
3.00 |
13,500.00 |
2.00 |
9,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,806,890.82 |
|
1,993,756.50 |
|
2,051,360.69 |
|
2,061,060.40 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-G |
removal of surfacing and stabilized base
|
1,500.0 |
SQYD |
5.00 |
7,500.00 |
|
|
|
|
|
|
| 203-02 |
drainage excavation
|
1,000   |
CUYD |
12.00 |
12,000.00 |
|
|
|
|
|
|
| 203-04 |
embankment
|
1,000   |
CUYD |
10.00 |
10,000.00 |
|
|
|
|
|
|
| 203-05 |
nonplastic embankment
|
5,169   |
CUYD |
10.00 |
51,690.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,500   |
CUYD |
10.00 |
15,000.00 |
|
|
|
|
|
|
| 203-08-A |
borrow (vehicular measurement)(select soils)
|
250   |
CUYD |
10.00 |
2,500.00 |
|
|
|
|
|
|
| 203-09 |
geotextile fabric
|
9,500   |
SQYD |
1.00 |
9,500.00 |
|
|
|
|
|
|
| 302-02-B |
class ii base course (8 1/2" thick)
|
4,350.0 |
SQYD |
12.00 |
52,200.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,129   |
CUYD |
50.00 |
56,450.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
16,254.6 |
TON |
60.00 |
975,276.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,200.0 |
TON |
80.00 |
96,000.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
64,077   |
SQYD |
1.50 |
96,115.50 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,779   |
CUYD |
10.00 |
- 17,790.00 |
|
|
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
812   |
LNFT |
110.00 |
89,320.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,000.00 |
60,000.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
183   |
LNFT |
0.20 |
36.60 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.410 |
MILE |
10.00 |
54.10 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
10.560 |
MILE |
10.00 |
105.60 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
33.690 |
MILE |
20.00 |
673.80 |
|
|
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
12   |
EACH |
50.00 |
600.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
5,000   |
SQYD |
40.00 |
200,000.00 |
|
|
|
|
|
|
| 724-02 |
pavement widening
|
4,238.7 |
SQYD |
40.00 |
169,548.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
156.0 |
CUYD |
50.00 |
7,800.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| 729-01 |
sign (type a)
|
120.0 |
SQFT |
38.00 |
4,560.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
36   |
EACH |
45.00 |
1,620.00 |
|
|
|
|
|
|
| 729-19-C |
dead end road installations(type c)
|
10   |
EACH |
425.00 |
4,250.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
720   |
EACH |
5.50 |
3,960.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
61   |
LNFT |
3.30 |
201.30 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.230 |
MILE |
2,100.00 |
23,583.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.520 |
MILE |
700.00 |
2,464.00 |
|
|
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
EACH |
500.00 |
2,000.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
37   |
EACH |
1.00 |
37.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
35   |
EACH |
110.00 |
3,850.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
135.00 |
135.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| S-001 |
cleaning existing ditches
|
25,000   |
LNFT |
1.00 |
25,000.00 |
|
|
|
|
|
|
| S-002 |
tree removal
|
10   |
EACH |
1,150.00 |
11,500.00 |
|
|
|
|
|
|
| S-003 |
scarifying, rolling and compacting roadbed
|
4,500   |
SQYD |
2.00 |
9,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,191,739.90 |
|
|
|
|
|
|
|