| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
- 3 - KOSTMAYER CONSTRUCTION, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
41   |
SQYD |
10.00 |
410.00 |
25.00 |
1,025.00 |
10.00 |
410.00 |
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
126.0 |
LNFT |
10.00 |
1,260.00 |
17.00 |
2,142.00 |
4.00 |
504.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
32,000.00 |
32,000.00 |
18,000.00 |
18,000.00 |
30,000.00 |
30,000.00 |
|
|
| 203-08 |
borrow
|
264   |
CUYD |
10.00 |
2,640.00 |
10.00 |
2,640.00 |
17.00 |
4,488.00 |
|
|
| 203-09 |
geotextile fabric
|
8,501   |
SQYD |
2.00 |
17,002.00 |
1.00 |
8,501.00 |
1.60 |
13,601.60 |
|
|
| 302-01-A |
class ii base course(410 stone)
|
5.0 |
CUYD |
65.00 |
325.00 |
172.00 |
860.00 |
60.00 |
300.00 |
|
|
| 302-01-B |
class ii base course (stone)
|
1,888.0 |
CUYD |
68.00 |
128,384.00 |
61.00 |
115,168.00 |
65.00 |
122,720.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,081.0 |
TON |
78.00 |
84,318.00 |
78.00 |
84,318.00 |
130.00 |
140,530.00 |
|
|
| 701-03-G |
storm drain pipe (18" cmp)
|
60   |
LNFT |
27.00 |
1,620.00 |
55.00 |
3,300.00 |
44.00 |
2,640.00 |
|
|
| 701-03-I-01 |
storm drain pipe (24" cmp)
|
50   |
LNFT |
32.00 |
1,600.00 |
70.00 |
3,500.00 |
49.00 |
2,450.00 |
|
|
| 701-03-I-02 |
storm drain pipe (24" rcp)
|
20   |
LNFT |
43.00 |
860.00 |
100.00 |
2,000.00 |
59.00 |
1,180.00 |
|
|
| 701-03-K |
storm drain pipe (30" cmp)
|
145   |
LNFT |
42.00 |
6,090.00 |
94.00 |
13,630.00 |
53.00 |
7,685.00 |
|
|
| 701-06-E |
side drain pipe arch (30" equiv. cmpa)
|
375   |
LNFT |
49.00 |
18,375.00 |
78.00 |
29,250.00 |
54.00 |
20,250.00 |
|
|
| 701-07-C |
yard drain pipe (8"cmp)
|
36   |
LNFT |
22.00 |
792.00 |
62.00 |
2,232.00 |
26.00 |
936.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
40   |
LNFT |
55.00 |
2,200.00 |
85.00 |
3,400.00 |
60.00 |
2,400.00 |
|
|
| 701-12-I |
corrugated metal pipe (extension)(24")
|
20   |
LNFT |
42.00 |
840.00 |
76.00 |
1,520.00 |
50.00 |
1,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
7   |
EACH |
1,700.00 |
11,900.00 |
3,000.00 |
21,000.00 |
2,600.00 |
18,200.00 |
|
|
| 705-06-A |
chain link fence (4-foot height)
|
230   |
LNFT |
12.00 |
2,760.00 |
25.00 |
5,750.00 |
24.00 |
5,520.00 |
|
|
| 705-07-A |
5-foot single gates for chain link fence (4-foot
height) |
1   |
EACH |
400.00 |
400.00 |
750.00 |
750.00 |
700.00 |
700.00 |
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
15.0 |
SQYD |
38.00 |
570.00 |
80.00 |
1,200.00 |
45.00 |
675.00 |
|
|
| 707-01 |
concrete curb
|
630.0 |
LNFT |
6.00 |
3,780.00 |
28.00 |
17,640.00 |
9.00 |
5,670.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
337.0 |
LNFT |
19.00 |
6,403.00 |
30.00 |
10,110.00 |
18.00 |
6,066.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
18,000.00 |
18,000.00 |
7,500.00 |
7,500.00 |
|
|
| 717-01 |
seeding (pensacola bahia)
|
70   |
LB |
20.00 |
1,400.00 |
5.00 |
350.00 |
12.00 |
840.00 |
|
|
| 718-01 |
fertilizer
|
70   |
LB |
10.00 |
700.00 |
1.00 |
70.00 |
6.00 |
420.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
37,000.00 |
37,000.00 |
20,000.00 |
20,000.00 |
21,000.00 |
21,000.00 |
|
|
| 729-01 |
sign (type a)
|
100.0 |
SQFT |
17.00 |
1,700.00 |
20.00 |
2,000.00 |
19.00 |
1,900.00 |
|
|
| 729-21 |
u-channel post
|
25   |
EACH |
90.00 |
2,250.00 |
100.00 |
2,500.00 |
100.00 |
2,500.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
966   |
LNFT |
3.40 |
3,284.40 |
4.00 |
3,864.00 |
5.00 |
4,830.00 |
|
|
| S-001 |
pipe bollard
|
5   |
EACH |
280.00 |
1,400.00 |
700.00 |
3,500.00 |
700.00 |
3,500.00 |
|
|
| S-002 |
tactile warning in concrete
|
432   |
SQFT |
42.00 |
18,144.00 |
70.00 |
30,240.00 |
60.00 |
25,920.00 |
|
|
| S-003 |
wheel stops
|
2   |
EACH |
70.00 |
140.00 |
40.00 |
80.00 |
67.00 |
134.00 |
|
|
| S-004 |
6" schedule 40 pipe cross drain
|
400   |
LNFT |
20.00 |
8,000.00 |
15.00 |
6,000.00 |
19.00 |
7,600.00 |
|
|
| S-005 |
special catch basin
|
4   |
EACH |
3,000.00 |
12,000.00 |
6,500.00 |
26,000.00 |
5,600.00 |
22,400.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
426,547.40 |
|
470,540.00 |
|
492,469.60 |
|
|
|