| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - SHILOH CONTRACTORS, INC. |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - GUINN BROTHERS, LLC. |
- 4 - F. MILLER & SONS, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
7,000.00 |
7,000.00 |
33,000.00 |
33,000.00 |
16,000.00 |
16,000.00 |
8,100.00 |
8,100.00 |
| 202-02-A-01 |
removal of bridge(sta.10+036;4.2 m x 7.3 m t.t.bridge)
|
1   |
ea |
3,000.00 |
3,000.00 |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
2,300.00 |
2,300.00 |
| 202-02-A-02 |
removal of bridge(sta.10+149;6.1 m x 17.7 m t.t.bridge)
|
1   |
ea |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
7,000.00 |
7,000.00 |
| 203-06 |
excavation & embankment
|
lump |
lump |
50,000.00 |
50,000.00 |
90,000.00 |
90,000.00 |
48,000.00 |
48,000.00 |
103,000.00 |
103,000.00 |
| 204-02 |
temporary hay or straw bales
|
63   |
ea |
5.00 |
315.00 |
7.00 |
441.00 |
10.00 |
630.00 |
8.00 |
504.00 |
| 204-03 |
temporary slope drains
|
40   |
ln m |
1.00 |
40.00 |
10.00 |
400.00 |
1.00 |
40.00 |
28.00 |
1,120.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
9   |
ea |
10.00 |
90.00 |
200.00 |
1,800.00 |
100.00 |
900.00 |
130.00 |
1,170.00 |
| 204-06 |
temporary silt fencing
|
103   |
ln m |
3.50 |
360.50 |
3.00 |
309.00 |
5.00 |
515.00 |
36.00 |
3,708.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
204.7 |
cu m |
85.00 |
17,399.50 |
40.00 |
8,188.00 |
80.00 |
16,376.00 |
60.00 |
12,282.00 |
| 701-02-I/J |
cross drain pipe arch (1350 mm equiv. rcpa or 1500 mm
equiv. cmpa) |
38.4 |
ln m |
400.00 |
15,360.00 |
600.00 |
23,040.00 |
700.00 |
26,880.00 |
465.00 |
17,856.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
155.00 |
4,724.40 |
150.00 |
4,572.00 |
170.00 |
5,181.60 |
160.00 |
4,876.80 |
| 704-09 |
guard rail anchor sections (turndown)
|
30.48 |
ln m |
88.00 |
2,682.24 |
90.00 |
2,743.20 |
95.00 |
2,895.60 |
90.00 |
2,743.20 |
| 711-01-D |
riprap (25 kg,460 mm thick)
|
708   |
sq m |
57.00 |
40,356.00 |
55.00 |
38,940.00 |
50.00 |
35,400.00 |
50.00 |
35,400.00 |
| 711-04 |
geotextile fabric
|
708   |
sq m |
2.75 |
1,947.00 |
3.00 |
2,124.00 |
5.00 |
3,540.00 |
3.00 |
2,124.00 |
| 712-02 |
sacked concrete revetment
|
68   |
sq m |
54.00 |
3,672.00 |
55.00 |
3,740.00 |
100.00 |
6,800.00 |
76.00 |
5,168.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
9,000.00 |
9,000.00 |
15,500.00 |
15,500.00 |
| 726-01-A |
bedding material(stone)
|
64.2 |
cu m |
85.00 |
5,457.00 |
65.00 |
4,173.00 |
85.00 |
5,457.00 |
75.00 |
4,815.00 |
| 727-01 |
mobilization
|
lump |
lump |
60,000.00 |
60,000.00 |
50,000.00 |
50,000.00 |
40,000.00 |
40,000.00 |
60,000.00 |
60,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
70.00 |
280.00 |
70.00 |
280.00 |
100.00 |
400.00 |
70.00 |
280.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
ea |
90.00 |
720.00 |
90.00 |
720.00 |
105.00 |
840.00 |
90.00 |
720.00 |
| 740-01 |
construction layout
|
lump |
lump |
8,000.00 |
8,000.00 |
2,500.00 |
2,500.00 |
15,000.00 |
15,000.00 |
30,500.00 |
30,500.00 |
| 804-01-F |
precast concrete piles (600 mm)
|
240.0 |
ln m |
375.00 |
90,000.00 |
300.00 |
72,000.00 |
345.00 |
82,800.00 |
486.00 |
116,640.00 |
| 804-12 |
loading permanent piles
|
1   |
ea |
FREE |
FREE |
500.00 |
500.00 |
1.00 |
1.00 |
100.00 |
100.00 |
| 805-01-F |
class a concrete (bents)
|
29.86 |
cu m |
780.00 |
23,290.80 |
800.00 |
23,888.00 |
900.00 |
26,874.00 |
636.00 |
18,990.96 |
| 805-03 |
class aa concrete
|
65.10 |
cu m |
830.00 |
54,033.00 |
650.00 |
42,315.00 |
750.00 |
48,825.00 |
575.00 |
37,432.50 |
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
177.75 |
ln m |
250.00 |
44,437.50 |
200.00 |
35,550.00 |
340.00 |
60,435.00 |
212.00 |
37,683.00 |
| 806-01 |
deformed reinforcing steel
|
10,558   |
kg |
1.90 |
20,060.20 |
2.00 |
21,116.00 |
2.20 |
23,227.60 |
2.60 |
27,450.80 |
| 807-06 |
structural metalwork
|
lump |
lump |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
9,000.00 |
9,000.00 |
16,000.00 |
16,000.00 |
| 810-01 |
concrete railing (barrier)
|
72.00 |
ln m |
145.00 |
10,440.00 |
150.00 |
10,800.00 |
180.00 |
12,960.00 |
210.00 |
15,120.00 |
| S-101 |
concrete approach slabs(90 degree crossing,7.3 m clear
roadway) |
2   |
ea |
7,000.00 |
14,000.00 |
7,000.00 |
14,000.00 |
8,000.00 |
16,000.00 |
6,000.00 |
12,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
500,665.14 |
|
511,139.20 |
|
524,977.80 |
|
600,584.26 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta.10+036;4.2 m x 7.3 m t.t.bridge)
|
1   |
ea |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 202-02-A-02 |
removal of bridge(sta.10+149;6.1 m x 17.7 m t.t.bridge)
|
1   |
ea |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
80,000.00 |
80,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
63   |
ea |
15.00 |
945.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
40   |
ln m |
75.00 |
3,000.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
9   |
ea |
250.00 |
2,250.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
103   |
ln m |
7.00 |
721.00 |
|
|
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
204.7 |
cu m |
80.00 |
16,376.00 |
|
|
|
|
|
|
| 701-02-I/J |
cross drain pipe arch (1350 mm equiv. rcpa or 1500 mm
equiv. cmpa) |
38.4 |
ln m |
600.00 |
23,040.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
175.00 |
5,334.00 |
|
|
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
30.48 |
ln m |
150.00 |
4,572.00 |
|
|
|
|
|
|
| 711-01-D |
riprap (25 kg,460 mm thick)
|
708   |
sq m |
60.00 |
42,480.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
708   |
sq m |
3.50 |
2,478.00 |
|
|
|
|
|
|
| 712-02 |
sacked concrete revetment
|
68   |
sq m |
85.00 |
5,780.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 726-01-A |
bedding material(stone)
|
64.2 |
cu m |
80.00 |
5,136.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
80,000.00 |
80,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
65.00 |
260.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
ea |
85.00 |
680.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| 804-01-F |
precast concrete piles (600 mm)
|
240.0 |
ln m |
275.00 |
66,000.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
ea |
10.00 |
10.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
29.86 |
cu m |
1,000.00 |
29,860.00 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
65.10 |
cu m |
800.00 |
52,080.00 |
|
|
|
|
|
|
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
177.75 |
ln m |
250.00 |
44,437.50 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
10,558   |
kg |
2.50 |
26,395.00 |
|
|
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
lump |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
72.00 |
ln m |
150.00 |
10,800.00 |
|
|
|
|
|
|
| S-101 |
concrete approach slabs(90 degree crossing,7.3 m clear
roadway) |
2   |
ea |
7,000.00 |
14,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
613,634.50 |
|
|
|
|
|
|
|