Letting of 3/30/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-64-0103
Parish: WINN
Routes:
Description: ALLBRITTON ROAD BRIDGES
Type Const: grading, drainage structures, concrete girder span bridge, and related work.
 
RankLicenseBidderAmount
112136 SHILOH CONTRACTORS, INC. $500,665.14
234567 JAMES CONSTRUCTION GROUP LLC $511,139.20
309090 GUINN BROTHERS, LLC. $524,977.80
400060 F. MILLER & SONS, LLC $600,584.26
512312 GILCHRIST CONSTRUCTION CO. LLC $613,634.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
SHILOH CONTRACTORS, INC.
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
GUINN BROTHERS, LLC.
- 4 -
F. MILLER & SONS, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 7,000.00 7,000.00 33,000.00 33,000.00 16,000.00 16,000.00 8,100.00 8,100.00
202-02-A-01 removal of bridge(sta.10+036;4.2 m x 7.3 m t.t.bridge) 1      ea 3,000.00 3,000.00 4,000.00 4,000.00 5,000.00 5,000.00 2,300.00 2,300.00
202-02-A-02 removal of bridge(sta.10+149;6.1 m x 17.7 m t.t.bridge) 1      ea 8,000.00 8,000.00 10,000.00 10,000.00 6,000.00 6,000.00 7,000.00 7,000.00
203-06 excavation & embankment lump      lump 50,000.00 50,000.00 90,000.00 90,000.00 48,000.00 48,000.00 103,000.00 103,000.00
204-02 temporary hay or straw bales 63      ea 5.00 315.00 7.00 441.00 10.00 630.00 8.00 504.00
204-03 temporary slope drains 40      ln m 1.00 40.00 10.00 400.00 1.00 40.00 28.00 1,120.00
204-05-A temporary sediment check dams (hay) 9      ea 10.00 90.00 200.00 1,800.00 100.00 900.00 130.00 1,170.00
204-06 temporary silt fencing 103      ln m 3.50 360.50 3.00 309.00 5.00 515.00 36.00 3,708.00
403-01 aggregate roadway surfacing (vehicular measurement) 204.7    cu m 85.00 17,399.50 40.00 8,188.00 80.00 16,376.00 60.00 12,282.00
701-02-I/J cross drain pipe arch (1350 mm equiv. rcpa or 1500 mm
equiv. cmpa)
38.4    ln m 400.00 15,360.00 600.00 23,040.00 700.00 26,880.00 465.00 17,856.00
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 155.00 4,724.40 150.00 4,572.00 170.00 5,181.60 160.00 4,876.80
704-09 guard rail anchor sections (turndown) 30.48   ln m 88.00 2,682.24 90.00 2,743.20 95.00 2,895.60 90.00 2,743.20
711-01-D riprap (25 kg,460 mm thick) 708      sq m 57.00 40,356.00 55.00 38,940.00 50.00 35,400.00 50.00 35,400.00
711-04 geotextile fabric 708      sq m 2.75 1,947.00 3.00 2,124.00 5.00 3,540.00 3.00 2,124.00
712-02 sacked concrete revetment 68      sq m 54.00 3,672.00 55.00 3,740.00 100.00 6,800.00 76.00 5,168.00
713-01 temporary signs & barricades lump      lump 5,000.00 5,000.00 5,000.00 5,000.00 9,000.00 9,000.00 15,500.00 15,500.00
726-01-A bedding material(stone) 64.2    cu m 85.00 5,457.00 65.00 4,173.00 85.00 5,457.00 75.00 4,815.00
727-01 mobilization lump      lump 60,000.00 60,000.00 50,000.00 50,000.00 40,000.00 40,000.00 60,000.00 60,000.00
729-16-B object marker assembly (type 2) 4      ea 70.00 280.00 70.00 280.00 100.00 400.00 70.00 280.00
729-16-C object marker assembly (type 3) 8      ea 90.00 720.00 90.00 720.00 105.00 840.00 90.00 720.00
740-01 construction layout lump      lump 8,000.00 8,000.00 2,500.00 2,500.00 15,000.00 15,000.00 30,500.00 30,500.00
804-01-F precast concrete piles (600 mm) 240.0    ln m 375.00 90,000.00 300.00 72,000.00 345.00 82,800.00 486.00 116,640.00
804-12 loading permanent piles 1      ea FREE FREE 500.00 500.00 1.00 1.00 100.00 100.00
805-01-F class a concrete (bents) 29.86   cu m 780.00 23,290.80 800.00 23,888.00 900.00 26,874.00 636.00 18,990.96
805-03 class aa concrete 65.10   cu m 830.00 54,033.00 650.00 42,315.00 750.00 48,825.00 575.00 37,432.50
805-08-H precast-prestressed concrete girders (type quad beam) 177.75   ln m 250.00 44,437.50 200.00 35,550.00 340.00 60,435.00 212.00 37,683.00
806-01 deformed reinforcing steel 10,558      kg 1.90 20,060.20 2.00 21,116.00 2.20 23,227.60 2.60 27,450.80
807-06 structural metalwork lump      lump 10,000.00 10,000.00 5,000.00 5,000.00 9,000.00 9,000.00 16,000.00 16,000.00
810-01 concrete railing (barrier) 72.00   ln m 145.00 10,440.00 150.00 10,800.00 180.00 12,960.00 210.00 15,120.00
S-101 concrete approach slabs(90 degree crossing,7.3 m clear
roadway)
2      ea 7,000.00 14,000.00 7,000.00 14,000.00 8,000.00 16,000.00 6,000.00 12,000.00
                       
 CONTRACTOR TOTAL       500,665.14   511,139.20   524,977.80   600,584.26
 
Item Number Item Description Quantity Unit of Measure - 5 -
GILCHRIST CONSTRUCTION CO. LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 50,000.00 50,000.00            
202-02-A-01 removal of bridge(sta.10+036;4.2 m x 7.3 m t.t.bridge) 1      ea 5,000.00 5,000.00            
202-02-A-02 removal of bridge(sta.10+149;6.1 m x 17.7 m t.t.bridge) 1      ea 5,000.00 5,000.00            
203-06 excavation & embankment lump      lump 80,000.00 80,000.00            
204-02 temporary hay or straw bales 63      ea 15.00 945.00            
204-03 temporary slope drains 40      ln m 75.00 3,000.00            
204-05-A temporary sediment check dams (hay) 9      ea 250.00 2,250.00            
204-06 temporary silt fencing 103      ln m 7.00 721.00            
403-01 aggregate roadway surfacing (vehicular measurement) 204.7    cu m 80.00 16,376.00            
701-02-I/J cross drain pipe arch (1350 mm equiv. rcpa or 1500 mm
equiv. cmpa)
38.4    ln m 600.00 23,040.00            
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 175.00 5,334.00            
704-09 guard rail anchor sections (turndown) 30.48   ln m 150.00 4,572.00            
711-01-D riprap (25 kg,460 mm thick) 708      sq m 60.00 42,480.00            
711-04 geotextile fabric 708      sq m 3.50 2,478.00            
712-02 sacked concrete revetment 68      sq m 85.00 5,780.00            
713-01 temporary signs & barricades lump      lump 10,000.00 10,000.00            
726-01-A bedding material(stone) 64.2    cu m 80.00 5,136.00            
727-01 mobilization lump      lump 80,000.00 80,000.00            
729-16-B object marker assembly (type 2) 4      ea 65.00 260.00            
729-16-C object marker assembly (type 3) 8      ea 85.00 680.00            
740-01 construction layout lump      lump 12,000.00 12,000.00            
804-01-F precast concrete piles (600 mm) 240.0    ln m 275.00 66,000.00            
804-12 loading permanent piles 1      ea 10.00 10.00            
805-01-F class a concrete (bents) 29.86   cu m 1,000.00 29,860.00            
805-03 class aa concrete 65.10   cu m 800.00 52,080.00            
805-08-H precast-prestressed concrete girders (type quad beam) 177.75   ln m 250.00 44,437.50            
806-01 deformed reinforcing steel 10,558      kg 2.50 26,395.00            
807-06 structural metalwork lump      lump 15,000.00 15,000.00            
810-01 concrete railing (barrier) 72.00   ln m 150.00 10,800.00            
S-101 concrete approach slabs(90 degree crossing,7.3 m clear
roadway)
2      ea 7,000.00 14,000.00            
                       
 CONTRACTOR TOTAL       613,634.50            