Lead Project: 713-43-0106
Parish: SABINE
Routes:
Description: SHUT EYE ROAD, LEWIS CREEK BRIDGE
Type Const: class ii base course, superpave asphaltic concrete, portland cement concrete slab
span bridge and related work.
 
RankLicenseBidderAmount
109090 GUINN BROTHERS, LLC. $311,850.20
212136 SHILOH CONTRACTORS, INC. $326,814.64
 
Item Number Item Description Quantity Unit of Measure - 1 -
GUINN BROTHERS, LLC.
- 2 -
SHILOH CONTRACTORS, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 8,000.00 8,000.00 5,000.00 5,000.00        
202-02-A-01 removal of bridge(sta. 10+000.000; 6.14m x 29.14m
timber bridge)
1      ea 7,000.00 7,000.00 10,000.00 10,000.00        
203-06 excavation & embankment lump      lump 17,000.00 17,000.00 18,000.00 18,000.00        
204-02 temporary hay or straw bales 40      ea 10.00 400.00 5.00 200.00        
204-03 temporary slope drains 50      ln m 10.00 500.00 2.00 100.00        
204-05-A temporary sediment check dams (hay) 8      ea 100.00 800.00 10.00 80.00        
204-06 temporary silt fencing 200      ln m 5.00 1,000.00 5.00 1,000.00        
302-01-A class ii base course (stone) 158.6    cu m 90.00 14,274.00 85.00 13,481.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
5      cu m 100.00 500.00 85.00 425.00        
502-01 superpave asphaltic concrete 130.0    Mg 150.00 19,500.00 150.00 19,500.00        
701-05-G side drain pipe (450 mm) 8.0    ln m 200.00 1,600.00 40.00 320.00        
701-05-G-01 side drain pipe (450 mm)(erosion) 20.0    ln m 200.00 4,000.00 40.00 800.00        
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 175.00 5,334.00 155.00 4,724.40        
704-09 guard rail anchor sections (turndown) 30.48   ln m 95.00 2,895.60 88.00 2,682.24        
705-01 barbed wire fence 14      ln m 75.00 1,050.00 18.00 252.00        
705-04 single swinging driveway gates 1      ea 500.00 500.00 500.00 500.00        
711-01-D riprap (25 kg)(460mm thick) 374      sq m 50.00 18,700.00 60.00 22,440.00        
711-04 geotextile fabric 374      sq m 5.00 1,870.00 3.00 1,122.00        
713-01 temporary signs & barricades lump      lump 6,500.00 6,500.00 3,500.00 3,500.00        
727-01 mobilization lump      lump 25,000.00 25,000.00 35,000.00 35,000.00        
729-16-C object marker assembly (type 3) 8      ea 100.00 800.00 90.00 720.00        
740-01 construction layout lump      lump 5,000.00 5,000.00 5,000.00 5,000.00        
804-01-B precast concrete piles (350 mm) 421.2    ln m 138.00 58,125.60 140.00 58,968.00        
804-12 loading permanent piles 1      ea 1.00 1.00 FREE FREE        
805-10-A bridge superstructure & substructure (7.3m clr. rdwy.
90 degree x-ing) (c.i.p.)
5      span 19,500.00 97,500.00 22,000.00 110,000.00        
S-101 concrete approach slabs (7.3m clr. rdwy. curved)
(c.i.p.)
2      ea 7,000.00 14,000.00 6,500.00 13,000.00        
                       
 CONTRACTOR TOTAL       311,850.20   326,814.64        