| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
2,226   |
LNFT |
3.25 |
7,234.50 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
3,790   |
CUYD |
13.40 |
50,786.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,551.7 |
TON |
150.00 |
232,755.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
205,489   |
SQYD |
0.66 |
135,622.74 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,442   |
CUYD |
1.00 |
- 1,442.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
16   |
LNFT |
200.00 |
3,200.00 |
|
|
|
|
|
|
| 701-10-O |
reinforced concrete pipe (extension)(48")
|
20   |
LNFT |
300.00 |
6,000.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
1,500.00 |
3,000.00 |
|
|
|
|
|
|
| 702-07-A |
cross drain safety end (type 1)
|
1   |
EACH |
750.00 |
750.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
300.0 |
LNFT |
23.00 |
6,900.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
3,100.0 |
LNFT |
14.75 |
45,725.00 |
|
|
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
37.5 |
LNFT |
85.00 |
3,187.50 |
|
|
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
75.0 |
LNFT |
37.00 |
2,775.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
250.0 |
LNFT |
44.00 |
11,000.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
16   |
EACH |
1,775.00 |
28,400.00 |
|
|
|
|
|
|
| 712-02 |
sacked concrete revetment
|
45   |
SQYD |
65.00 |
2,925.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,100.00 |
75,100.00 |
|
|
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,434   |
LNFT |
0.10 |
143.40 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
28.321 |
MILE |
1.00 |
28.32 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
28.644 |
MILE |
1.00 |
28.64 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
56.642 |
MILE |
1.00 |
56.64 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
8.27 |
ACRE |
550.00 |
4,548.50 |
|
|
|
|
|
|
| 717-01 |
seeding
|
248   |
LB |
5.00 |
1,240.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
8,270   |
LB |
0.18 |
1,488.60 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
11.5 |
CUYD |
110.00 |
1,265.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
75,100.00 |
75,100.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
55.00 |
440.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
68.00 |
1,088.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,072   |
EACH |
4.50 |
9,324.00 |
|
|
|
|
|
|
| 732-01-A-04 |
plastic pavement striping (dotted line)(4" width)
|
292   |
LNFT |
1.00 |
292.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,434   |
LNFT |
0.80 |
1,147.20 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
28.321 |
MILE |
1,750.00 |
49,561.75 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
14.322 |
MILE |
700.00 |
10,025.40 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| S-001 |
ultrathin hmac wearing course (3/4" inch thick)
|
205,489   |
SQYD |
4.80 |
986,347.20 |
|
|
|
|
|
|
| S-002 |
catch basin apron
|
16   |
EACH |
1,400.00 |
22,400.00 |
|
|
|
|
|
|
| S-003 |
selective clearing
|
lump |
LUMP |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| S-004 |
variable message sign unit
|
4   |
EACH |
4,000.00 |
16,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,817,943.39 |
|
|
|
|
|
|
|