Letting of 3/30/2005 LA DOTD Headquarters


REBID
go back
Go Back
 
Lead Project: 454-01-0074
Parish: E BATON ROUGE
Routes: I-12
Description: SPOT REPAIR
Type Const: cold planing asphaltic pavement, superpave asphaltic concrete pavement, cleaning
and resealing pavement joints, full depth patching, and related work.
 
RankLicenseBidderAmount
124901 HARD ROCK CONSTRUCTION CO. $548,938.10
221982 FORBY CONTRACTING, INC. $592,087.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
HARD ROCK CONSTRUCTION CO.
- 2 -
FORBY CONTRACTING, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
502-01 superpave asphaltic concrete 334.1    TON 50.00 16,705.00 150.00 50,115.00        
509-01 cold planing asphaltic pavement 3,438      SQYD 3.00 10,314.00 10.00 34,380.00        
602-02-A cleaning and resealing existing longitudinal pavement
joints
3,501      LNFT 2.00 7,002.00 2.00 7,002.00        
602-02-B cleaning and resealing existing transverse pavement
joints
3,001      LNFT 2.00 6,002.00 2.00 6,002.00        
602-03 cleaning and sealing random cracks 2,698      LNFT 2.00 5,396.00 5.00 13,490.00        
602-05-K-01 full depth patching of jointed conc pvmt (10" thick)
(16.0 sq yds & under)
500.0    SQYD 408.00 204,000.00 300.00 150,000.00        
602-05-K-02 full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds)
188.0    SQYD 408.00 76,704.00 275.00 51,700.00        
602-05-K-03 full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over)
192.0    SQYD 408.00 78,336.00 250.00 48,000.00        
713-01 temporary signs & barricades lump      LUMP 35,000.00 35,000.00 100,000.00 100,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.140  MILE 1,450.00 203.00 5,000.00 700.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.140  MILE 2,175.00 304.50 2,175.00 304.50        
713-05-A temporary pavement markings (solid line)(4" width) 0.280  MILE 4,350.00 1,218.00 4,350.00 1,218.00        
727-01 mobilization lump      LUMP 50,000.00 50,000.00 90,000.00 90,000.00        
731-02 reflectorized raised pavement markers 20      EACH 19.00 380.00 19.00 380.00        
732-02-A plastic pavement striping (solid line) (4" width) 0.280  MILE 2,200.00 616.00 7,280.00 2,038.40        
732-03-A plastic pavement striping (broken line)(4" width) 0.140  MILE 3,640.00 509.60 3,640.00 509.60        
740-01 construction layout lump      LUMP 18,000.00 18,000.00 10,000.00 10,000.00        
S-001 variable message sign unit 4      EACH 6,000.00 24,000.00 3,000.00 12,000.00        
S-922 sawing and sealing longitudinal joints in asphaltic
concrete overlay
2,218      LNFT 2.00 4,436.00 2.00 4,436.00        
S-923 sawing and sealing transverse joints in asphaltic
concrete overlay
1,344      LNFT 2.00 2,688.00 2.00 2,688.00        
S-927 sawcuts in asphaltic concrete lifts 3,562      LNFT 2.00 7,124.00 2.00 7,124.00        
                       
 CONTRACTOR TOTAL       548,938.10   592,087.50        