Letting of 3/30/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 432-01-0021
Parish: SABINE
Routes: LA 191
Description: JCT. LA 476 - CYPRESS BEND PKWY.
Type Const: grading, cold planing asph. concrete, pavement patching, asph. surface treatment,
lime treatment, cement treated base course, superpave asph. concrete overlay, and related work.
 
RankLicenseBidderAmount
108815 W. E. MCDONALD & SON, LLC. $1,997,370.98
212312 GILCHRIST CONSTRUCTION CO. LLC $2,114,666.90
312487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,165,532.03
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 75      SQYD 40.00 3,000.00 9.00 675.00 40.00 3,000.00    
202-02-H removal of guard rail 1,608      LNFT 3.00 4,824.00 3.50 5,628.00 3.50 5,628.00    
203-08 borrow (vehicular measurement) 3,513      CUYD 8.00 28,104.00 15.00 52,695.00 8.75 30,738.75    
203-08-A borrow (vehicular meas.)(selected soils) 332      CUYD 8.00 2,656.00 25.00 8,300.00 9.50 3,154.00    
303-02 removal of existing patches 200      SQYD 25.00 5,000.00 30.00 6,000.00 25.00 5,000.00    
304-01 lime 715.78   TON 130.00 93,051.40 100.00 71,578.00 120.00 85,893.60    
304-04-B lime treatment (type d) (8 1/2" thick) 58,006      SQYD 1.65 95,709.90 1.00 58,006.00 1.90 110,211.40    
401-02 aggregate surface course (adjusted vehicular
measurement)
2,644      CUYD 25.00 66,100.00 40.00 105,760.00 43.00 113,692.00    
502-01 superpave asphaltic concrete 18,428.0    TON 49.00 902,972.00 58.00 1,068,824.00 48.75 898,365.00    
502-01-A superpave asphaltic concrete (paved drives and
turnouts)
359.6    TON 100.00 35,960.00 90.00 32,364.00 100.00 35,960.00    
507-01-B asphaltic surface treatment (2 applications) 33,721      SQYD 2.60 87,674.60 3.00 101,163.00 3.00 101,163.00    
509-01 cold planing asphaltic pavement 43,293      SQYD 1.15 49,786.95 1.00 43,293.00 1.36 58,878.48    
509-02 contractor retained reclaimed asphaltic pavement - 1,510      CUYD 0.01 - 15.10 1.00 - 1,510.00 0.10 - 151.00    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 300.0    LNFT 32.00 9,600.00 34.00 10,200.00 37.00 11,100.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 868.0    LNFT 45.50 39,494.00 48.00 41,664.00 52.00 45,136.00    
704-03 blocked out guard rail 150.0    LNFT 16.00 2,400.00 18.00 2,700.00 18.50 2,775.00    
704-11-A guard rail end treatment (flared) 12      EACH 1,800.00 21,600.00 2,000.00 24,000.00 2,100.00 25,200.00    
706-02-C concrete drive (6" thick) 75.0    SQYD 75.00 5,625.00 50.00 3,750.00 75.00 5,625.00    
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 12,000.00 12,000.00 16,000.00 16,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
14.887  MILE 250.00 3,721.75 400.00 5,954.80 150.00 2,233.05    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
7.758  MILE 1.00 7.75 300.00 2,327.40 288.00 2,234.30    
713-05-A temporary pavement markings (solid line)(4" width) 48.439  MILE 1.00 48.43 450.00 21,797.55 460.00 22,281.94    
713-07 temporary reflectorized raised pavement markers 353      EACH 1.50 529.50 2.00 706.00 1.72 607.16    
717-01 seeding 45      LB 7.00 315.00 8.00 360.00 8.00 360.00    
718-01 fertilizer 1,000      LB 0.30 300.00 0.35 350.00 0.35 350.00    
720-01-A erosion control system, slope protection (type a) 100      SQYD 1.00 100.00 2.00 200.00 1.15 115.00    
721-01 asphalt mulch 2,420      GAL 1.50 3,630.00 2.00 4,840.00 1.72 4,162.40    
722-01 project site laboratory 1      EACH 3,000.00 3,000.00 5,000.00 5,000.00 13,000.00 13,000.00    
724-01-B pavement patching (12" minimum thickness) 200      SQYD 65.00 13,000.00 90.00 18,000.00 65.00 13,000.00    
727-01 mobilization lump      LUMP 158,000.00 158,000.00 60,000.00 60,000.00 200,000.00 200,000.00    
729-16-C object marker assembly (type 3) 12      EACH 68.00 816.00 75.00 900.00 80.00 960.00    
731-02 reflectorized raised pavement markers 773      EACH 3.50 2,705.50 5.00 3,865.00 5.17 3,996.41    
732-02-A plastic pavement striping (solid line) (4" width) 19.241  MILE 2,000.00 38,482.00 1,850.00 35,595.85 2,012.00 38,712.89    
732-03-A plastic pavement striping (broken line)(4" width) 2.904  MILE 1,000.00 2,904.00 700.00 2,032.80 750.00 2,178.00    
735-01 mailboxes 6      EACH 1.00 6.00 25.00 150.00 15.00 90.00    
735-02 mailbox supports (single) 5      EACH 175.00 875.00 175.00 875.00 150.00 750.00    
735-03 mailbox supports (double) 1      EACH 200.00 200.00 250.00 250.00 250.00 250.00    
740-01 construction layout lump      LUMP 15,000.00 15,000.00 10,000.00 10,000.00 17,000.00 17,000.00    
S-001 cement treated base course (12 in depth) 59,154      SQYD 4.60 272,108.40 4.75 280,981.50 4.75 280,981.50    
S-002 sawcuts in asphaltic concrete lifts 736      LNFT 1.50 1,104.00 2.00 1,472.00 0.57 419.52    
S-003 sawing and sealing transverse joints in asphaltic
concrete overlay
736      LNFT 2.00 1,472.00 3.00 2,208.00 1.03 758.08    
S-004 cleaning and re-sealing existing bridge deck joints 3,237      LNFT 1.70 5,502.90 3.00 9,711.00 1.15 3,722.55    
                       
 CONTRACTOR TOTAL       1,997,370.98   2,114,666.90   2,165,532.03    