| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
75   |
SQYD |
40.00 |
3,000.00 |
9.00 |
675.00 |
40.00 |
3,000.00 |
|
|
| 202-02-H |
removal of guard rail
|
1,608   |
LNFT |
3.00 |
4,824.00 |
3.50 |
5,628.00 |
3.50 |
5,628.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
3,513   |
CUYD |
8.00 |
28,104.00 |
15.00 |
52,695.00 |
8.75 |
30,738.75 |
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
332   |
CUYD |
8.00 |
2,656.00 |
25.00 |
8,300.00 |
9.50 |
3,154.00 |
|
|
| 303-02 |
removal of existing patches
|
200   |
SQYD |
25.00 |
5,000.00 |
30.00 |
6,000.00 |
25.00 |
5,000.00 |
|
|
| 304-01 |
lime
|
715.78 |
TON |
130.00 |
93,051.40 |
100.00 |
71,578.00 |
120.00 |
85,893.60 |
|
|
| 304-04-B |
lime treatment (type d) (8 1/2" thick)
|
58,006   |
SQYD |
1.65 |
95,709.90 |
1.00 |
58,006.00 |
1.90 |
110,211.40 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,644   |
CUYD |
25.00 |
66,100.00 |
40.00 |
105,760.00 |
43.00 |
113,692.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
18,428.0 |
TON |
49.00 |
902,972.00 |
58.00 |
1,068,824.00 |
48.75 |
898,365.00 |
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
359.6 |
TON |
100.00 |
35,960.00 |
90.00 |
32,364.00 |
100.00 |
35,960.00 |
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
33,721   |
SQYD |
2.60 |
87,674.60 |
3.00 |
101,163.00 |
3.00 |
101,163.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
43,293   |
SQYD |
1.15 |
49,786.95 |
1.00 |
43,293.00 |
1.36 |
58,878.48 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,510   |
CUYD |
0.01 |
- 15.10 |
1.00 |
- 1,510.00 |
0.10 |
- 151.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
300.0 |
LNFT |
32.00 |
9,600.00 |
34.00 |
10,200.00 |
37.00 |
11,100.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
868.0 |
LNFT |
45.50 |
39,494.00 |
48.00 |
41,664.00 |
52.00 |
45,136.00 |
|
|
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
16.00 |
2,400.00 |
18.00 |
2,700.00 |
18.50 |
2,775.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
1,800.00 |
21,600.00 |
2,000.00 |
24,000.00 |
2,100.00 |
25,200.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
75.0 |
SQYD |
75.00 |
5,625.00 |
50.00 |
3,750.00 |
75.00 |
5,625.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
12,000.00 |
12,000.00 |
16,000.00 |
16,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.887 |
MILE |
250.00 |
3,721.75 |
400.00 |
5,954.80 |
150.00 |
2,233.05 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.758 |
MILE |
1.00 |
7.75 |
300.00 |
2,327.40 |
288.00 |
2,234.30 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
48.439 |
MILE |
1.00 |
48.43 |
450.00 |
21,797.55 |
460.00 |
22,281.94 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
353   |
EACH |
1.50 |
529.50 |
2.00 |
706.00 |
1.72 |
607.16 |
|
|
| 717-01 |
seeding
|
45   |
LB |
7.00 |
315.00 |
8.00 |
360.00 |
8.00 |
360.00 |
|
|
| 718-01 |
fertilizer
|
1,000   |
LB |
0.30 |
300.00 |
0.35 |
350.00 |
0.35 |
350.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
100   |
SQYD |
1.00 |
100.00 |
2.00 |
200.00 |
1.15 |
115.00 |
|
|
| 721-01 |
asphalt mulch
|
2,420   |
GAL |
1.50 |
3,630.00 |
2.00 |
4,840.00 |
1.72 |
4,162.40 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
13,000.00 |
13,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
200   |
SQYD |
65.00 |
13,000.00 |
90.00 |
18,000.00 |
65.00 |
13,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
158,000.00 |
158,000.00 |
60,000.00 |
60,000.00 |
200,000.00 |
200,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
68.00 |
816.00 |
75.00 |
900.00 |
80.00 |
960.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
773   |
EACH |
3.50 |
2,705.50 |
5.00 |
3,865.00 |
5.17 |
3,996.41 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
19.241 |
MILE |
2,000.00 |
38,482.00 |
1,850.00 |
35,595.85 |
2,012.00 |
38,712.89 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.904 |
MILE |
1,000.00 |
2,904.00 |
700.00 |
2,032.80 |
750.00 |
2,178.00 |
|
|
| 735-01 |
mailboxes
|
6   |
EACH |
1.00 |
6.00 |
25.00 |
150.00 |
15.00 |
90.00 |
|
|
| 735-02 |
mailbox supports (single)
|
5   |
EACH |
175.00 |
875.00 |
175.00 |
875.00 |
150.00 |
750.00 |
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
200.00 |
200.00 |
250.00 |
250.00 |
250.00 |
250.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
17,000.00 |
17,000.00 |
|
|
| S-001 |
cement treated base course (12 in depth)
|
59,154   |
SQYD |
4.60 |
272,108.40 |
4.75 |
280,981.50 |
4.75 |
280,981.50 |
|
|
| S-002 |
sawcuts in asphaltic concrete lifts
|
736   |
LNFT |
1.50 |
1,104.00 |
2.00 |
1,472.00 |
0.57 |
419.52 |
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
736   |
LNFT |
2.00 |
1,472.00 |
3.00 |
2,208.00 |
1.03 |
758.08 |
|
|
| S-004 |
cleaning and re-sealing existing bridge deck joints
|
3,237   |
LNFT |
1.70 |
5,502.90 |
3.00 |
9,711.00 |
1.15 |
3,722.55 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,997,370.98 |
|
2,114,666.90 |
|
2,165,532.03 |
|
|
|