Letting of 3/30/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 420-01-0025
Parish: CADDO, BOSSIER
Routes: LA 3032
Description: SHREVEPORT-BARKSDALE INTERCHANGE & W.B. RED RIVER BRIDGE
Type Const: grading, class ii base course, portland cement concrete pavement, drainage structures,
precast prestressed concrete girder span bridge and related work.
 
RankLicenseBidderAmount
142076 AUSTIN BRIDGE & ROAD, LP $24,487,919.43
234567 JAMES CONSTRUCTION GROUP LLC $25,632,040.45
328665 GILBERT SOUTHERN CORP $29,832,053.43
 
Item Number Item Description Quantity Unit of Measure - 1 -
AUSTIN BRIDGE & ROAD, LP
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
GILBERT SOUTHERN CORP

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 250,000.00 250,000.00 570,000.00 570,000.00 82,500.00 82,500.00    
202-01 removal of structures & obstructions lump      LUMP 26,000.00 26,000.00 8,000.00 8,000.00 27,500.00 27,500.00    
202-02-A removal of bridges 1      EACH 2,000,000.00 2,000,000.00 3,250,000.00 3,250,000.00 1,000,000.00 1,000,000.00    
202-02-E removal of concrete curbs 479.0    LNFT 2.00 958.00 4.00 1,916.00 2.00 958.00    
202-02-G removal of surfacing & stabilized base 4,606.5    SQYD 3.00 13,819.50 2.00 9,213.00 3.00 13,819.50    
202-02-01 removal of brick residence on concrete slab (rt of sta
54+00 ramp "c"; 57.0' x 40.0')
1      EACH 5,000.00 5,000.00 7,000.00 7,000.00 3,300.00 3,300.00    
202-02-02 removal of 2-story business on conc foundation(rt of
sta 55+00 ramp "c"; 8836 sqft ground floor,
2724 sqft upstairs)
1      EACH 15,000.00 15,000.00 15,000.00 15,000.00 11,000.00 11,000.00    
202-02-03 removal of brick residence on concrete slab (rt of sta
53+00 ramp "c"; 74.0' x 42.0')
1      EACH 8,000.00 8,000.00 9,000.00 9,000.00 4,400.00 4,400.00    
203-01 general excavation 17,865      CUYD 5.30 94,684.50 3.00 53,595.00 6.00 107,190.00    
203-04 embankment 96,940      CUYD 9.20 891,848.00 8.00 775,520.00 9.00 872,460.00    
204-03 temporary slope drains 180      LNFT 21.00 3,780.00 11.00 1,980.00 22.00 3,960.00    
204-04 temporary sediment basins 7      EACH 1,600.00 11,200.00 1,300.00 9,100.00 1,650.00 11,550.00    
204-05-A temporary sediment check dams (hay) 6      EACH 140.00 840.00 200.00 1,200.00 150.00 900.00    
204-05-B temporary sediment check dams (stone) 12      EACH 420.00 5,040.00 400.00 4,800.00 440.00 5,280.00    
204-06 temporary silt fencing 3,150      LNFT 1.60 5,040.00 2.50 7,875.00 2.00 6,300.00    
302-02-E class ii base course (4" thick) 2,536.0    SQYD 7.40 18,766.40 10.00 25,360.00 8.00 20,288.00    
302-02-G class ii base course (8" thick) 29,180.1    SQYD 12.10 353,079.21 14.00 408,521.40 13.00 379,341.30    
304-01 lime 155.50   TON 116.00 18,038.00 110.00 17,105.00 121.00 18,815.50    
304-04-D lime treatment (type d) (12" thick) 9,873      SQYD 4.20 41,466.60 1.00 9,873.00 5.00 49,365.00    
502-01 superpave asphaltic concrete 713.5    TON 119.00 84,906.50 100.00 71,350.00 70.00 49,945.00    
502-03-A superpave asphaltic concrete (variable thick) 112      SQYD 155.00 17,360.00 130.00 14,560.00 50.00 5,600.00    
502-03-B superpave asphaltic concrete (1.5" thick) 108      SQYD 30.00 3,240.00 30.00 3,240.00 105.00 11,340.00    
601-01-I portland cement concrete pavement (9" thick) 25,843.4    SQYD 45.00 1,162,953.00 48.00 1,240,483.20 47.00 1,214,639.80    
601-01-K portland cement concrete pavement (10" thick) 5,702.4    SQYD 48.00 273,715.20 51.00 290,822.40 51.00 290,822.40    
601-03 portland cement concrete shoulder (variable thick) 1,426.6    SQYD 47.00 67,050.20 60.00 85,596.00 50.00 71,330.00    
701-03-G storm drain pipe (18" rcp/pcp) 445      LNFT 35.00 15,575.00 35.00 15,575.00 36.00 16,020.00    
701-03-I storm drain pipe (24" rcp/pcp) 325      LNFT 45.00 14,625.00 43.00 13,975.00 47.00 15,275.00    
701-03-P storm drain pipe (54" rcp/pcp) 240      LNFT 152.00 36,480.00 150.00 36,000.00 160.00 38,400.00    
701-03-Q storm drain pipe (60" rcp/pcp) 425      LNFT 184.00 78,200.00 180.00 76,500.00 193.00 82,025.00    
702-03-A catch basins (cb-01) 9      EACH 3,700.00 33,300.00 3,500.00 31,500.00 3,850.00 34,650.00    
702-03-B catch basins (cb-02) 1      EACH 5,300.00 5,300.00 5,000.00 5,000.00 5,500.00 5,500.00    
702-04-A adjusting manholes 1      EACH 1,100.00 1,100.00 1,000.00 1,000.00 1,100.00 1,100.00    
702-04-B adjusting catch basins 1      EACH 1,600.00 1,600.00 1,500.00 1,500.00 1,650.00 1,650.00    
703-01 shoulder underdrain systems 4,933      LNFT 10.50 51,796.50 8.00 39,464.00 11.00 54,263.00    
703-02 shoulder outlet underdrains 29      EACH 526.00 15,254.00 250.00 7,250.00 550.00 15,950.00    
704-03 blocked out guard rail 50.0    LNFT 19.00 950.00 20.00 1,000.00 20.00 1,000.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 56.00 5,600.00 50.00 5,000.00 50.00 5,000.00    
704-11-A guard rail end treatment (flared) 2      EACH 2,000.00 4,000.00 2,500.00 5,000.00 1,950.00 3,900.00    
705-04 single swinging driveway gates 2      EACH 2,600.00 5,200.00 1,000.00 2,000.00 500.00 1,000.00    
705-06-B chain link fence (5-foot height) 2,190      LNFT 7.70 16,863.00 15.00 32,850.00 35.00 76,650.00    
706-03-C incidental concrete paving (6" thick) 2,536.0    SQYD 36.00 91,296.00 38.00 96,368.00 37.00 93,832.00    
706-03-D incidental concrete paving (variable thick) 58.8    SQYD 38.00 2,234.40 44.00 2,587.20 40.00 2,352.00    
707-01 concrete curb 2,024.2    LNFT 5.00 10,121.00 7.00 14,169.40 6.00 12,145.20    
712-04 flexible revetment 590      SQYD 34.00 20,060.00 33.00 19,470.00 40.00 23,600.00    
713-01 temporary signs & barricades lump      LUMP 87,000.00 87,000.00 75,000.00 75,000.00 500,000.00 500,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
1.200  MILE 5,000.00 6,000.00 1,500.00 1,800.00 500.00 600.00    
713-04-A-01 temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable)
1.500  MILE 5,000.00 7,500.00 11,000.00 16,500.00 750.00 1,125.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.000  MILE 280.00 840.00 275.00 825.00 275.00 825.00    
713-04-B-01 temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable)
8.400  MILE 7,000.00 58,800.00 7,250.00 60,900.00 7,250.00 60,900.00    
713-05-A temporary pavement markings (solid line)(4" width) 2.200  MILE 510.00 1,122.00 500.00 1,100.00 495.00 1,089.00    
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type i removable)
8.400  MILE 10,000.00 84,000.00 10,000.00 84,000.00 9,768.00 82,051.20    
713-07 temporary reflectorized raised pavement markers 655      EACH 3.00 1,965.00 3.00 1,965.00 3.00 1,965.00    
713-09 temporary precast concrete barrier (department
furnished)
264      EACH 89.00 23,496.00 100.00 26,400.00 150.00 39,600.00    
716-01-A mulch (vegetative) 42.12   ACRE 690.00 29,062.80 750.00 31,590.00 725.00 30,537.00    
717-01 seeding 2,495      LB 8.00 19,960.00 7.00 17,465.00 9.00 22,455.00    
718-01 fertilizer 82,600      LB 0.30 24,780.00 0.30 24,780.00 0.35 28,910.00    
720-01-A erosion control system, slope protection (type a) 4,538      SQYD 1.10 4,991.80 1.50 6,807.00 1.00 4,538.00    
720-01-B erosion control system, slope protection (type b) 3,730      SQYD 1.10 4,103.00 1.50 5,595.00 1.00 3,730.00    
720-01-C erosion control system, flexible channel liner (type c) 262      SQYD 1.60 419.20 2.50 655.00 1.50 393.00    
720-01-D erosion control system, flexible channel liner (type d) 230      SQYD 1.60 368.00 2.50 575.00 1.50 345.00    
720-01-E erosion control system, flexible channel liner (type e) 164      SQYD 5.30 869.20 2.50 410.00 6.00 984.00    
720-01-F erosion control system, flexible channel liner (type f) 131      SQYD 5.30 694.30 3.00 393.00 6.00 786.00    
722-01 project site laboratory 1      EACH 50,000.00 50,000.00 20,000.00 20,000.00 50,000.00 50,000.00    
725-01 temporary detour roads 435.0    LNFT 105.00 45,675.00 135.00 58,725.00 110.00 47,850.00    
727-01 mobilization lump      LUMP 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 2,972,000.00 2,972,000.00    
729-16-A object marker assembly (type 1) 4      EACH 57.00 228.00 55.00 220.00 70.00 280.00    
729-16-C object marker assembly (type 3) 4      EACH 73.00 292.00 70.00 280.00 70.00 280.00    
729-19-B dead end road installations(type b) 1      EACH 1,100.00 1,100.00 1,250.00 1,250.00 1,050.00 1,050.00    
730-01 trenching and backfilling 200      LNFT 6.00 1,200.00 1.20 240.00 6.00 1,200.00    
730-02-A conduit (1-1/2" rigid aluminum on bridge structure) 600      LNFT 13.00 7,800.00 2.40 1,440.00 12.85 7,710.00    
730-02-B conduit (1-1/2" dia sch 40 pvc in bridge structure) 5,900      LNFT 4.60 27,140.00 1.50 8,850.00 4.50 26,550.00    
730-02-C conductors (#4 xhhw) 12,000      LNFT 1.30 15,600.00 1.00 12,000.00 1.25 15,000.00    
730-02-D conductors (#6 bare ground for underground) 200      LNFT 1.00 200.00 1.00 200.00 1.00 200.00    
730-02-E conductors (#6 green insulated ground for inside
bridge deck)
2,800      LNFT 1.00 2,800.00 1.00 2,800.00 1.00 2,800.00    
730-05 light pole (16'-0" mt. ht.structure mount with tenion) 20      EACH 1,500.00 30,000.00 2,000.00 40,000.00 1,430.00 28,600.00    
730-07 luminaire (250 watt m.h., colonial style roadway) 20      EACH 1,100.00 22,000.00 1,500.00 30,000.00 1,100.00 22,000.00    
730-08 electrical service point (pedestal mounted controller) 1      EACH 7,300.00 7,300.00 9,000.00 9,000.00 7,060.00 7,060.00    
730-16 underground junction box (11"x 17") 1      EACH 590.00 590.00 600.00 600.00 575.00 575.00    
730-17 structure mounted junction box (8"x 8"x 4") 4      EACH 780.00 3,120.00 500.00 2,000.00 755.00 3,020.00    
731-01 nonreflectorized raised pavement markers 616      EACH 9.00 5,544.00 9.00 5,544.00 9.00 5,544.00    
731-02 reflectorized raised pavement markers 649      EACH 5.40 3,504.60 6.00 3,894.00 5.20 3,374.80    
732-01-C-01 plastic pavement striping (8" width) preformed marking
tape (type v)
3,160      LNFT 5.00 15,800.00 5.00 15,800.00 4.85 15,326.00    
732-01-E-01 plastic pavement striping (24" width) preformed
marking tape (type v)
379      LNFT 15.00 5,685.00 15.00 5,685.00 14.55 5,514.45    
732-02-A-01 plastic pvmt striping (solid line)(4" width) preformed
marking tape (type v)
4.350  MILE 13,000.00 56,550.00 12,000.00 52,200.00 12,936.00 56,271.60    
732-02-C-01 plast pavement striping (solid line)(8"width)
preformed marking tape (type v)
0.177  MILE 27,000.00 4,779.00 25,000.00 4,425.00 25,872.00 4,579.34    
732-02-E-01 plast pavement striping (solid line)(24"width)
preformed marking tape (type v)
0.059  MILE 80,000.00 4,720.00 75,000.00 4,425.00 77,616.00 4,579.34    
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
0.839  MILE 7,000.00 5,873.00 7,500.00 6,292.50 6,468.00 5,426.65    
732-05 removal of existing markings 8.400  MILE 3,000.00 25,200.00 2,900.00 24,360.00 2,900.00 24,360.00    
740-01 construction layout lump      LUMP 250,000.00 250,000.00 75,000.00 75,000.00 500,000.00 500,000.00    
802-01 structural excavation 488.3    CUYD 7.00 3,418.10 35.00 17,090.50 17.50 8,545.25    
802-02 structural excavation for intermediate bents 1,715.0    CUYD 78.00 133,770.00 35.00 60,025.00 25.00 42,875.00    
804-03-D steel piles (hp 12 x 53) 24,368      LNFT 32.00 779,776.00 30.00 731,040.00 25.00 609,200.00    
804-12 loading permanent piles 1      EACH 13,000.00 13,000.00 1,000.00 1,000.00 25,000.00 25,000.00    
805-01-D class a concrete (footings) 963.85   CUYD 254.00 244,817.90 300.00 289,155.00 400.00 385,540.00    
805-01-F class a concrete (bents) 1,534.07   CUYD 483.00 740,955.81 500.00 767,035.00 1,000.00 1,534,070.00    
805-02 class a(m) concrete 129.90   CUYD 691.00 89,760.90 700.00 90,930.00 1,000.00 129,900.00    
805-06 class r concrete 75.20   CUYD 152.00 11,430.40 150.00 11,280.00 250.00 18,800.00    
805-08-C precast-prestressed concrete girders (type iii) 8,532.4    LNFT 102.00 870,304.80 85.00 725,254.00 100.00 853,240.00    
805-11 strip seal joints 488.00   LNFT 111.00 54,168.00 80.00 39,040.00 125.00 61,000.00    
806-01 deformed reinforcing steel 913,188      LB 0.70 639,231.60 0.65 593,572.20 0.75 684,891.00    
806-02 deformed reinforcing steel (epoxy coated) 516,743      LB 0.80 413,394.40 0.75 387,557.25 0.90 465,068.70    
807-06 structural metalwork lump      LUMP 8,737,000.00 8,737,000.00 8,700,000.00 8,700,000.00 11,520,000.00 11,520,000.00    
813-01 concrete approach slabs 502.52   SQYD 117.00 58,794.84 150.00 75,378.00 150.00 75,378.00    
S-001 control gate precast concrete cover (class p(m)
concrete)
1      EACH 3,600.00 3,600.00 5,000.00 5,000.00 1,000.00 1,000.00    
S-002 glare paddles 600      lnft 11.00 6,600.00 8.00 4,800.00 17.43 10,458.00    
S-104 class aa high performance concrete (hpc) 3,526.53   CUYD 571.00 2,013,648.63 600.00 2,115,918.00 1,000.00 3,526,530.00    
S-105 high performance concrete (hpc) railing (barrier) 5,541.41   LNFT 54.00 299,236.14 40.00 221,656.40 40.00 221,656.40    
S-106 light support base 20      EACH 2,600.00 52,000.00 450.00 9,000.00 500.00 10,000.00    
S-107 removal of concrete at piers 310      CUYD 300.00 93,000.00 800.00 248,000.00 1,000.00 310,000.00    
                       
 CONTRACTOR TOTAL       24,487,919.43   25,632,040.45   29,832,053.43    