| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - AUSTIN BRIDGE & ROAD, LP |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - GILBERT SOUTHERN CORP |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
250,000.00 |
250,000.00 |
570,000.00 |
570,000.00 |
82,500.00 |
82,500.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
26,000.00 |
26,000.00 |
8,000.00 |
8,000.00 |
27,500.00 |
27,500.00 |
|
|
| 202-02-A |
removal of bridges
|
1   |
EACH |
2,000,000.00 |
2,000,000.00 |
3,250,000.00 |
3,250,000.00 |
1,000,000.00 |
1,000,000.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
479.0 |
LNFT |
2.00 |
958.00 |
4.00 |
1,916.00 |
2.00 |
958.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
4,606.5 |
SQYD |
3.00 |
13,819.50 |
2.00 |
9,213.00 |
3.00 |
13,819.50 |
|
|
| 202-02-01 |
removal of brick residence on concrete slab (rt of sta
54+00 ramp "c"; 57.0' x 40.0') |
1   |
EACH |
5,000.00 |
5,000.00 |
7,000.00 |
7,000.00 |
3,300.00 |
3,300.00 |
|
|
| 202-02-02 |
removal of 2-story business on conc foundation(rt of
sta 55+00 ramp "c"; 8836 sqft ground floor, 2724 sqft upstairs) |
1   |
EACH |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
11,000.00 |
11,000.00 |
|
|
| 202-02-03 |
removal of brick residence on concrete slab (rt of sta
53+00 ramp "c"; 74.0' x 42.0') |
1   |
EACH |
8,000.00 |
8,000.00 |
9,000.00 |
9,000.00 |
4,400.00 |
4,400.00 |
|
|
| 203-01 |
general excavation
|
17,865   |
CUYD |
5.30 |
94,684.50 |
3.00 |
53,595.00 |
6.00 |
107,190.00 |
|
|
| 203-04 |
embankment
|
96,940   |
CUYD |
9.20 |
891,848.00 |
8.00 |
775,520.00 |
9.00 |
872,460.00 |
|
|
| 204-03 |
temporary slope drains
|
180   |
LNFT |
21.00 |
3,780.00 |
11.00 |
1,980.00 |
22.00 |
3,960.00 |
|
|
| 204-04 |
temporary sediment basins
|
7   |
EACH |
1,600.00 |
11,200.00 |
1,300.00 |
9,100.00 |
1,650.00 |
11,550.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
140.00 |
840.00 |
200.00 |
1,200.00 |
150.00 |
900.00 |
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
12   |
EACH |
420.00 |
5,040.00 |
400.00 |
4,800.00 |
440.00 |
5,280.00 |
|
|
| 204-06 |
temporary silt fencing
|
3,150   |
LNFT |
1.60 |
5,040.00 |
2.50 |
7,875.00 |
2.00 |
6,300.00 |
|
|
| 302-02-E |
class ii base course (4" thick)
|
2,536.0 |
SQYD |
7.40 |
18,766.40 |
10.00 |
25,360.00 |
8.00 |
20,288.00 |
|
|
| 302-02-G |
class ii base course (8" thick)
|
29,180.1 |
SQYD |
12.10 |
353,079.21 |
14.00 |
408,521.40 |
13.00 |
379,341.30 |
|
|
| 304-01 |
lime
|
155.50 |
TON |
116.00 |
18,038.00 |
110.00 |
17,105.00 |
121.00 |
18,815.50 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
9,873   |
SQYD |
4.20 |
41,466.60 |
1.00 |
9,873.00 |
5.00 |
49,365.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
713.5 |
TON |
119.00 |
84,906.50 |
100.00 |
71,350.00 |
70.00 |
49,945.00 |
|
|
| 502-03-A |
superpave asphaltic concrete (variable thick)
|
112   |
SQYD |
155.00 |
17,360.00 |
130.00 |
14,560.00 |
50.00 |
5,600.00 |
|
|
| 502-03-B |
superpave asphaltic concrete (1.5" thick)
|
108   |
SQYD |
30.00 |
3,240.00 |
30.00 |
3,240.00 |
105.00 |
11,340.00 |
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
25,843.4 |
SQYD |
45.00 |
1,162,953.00 |
48.00 |
1,240,483.20 |
47.00 |
1,214,639.80 |
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
5,702.4 |
SQYD |
48.00 |
273,715.20 |
51.00 |
290,822.40 |
51.00 |
290,822.40 |
|
|
| 601-03 |
portland cement concrete shoulder (variable thick)
|
1,426.6 |
SQYD |
47.00 |
67,050.20 |
60.00 |
85,596.00 |
50.00 |
71,330.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
445   |
LNFT |
35.00 |
15,575.00 |
35.00 |
15,575.00 |
36.00 |
16,020.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
325   |
LNFT |
45.00 |
14,625.00 |
43.00 |
13,975.00 |
47.00 |
15,275.00 |
|
|
| 701-03-P |
storm drain pipe (54" rcp/pcp)
|
240   |
LNFT |
152.00 |
36,480.00 |
150.00 |
36,000.00 |
160.00 |
38,400.00 |
|
|
| 701-03-Q |
storm drain pipe (60" rcp/pcp)
|
425   |
LNFT |
184.00 |
78,200.00 |
180.00 |
76,500.00 |
193.00 |
82,025.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
9   |
EACH |
3,700.00 |
33,300.00 |
3,500.00 |
31,500.00 |
3,850.00 |
34,650.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
5,300.00 |
5,300.00 |
5,000.00 |
5,000.00 |
5,500.00 |
5,500.00 |
|
|
| 702-04-A |
adjusting manholes
|
1   |
EACH |
1,100.00 |
1,100.00 |
1,000.00 |
1,000.00 |
1,100.00 |
1,100.00 |
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
1,600.00 |
1,600.00 |
1,500.00 |
1,500.00 |
1,650.00 |
1,650.00 |
|
|
| 703-01 |
shoulder underdrain systems
|
4,933   |
LNFT |
10.50 |
51,796.50 |
8.00 |
39,464.00 |
11.00 |
54,263.00 |
|
|
| 703-02 |
shoulder outlet underdrains
|
29   |
EACH |
526.00 |
15,254.00 |
250.00 |
7,250.00 |
550.00 |
15,950.00 |
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
19.00 |
950.00 |
20.00 |
1,000.00 |
20.00 |
1,000.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
56.00 |
5,600.00 |
50.00 |
5,000.00 |
50.00 |
5,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,000.00 |
4,000.00 |
2,500.00 |
5,000.00 |
1,950.00 |
3,900.00 |
|
|
| 705-04 |
single swinging driveway gates
|
2   |
EACH |
2,600.00 |
5,200.00 |
1,000.00 |
2,000.00 |
500.00 |
1,000.00 |
|
|
| 705-06-B |
chain link fence (5-foot height)
|
2,190   |
LNFT |
7.70 |
16,863.00 |
15.00 |
32,850.00 |
35.00 |
76,650.00 |
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
2,536.0 |
SQYD |
36.00 |
91,296.00 |
38.00 |
96,368.00 |
37.00 |
93,832.00 |
|
|
| 706-03-D |
incidental concrete paving (variable thick)
|
58.8 |
SQYD |
38.00 |
2,234.40 |
44.00 |
2,587.20 |
40.00 |
2,352.00 |
|
|
| 707-01 |
concrete curb
|
2,024.2 |
LNFT |
5.00 |
10,121.00 |
7.00 |
14,169.40 |
6.00 |
12,145.20 |
|
|
| 712-04 |
flexible revetment
|
590   |
SQYD |
34.00 |
20,060.00 |
33.00 |
19,470.00 |
40.00 |
23,600.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
87,000.00 |
87,000.00 |
75,000.00 |
75,000.00 |
500,000.00 |
500,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.200 |
MILE |
5,000.00 |
6,000.00 |
1,500.00 |
1,800.00 |
500.00 |
600.00 |
|
|
| 713-04-A-01 |
temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable) |
1.500 |
MILE |
5,000.00 |
7,500.00 |
11,000.00 |
16,500.00 |
750.00 |
1,125.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.000 |
MILE |
280.00 |
840.00 |
275.00 |
825.00 |
275.00 |
825.00 |
|
|
| 713-04-B-01 |
temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable) |
8.400 |
MILE |
7,000.00 |
58,800.00 |
7,250.00 |
60,900.00 |
7,250.00 |
60,900.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
2.200 |
MILE |
510.00 |
1,122.00 |
500.00 |
1,100.00 |
495.00 |
1,089.00 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
8.400 |
MILE |
10,000.00 |
84,000.00 |
10,000.00 |
84,000.00 |
9,768.00 |
82,051.20 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
655   |
EACH |
3.00 |
1,965.00 |
3.00 |
1,965.00 |
3.00 |
1,965.00 |
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
264   |
EACH |
89.00 |
23,496.00 |
100.00 |
26,400.00 |
150.00 |
39,600.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
42.12 |
ACRE |
690.00 |
29,062.80 |
750.00 |
31,590.00 |
725.00 |
30,537.00 |
|
|
| 717-01 |
seeding
|
2,495   |
LB |
8.00 |
19,960.00 |
7.00 |
17,465.00 |
9.00 |
22,455.00 |
|
|
| 718-01 |
fertilizer
|
82,600   |
LB |
0.30 |
24,780.00 |
0.30 |
24,780.00 |
0.35 |
28,910.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
4,538   |
SQYD |
1.10 |
4,991.80 |
1.50 |
6,807.00 |
1.00 |
4,538.00 |
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
3,730   |
SQYD |
1.10 |
4,103.00 |
1.50 |
5,595.00 |
1.00 |
3,730.00 |
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
262   |
SQYD |
1.60 |
419.20 |
2.50 |
655.00 |
1.50 |
393.00 |
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
230   |
SQYD |
1.60 |
368.00 |
2.50 |
575.00 |
1.50 |
345.00 |
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
164   |
SQYD |
5.30 |
869.20 |
2.50 |
410.00 |
6.00 |
984.00 |
|
|
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
131   |
SQYD |
5.30 |
694.30 |
3.00 |
393.00 |
6.00 |
786.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
50,000.00 |
50,000.00 |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
|
|
| 725-01 |
temporary detour roads
|
435.0 |
LNFT |
105.00 |
45,675.00 |
135.00 |
58,725.00 |
110.00 |
47,850.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
2,500,000.00 |
2,500,000.00 |
2,500,000.00 |
2,500,000.00 |
2,972,000.00 |
2,972,000.00 |
|
|
| 729-16-A |
object marker assembly (type 1)
|
4   |
EACH |
57.00 |
228.00 |
55.00 |
220.00 |
70.00 |
280.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
73.00 |
292.00 |
70.00 |
280.00 |
70.00 |
280.00 |
|
|
| 729-19-B |
dead end road installations(type b)
|
1   |
EACH |
1,100.00 |
1,100.00 |
1,250.00 |
1,250.00 |
1,050.00 |
1,050.00 |
|
|
| 730-01 |
trenching and backfilling
|
200   |
LNFT |
6.00 |
1,200.00 |
1.20 |
240.00 |
6.00 |
1,200.00 |
|
|
| 730-02-A |
conduit (1-1/2" rigid aluminum on bridge structure)
|
600   |
LNFT |
13.00 |
7,800.00 |
2.40 |
1,440.00 |
12.85 |
7,710.00 |
|
|
| 730-02-B |
conduit (1-1/2" dia sch 40 pvc in bridge structure)
|
5,900   |
LNFT |
4.60 |
27,140.00 |
1.50 |
8,850.00 |
4.50 |
26,550.00 |
|
|
| 730-02-C |
conductors (#4 xhhw)
|
12,000   |
LNFT |
1.30 |
15,600.00 |
1.00 |
12,000.00 |
1.25 |
15,000.00 |
|
|
| 730-02-D |
conductors (#6 bare ground for underground)
|
200   |
LNFT |
1.00 |
200.00 |
1.00 |
200.00 |
1.00 |
200.00 |
|
|
| 730-02-E |
conductors (#6 green insulated ground for inside
bridge deck) |
2,800   |
LNFT |
1.00 |
2,800.00 |
1.00 |
2,800.00 |
1.00 |
2,800.00 |
|
|
| 730-05 |
light pole (16'-0" mt. ht.structure mount with tenion)
|
20   |
EACH |
1,500.00 |
30,000.00 |
2,000.00 |
40,000.00 |
1,430.00 |
28,600.00 |
|
|
| 730-07 |
luminaire (250 watt m.h., colonial style roadway)
|
20   |
EACH |
1,100.00 |
22,000.00 |
1,500.00 |
30,000.00 |
1,100.00 |
22,000.00 |
|
|
| 730-08 |
electrical service point (pedestal mounted controller)
|
1   |
EACH |
7,300.00 |
7,300.00 |
9,000.00 |
9,000.00 |
7,060.00 |
7,060.00 |
|
|
| 730-16 |
underground junction box (11"x 17")
|
1   |
EACH |
590.00 |
590.00 |
600.00 |
600.00 |
575.00 |
575.00 |
|
|
| 730-17 |
structure mounted junction box (8"x 8"x 4")
|
4   |
EACH |
780.00 |
3,120.00 |
500.00 |
2,000.00 |
755.00 |
3,020.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
616   |
EACH |
9.00 |
5,544.00 |
9.00 |
5,544.00 |
9.00 |
5,544.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
649   |
EACH |
5.40 |
3,504.60 |
6.00 |
3,894.00 |
5.20 |
3,374.80 |
|
|
| 732-01-C-01 |
plastic pavement striping (8" width) preformed marking
tape (type v) |
3,160   |
LNFT |
5.00 |
15,800.00 |
5.00 |
15,800.00 |
4.85 |
15,326.00 |
|
|
| 732-01-E-01 |
plastic pavement striping (24" width) preformed
marking tape (type v) |
379   |
LNFT |
15.00 |
5,685.00 |
15.00 |
5,685.00 |
14.55 |
5,514.45 |
|
|
| 732-02-A-01 |
plastic pvmt striping (solid line)(4" width) preformed
marking tape (type v) |
4.350 |
MILE |
13,000.00 |
56,550.00 |
12,000.00 |
52,200.00 |
12,936.00 |
56,271.60 |
|
|
| 732-02-C-01 |
plast pavement striping (solid line)(8"width)
preformed marking tape (type v) |
0.177 |
MILE |
27,000.00 |
4,779.00 |
25,000.00 |
4,425.00 |
25,872.00 |
4,579.34 |
|
|
| 732-02-E-01 |
plast pavement striping (solid line)(24"width)
preformed marking tape (type v) |
0.059 |
MILE |
80,000.00 |
4,720.00 |
75,000.00 |
4,425.00 |
77,616.00 |
4,579.34 |
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
0.839 |
MILE |
7,000.00 |
5,873.00 |
7,500.00 |
6,292.50 |
6,468.00 |
5,426.65 |
|
|
| 732-05 |
removal of existing markings
|
8.400 |
MILE |
3,000.00 |
25,200.00 |
2,900.00 |
24,360.00 |
2,900.00 |
24,360.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
250,000.00 |
250,000.00 |
75,000.00 |
75,000.00 |
500,000.00 |
500,000.00 |
|
|
| 802-01 |
structural excavation
|
488.3 |
CUYD |
7.00 |
3,418.10 |
35.00 |
17,090.50 |
17.50 |
8,545.25 |
|
|
| 802-02 |
structural excavation for intermediate bents
|
1,715.0 |
CUYD |
78.00 |
133,770.00 |
35.00 |
60,025.00 |
25.00 |
42,875.00 |
|
|
| 804-03-D |
steel piles (hp 12 x 53)
|
24,368   |
LNFT |
32.00 |
779,776.00 |
30.00 |
731,040.00 |
25.00 |
609,200.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
13,000.00 |
13,000.00 |
1,000.00 |
1,000.00 |
25,000.00 |
25,000.00 |
|
|
| 805-01-D |
class a concrete (footings)
|
963.85 |
CUYD |
254.00 |
244,817.90 |
300.00 |
289,155.00 |
400.00 |
385,540.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
1,534.07 |
CUYD |
483.00 |
740,955.81 |
500.00 |
767,035.00 |
1,000.00 |
1,534,070.00 |
|
|
| 805-02 |
class a(m) concrete
|
129.90 |
CUYD |
691.00 |
89,760.90 |
700.00 |
90,930.00 |
1,000.00 |
129,900.00 |
|
|
| 805-06 |
class r concrete
|
75.20 |
CUYD |
152.00 |
11,430.40 |
150.00 |
11,280.00 |
250.00 |
18,800.00 |
|
|
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
8,532.4 |
LNFT |
102.00 |
870,304.80 |
85.00 |
725,254.00 |
100.00 |
853,240.00 |
|
|
| 805-11 |
strip seal joints
|
488.00 |
LNFT |
111.00 |
54,168.00 |
80.00 |
39,040.00 |
125.00 |
61,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
913,188   |
LB |
0.70 |
639,231.60 |
0.65 |
593,572.20 |
0.75 |
684,891.00 |
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
516,743   |
LB |
0.80 |
413,394.40 |
0.75 |
387,557.25 |
0.90 |
465,068.70 |
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
8,737,000.00 |
8,737,000.00 |
8,700,000.00 |
8,700,000.00 |
11,520,000.00 |
11,520,000.00 |
|
|
| 813-01 |
concrete approach slabs
|
502.52 |
SQYD |
117.00 |
58,794.84 |
150.00 |
75,378.00 |
150.00 |
75,378.00 |
|
|
| S-001 |
control gate precast concrete cover (class p(m)
concrete) |
1   |
EACH |
3,600.00 |
3,600.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
|
|
| S-002 |
glare paddles
|
600   |
lnft |
11.00 |
6,600.00 |
8.00 |
4,800.00 |
17.43 |
10,458.00 |
|
|
| S-104 |
class aa high performance concrete (hpc)
|
3,526.53 |
CUYD |
571.00 |
2,013,648.63 |
600.00 |
2,115,918.00 |
1,000.00 |
3,526,530.00 |
|
|
| S-105 |
high performance concrete (hpc) railing (barrier)
|
5,541.41 |
LNFT |
54.00 |
299,236.14 |
40.00 |
221,656.40 |
40.00 |
221,656.40 |
|
|
| S-106 |
light support base
|
20   |
EACH |
2,600.00 |
52,000.00 |
450.00 |
9,000.00 |
500.00 |
10,000.00 |
|
|
| S-107 |
removal of concrete at piers
|
310   |
CUYD |
300.00 |
93,000.00 |
800.00 |
248,000.00 |
1,000.00 |
310,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
24,487,919.43 |
|
25,632,040.45 |
|
29,832,053.43 |
|
|
|