DBE GOAL FED
Lead Project: 276-03-0016
Parish: TANGIPAHOA
Routes: LA 440, LA 1057
Description: TANGIPAHOA RIVER BRIDGE AND APPROACHES
Type Const: c & g, grading, drain struct, in-place cement stabilized base course, cold planing
asphaltic pavement, superpave acp, precast-prestressed conc girder span bridge, & related work.
 
RankLicenseBidderAmount
102179 BOH BROS. CONSTRUCTION CO., LLC. $5,482,929.92
214422 T. L. WALLACE CONSTRUCTION, INC. $5,568,046.79
315288 GULF SOUTH PILING & CONST., INC. $5,672,409.82
436827 SHAVERS-WHITTLE CONSTRUCTION INC $5,796,933.90
534567 JAMES CONSTRUCTION GROUP LLC $5,911,433.52
625747 KOSTMAYER CONSTRUCTION, LLC $7,634,009.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
T. L. WALLACE CONSTRUCTION, INC.
- 3 -
GULF SOUTH PILING & CONST., INC.
- 4 -
SHAVERS-WHITTLE CONSTRUCTION INC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 37,300.00 37,300.00 505,000.00 505,000.00 100,000.00 100,000.00 50,000.00 50,000.00
202-01 removal of structures & obstructions lump      LUMP 5,500.00 5,500.00 5,000.00 5,000.00 20,000.00 20,000.00 34,000.00 34,000.00
202-02-A-01 removal of bridges, (58' x 24' concrete bridge) 1      EACH 7,200.00 7,200.00 5,600.00 5,600.00 10,000.00 10,000.00 7,500.00 7,500.00
202-02-A-02 removal of bridges, (135' x 24' concrete bridge) 1      EACH 13,200.00 13,200.00 11,500.00 11,500.00 12,000.00 12,000.00 13,000.00 13,000.00
202-02-A-03 removal of bridges, (324' x 32' concrete bridge) 1      EACH 33,000.00 33,000.00 21,500.00 21,500.00 20,000.00 20,000.00 32,000.00 32,000.00
202-02-A-04 removal of bridges, (230' x 24' concrete bridge) 1      EACH 16,500.00 16,500.00 21,500.00 21,500.00 15,000.00 15,000.00 16,500.00 16,500.00
202-02-A-05 removal of bridges, (230' x 24' concrete bridge) 1      EACH 16,500.00 16,500.00 21,500.00 21,500.00 15,000.00 15,000.00 16,500.00 16,500.00
202-02-G removal of surfacing & stabilized base 8,714.8    SQYD 4.20 36,602.16 2.00 17,429.60 5.00 43,574.00 4.25 37,037.90
203-01 general excavation 14,177      CUYD 3.00 42,531.00 2.95 41,822.15 3.00 42,531.00 3.50 49,619.50
203-02 drainage excavation 965      CUYD 9.00 8,685.00 7.00 6,755.00 10.00 9,650.00 11.50 11,097.50
203-04 embankment 81,908      CUYD 8.40 688,027.20 7.40 606,119.20 9.50 778,126.00 9.50 778,126.00
204-05-A temporary sediment check dams (hay) 16      EACH 100.00 1,600.00 75.00 1,200.00 100.00 1,600.00 110.00 1,760.00
204-05-B temporary sediment check dams (stone) 15      EACH 500.00 7,500.00 300.00 4,500.00 300.00 4,500.00 325.00 4,875.00
204-06 temporary silt fencing 3,580      LNFT 1.50 5,370.00 2.50 8,950.00 1.50 5,370.00 1.50 5,370.00
303-01-D in-place cement stabilized base couse (12" thick) 10,493      SQYD 7.70 80,796.10 11.10 116,472.30 10.00 104,930.00 12.50 131,162.50
401-01 aggregate surface course (net section) 3,623.1    CUYD 50.60 183,328.86 45.00 163,039.50 62.00 224,632.20 65.00 235,501.50
402-01 traffic maintenance aggregate (vehicular measurement) 38.0    CUYD 38.00 1,444.00 30.00 1,140.00 40.00 1,520.00 35.00 1,330.00
502-01 superpave asphaltic concrete 4,918.3    TON 69.00 339,362.70 62.37 306,754.37 62.00 304,934.60 72.00 354,117.60
502-01-A superpave asphaltic concrete, paved drives and
turnouts
413.2    TON 171.00 70,657.20 155.17 64,116.24 160.00 66,112.00 175.00 72,310.00
509-01 cold planing asphaltic pavement 2,851      SQYD 7.50 21,382.50 5.68 16,193.68 6.00 17,106.00 7.00 19,957.00
509-02 contractor retained reclaimed asphaltic pavement - 60      CUYD 1.00 - 60.00 0.10 - 6.00 1.00 - 60.00 FREE FREE
701-04-J storm drain pipe arch (60" equiv. rcpa) 106      LNFT 178.00 18,868.00 250.00 26,500.00 200.00 21,200.00 225.00 23,850.00
701-04-L storm drain pipe arch (72" equiv. rcpa) 110      LNFT 237.00 26,070.00 350.00 38,500.00 250.00 27,500.00 275.00 30,250.00
701-06-D side drain pipe arch (24" equiv.) 68      LNFT 67.00 4,556.00 100.00 6,800.00 50.00 3,400.00 60.00 4,080.00
702-08-B side drain safety end (type 2) 4      EACH 3,100.00 12,400.00 2,500.00 10,000.00 4,000.00 16,000.00 3,000.00 12,000.00
704-03 blocked out guard rail 237.5    LNFT 20.00 4,750.00 16.50 3,918.75 18.00 4,275.00 18.00 4,275.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 42.00 4,200.00 40.00 4,000.00 40.00 4,000.00 42.00 4,200.00
704-11-A guard rail end treatment (flared) 4      EACH 1,900.00 7,600.00 2,000.00 8,000.00 1,800.00 7,200.00 2,200.00 8,800.00
705-01 barbed wire fence 3,706      LNFT 6.00 22,236.00 5.50 20,383.00 6.00 22,236.00 6.50 24,089.00
708-01 right-of-way monument 30      EACH 335.00 10,050.00 50.00 1,500.00 125.00 3,750.00 100.00 3,000.00
708-02 right-of-way monument witness post 30      EACH 60.00 1,800.00 50.00 1,500.00 150.00 4,500.00 125.00 3,750.00
711-01-D riprap (55 lb, 18 in thick) 1,104      SQYD 29.00 32,016.00 46.00 50,784.00 50.00 55,200.00 35.00 38,640.00
711-04 geotextile fabric 1,104      SQYD 1.80 1,987.20 1.75 1,932.00 2.00 2,208.00 2.00 2,208.00
713-01 temporary signs & barricades lump      LUMP 22,000.00 22,000.00 26,000.00 26,000.00 50,000.00 50,000.00 45,000.00 45,000.00
713-03-A temporary pavement markings (4" width) 5,038      LNFT 0.35 1,763.30 1.00 5,038.00 0.30 1,511.40 0.35 1,763.30
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.447  MILE 2,200.00 983.40 250.00 111.75 300.00 134.10 1,500.00 670.50
715-01 topsoil 77      CUYD 44.00 3,388.00 30.00 2,310.00 30.00 2,310.00 37.50 2,887.50
716-01-A mulch (vegetative) 7.29   ACRE 750.00 5,467.50 650.00 4,738.50 700.00 5,103.00 850.00 6,196.50
717-01 seeding 313      LB 8.00 2,504.00 6.00 1,878.00 7.00 2,191.00 8.50 2,660.50
718-01 fertilizer 10,406      LB 0.25 2,601.50 0.30 3,121.80 0.30 3,121.80 0.25 2,601.50
720-01-B erosion control sysyem, slope protection (type b) 35      SQYD 385.00 13,475.00 2.00 70.00 3.50 122.50 2.50 87.50
727-01 mobilization lump      LUMP 540,000.00 540,000.00 120,000.00 120,000.00 525,000.00 525,000.00 380,000.00 380,000.00
729-16-C object marker assembly (type 3) 4      EACH 72.00 288.00 70.00 280.00 65.00 260.00 80.00 320.00
731-01 nonreflectorized raised pavement markers 330      EACH 10.00 3,300.00 12.00 3,960.00 9.00 2,970.00 11.00 3,630.00
731-02 reflectorized raised pavement markers 135      EACH 5.40 729.00 8.00 1,080.00 5.00 675.00 6.00 810.00
732-01-E plastic pavement striping (24" width) 36      LNFT 3.20 115.20 3.00 108.00 3.00 108.00 3.50 126.00
732-02-A plastic pavement striping (solid line)(4" width) 3.355  MILE 2,310.00 7,750.05 5,000.00 16,775.00 2,100.00 7,045.50 2,500.00 8,387.50
732-03-A plastic pavement striping (broken line)(4" width) 0.739  MILE 700.00 517.30 2,000.00 1,478.00 630.00 465.57 750.00 554.25
740-01 construction layout lump      LUMP 325,000.00 325,000.00 60,000.00 60,000.00 150,000.00 150,000.00 35,000.00 35,000.00
804-01-B precast concrete piles (14") 172      LNFT 30.00 5,160.00 65.00 11,180.00 60.00 10,320.00 36.50 6,278.00
804-01-F precast concrete piles (24") 3,056      LNFT 63.00 192,528.00 110.00 336,160.00 90.00 275,040.00 85.00 259,760.00
804-01-G precast concrete piles (30") 5,260      LNFT 91.00 478,660.00 155.00 815,300.00 100.00 526,000.00 135.00 710,100.00
804-12 loading permanent piles 2      EACH 20,000.00 40,000.00 30,000.00 60,000.00 500.00 1,000.00 1.00 2.00
805-01-F class a concrete (bents) 405.03   CUYD 500.00 202,515.00 475.00 192,389.25 500.00 202,515.00 650.00 263,269.50
805-03 class aa concrete 1,771.93   CUYD 365.00 646,754.45 400.00 708,772.00 425.00 753,070.25 435.00 770,789.55
805-08-C precast-prestressed concrete girder (type iii) 8,940.0    LNFT 80.00 715,200.00 65.00 581,100.00 65.00 581,100.00 80.00 715,200.00
805-11 strip seal joints 320.00   LNFT 100.00 32,000.00 100.00 32,000.00 120.00 38,400.00 125.00 40,000.00
806-01 deformed reinforcing steel 495,704      LB 0.70 346,992.80 0.60 297,422.40 0.75 371,778.00 0.65 322,207.60
807-06 structural metalwork lump      LUMP 7,300.00 7,300.00 15,000.00 15,000.00 15,000.00 15,000.00 18,500.00 18,500.00
810-01 concrete railing (barrier) 3,000.00   LNFT 25.00 75,000.00 30.50 91,500.00 42.00 126,000.00 40.00 120,000.00
813-01 concrete approach slabs 359.82   SQYD 125.00 44,977.50 165.00 59,370.30 145.00 52,173.90 135.00 48,575.70
S-101 retroreflective sheeting panels lump      LUMP 3,000.00 3,000.00 1,000.00 1,000.00 1,000.00 1,000.00 650.00 650.00
                       
 CONTRACTOR TOTAL       5,482,929.92   5,568,046.79   5,672,409.82   5,796,933.90
 
Item Number Item Description Quantity Unit of Measure - 5 -
JAMES CONSTRUCTION GROUP LLC
- 6 -
KOSTMAYER CONSTRUCTION, LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 200,000.00 200,000.00 85,000.00 85,000.00        
202-01 removal of structures & obstructions lump      LUMP 35,000.00 35,000.00 5,000.00 5,000.00        
202-02-A-01 removal of bridges, (58' x 24' concrete bridge) 1      EACH 8,000.00 8,000.00 30,000.00 30,000.00        
202-02-A-02 removal of bridges, (135' x 24' concrete bridge) 1      EACH 12,500.00 12,500.00 48,000.00 48,000.00        
202-02-A-03 removal of bridges, (324' x 32' concrete bridge) 1      EACH 65,000.00 65,000.00 90,000.00 90,000.00        
202-02-A-04 removal of bridges, (230' x 24' concrete bridge) 1      EACH 16,000.00 16,000.00 60,000.00 60,000.00        
202-02-A-05 removal of bridges, (230' x 24' concrete bridge) 1      EACH 16,000.00 16,000.00 60,000.00 60,000.00        
202-02-G removal of surfacing & stabilized base 8,714.8    SQYD 4.00 34,859.20 7.00 61,003.60        
203-01 general excavation 14,177      CUYD 3.00 42,531.00 6.00 85,062.00        
203-02 drainage excavation 965      CUYD 7.50 7,237.50 10.00 9,650.00        
203-04 embankment 81,908      CUYD 9.25 757,649.00 9.00 737,172.00        
204-05-A temporary sediment check dams (hay) 16      EACH 100.00 1,600.00 290.00 4,640.00        
204-05-B temporary sediment check dams (stone) 15      EACH 275.00 4,125.00 900.00 13,500.00        
204-06 temporary silt fencing 3,580      LNFT 1.20 4,296.00 1.45 5,191.00        
303-01-D in-place cement stabilized base couse (12" thick) 10,493      SQYD 8.00 83,944.00 36.00 377,748.00        
401-01 aggregate surface course (net section) 3,623.1    CUYD 50.00 181,155.00 75.00 271,732.50        
402-01 traffic maintenance aggregate (vehicular measurement) 38.0    CUYD 55.00 2,090.00 70.00 2,660.00        
502-01 superpave asphaltic concrete 4,918.3    TON 63.00 309,852.90 100.00 491,830.00        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
413.2    TON 160.00 66,112.00 110.00 45,452.00        
509-01 cold planing asphaltic pavement 2,851      SQYD 6.00 17,106.00 27.00 76,977.00        
509-02 contractor retained reclaimed asphaltic pavement - 60      CUYD 1.00 - 60.00 1.00 - 60.00        
701-04-J storm drain pipe arch (60" equiv. rcpa) 106      LNFT 200.00 21,200.00 225.00 23,850.00        
701-04-L storm drain pipe arch (72" equiv. rcpa) 110      LNFT 240.00 26,400.00 285.00 31,350.00        
701-06-D side drain pipe arch (24" equiv.) 68      LNFT 50.00 3,400.00 57.00 3,876.00        
702-08-B side drain safety end (type 2) 4      EACH 4,000.00 16,000.00 2,900.00 11,600.00        
704-03 blocked out guard rail 237.5    LNFT 18.00 4,275.00 20.00 4,750.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 38.00 3,800.00 48.00 4,800.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,000.00 8,000.00 2,400.00 9,600.00        
705-01 barbed wire fence 3,706      LNFT 6.00 22,236.00 7.00 25,942.00        
708-01 right-of-way monument 30      EACH 200.00 6,000.00 100.00 3,000.00        
708-02 right-of-way monument witness post 30      EACH 200.00 6,000.00 100.00 3,000.00        
711-01-D riprap (55 lb, 18 in thick) 1,104      SQYD 41.00 45,264.00 60.00 66,240.00        
711-04 geotextile fabric 1,104      SQYD 2.00 2,208.00 1.45 1,600.80        
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 21,000.00 21,000.00        
713-03-A temporary pavement markings (4" width) 5,038      LNFT 0.30 1,511.40 1.20 6,045.60        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.447  MILE 500.00 223.50 6,000.00 2,682.00        
715-01 topsoil 77      CUYD 30.00 2,310.00 13.00 1,001.00        
716-01-A mulch (vegetative) 7.29   ACRE 680.00 4,957.20 1,200.00 8,748.00        
717-01 seeding 313      LB 7.00 2,191.00 10.00 3,130.00        
718-01 fertilizer 10,406      LB 0.20 2,081.20 0.40 4,162.40        
720-01-B erosion control sysyem, slope protection (type b) 35      SQYD 10.00 350.00 12.00 420.00        
727-01 mobilization lump      LUMP 575,000.00 575,000.00 300,000.00 300,000.00        
729-16-C object marker assembly (type 3) 4      EACH 65.00 260.00 80.00 320.00        
731-01 nonreflectorized raised pavement markers 330      EACH 9.00 2,970.00 14.00 4,620.00        
731-02 reflectorized raised pavement markers 135      EACH 5.00 675.00 10.00 1,350.00        
732-01-E plastic pavement striping (24" width) 36      LNFT 3.00 108.00 3.50 126.00        
732-02-A plastic pavement striping (solid line)(4" width) 3.355  MILE 2,100.00 7,045.50 6,000.00 20,130.00        
732-03-A plastic pavement striping (broken line)(4" width) 0.739  MILE 630.00 465.57 2,400.00 1,773.60        
740-01 construction layout lump      LUMP 100,000.00 100,000.00 62,000.00 62,000.00        
804-01-B precast concrete piles (14") 172      LNFT 50.00 8,600.00 36.00 6,192.00        
804-01-F precast concrete piles (24") 3,056      LNFT 90.00 275,040.00 110.00 336,160.00        
804-01-G precast concrete piles (30") 5,260      LNFT 95.00 499,700.00 180.00 946,800.00        
804-12 loading permanent piles 2      EACH 2,500.00 5,000.00 17,000.00 34,000.00        
805-01-F class a concrete (bents) 405.03   CUYD 600.00 243,018.00 650.00 263,269.50        
805-03 class aa concrete 1,771.93   CUYD 525.00 930,263.25 600.00 1,063,158.00        
805-08-C precast-prestressed concrete girder (type iii) 8,940.0    LNFT 75.00 670,500.00 90.00 804,600.00        
805-11 strip seal joints 320.00   LNFT 130.00 41,600.00 105.00 33,600.00        
806-01 deformed reinforcing steel 495,704      LB 0.65 322,207.60 0.75 371,778.00        
807-06 structural metalwork lump      LUMP 10,000.00 10,000.00 20,000.00 20,000.00        
810-01 concrete railing (barrier) 3,000.00   LNFT 32.00 96,000.00 170.00 510,000.00        
813-01 concrete approach slabs 359.82   SQYD 135.00 48,575.70 130.00 46,776.60        
S-101 retroreflective sheeting panels lump      LUMP 1,000.00 1,000.00 10,000.00 10,000.00        
                       
 CONTRACTOR TOTAL       5,911,433.52   7,634,009.60        