| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - HUEY STOCKSTILL, INC. |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
126   |
LNFT |
8.00 |
1,008.00 |
4.00 |
504.00 |
7.00 |
882.00 |
2.50 |
315.00 |
| 203-08 |
borrow (vehicular measurement)
|
2,697   |
CUYD |
7.00 |
18,879.00 |
14.00 |
37,758.00 |
9.00 |
24,273.00 |
5.00 |
13,485.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
3,000   |
CUYD |
7.00 |
21,000.00 |
15.00 |
45,000.00 |
9.00 |
27,000.00 |
3.00 |
9,000.00 |
| 502-01 |
superpave asphaltic concrete
|
18,292.5 |
TON |
46.00 |
841,455.00 |
41.00 |
749,992.50 |
44.00 |
804,870.00 |
56.00 |
1,024,380.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
590.4 |
TON |
95.00 |
56,088.00 |
85.00 |
50,184.00 |
80.00 |
47,232.00 |
80.00 |
47,232.00 |
| 507-01-B |
asphaltic surface treatment (2 applications)
|
84,480   |
SQYD |
2.00 |
168,960.00 |
2.11 |
178,252.80 |
2.00 |
168,960.00 |
2.50 |
211,200.00 |
| 509-01 |
cold planing asphaltic pavement
|
87,210   |
SQYD |
1.00 |
87,210.00 |
0.78 |
68,023.80 |
1.50 |
130,815.00 |
1.40 |
122,094.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,423   |
CUYD |
5.00 |
- 12,115.00 |
0.10 |
- 242.30 |
FREE |
FREE |
10.00 |
- 24,230.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
60   |
LNFT |
130.00 |
7,800.00 |
125.20 |
7,512.00 |
89.00 |
5,340.00 |
200.00 |
12,000.00 |
| 701-08 |
relaying pipe
|
8   |
LNFT |
130.00 |
1,040.00 |
22.76 |
182.08 |
60.00 |
480.00 |
50.00 |
400.00 |
| 701-15 |
concrete collar
|
1   |
EACH |
800.00 |
800.00 |
740.00 |
740.00 |
800.00 |
800.00 |
700.00 |
700.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
462.5 |
LNFT |
36.00 |
16,650.00 |
43.82 |
20,266.75 |
36.00 |
16,650.00 |
40.00 |
18,500.00 |
| 704-03 |
blocked out guard rail
|
100.0 |
LNFT |
17.00 |
1,700.00 |
21.06 |
2,106.00 |
17.00 |
1,700.00 |
18.00 |
1,800.00 |
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,000.00 |
16,000.00 |
2,134.00 |
17,072.00 |
1,900.00 |
15,200.00 |
1,700.00 |
13,600.00 |
| 706-01-C |
concrete walk (6" thick)
|
35.5 |
SQYD |
130.00 |
4,615.00 |
51.22 |
1,818.31 |
100.00 |
3,550.00 |
175.00 |
6,212.50 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
45,000.00 |
45,000.00 |
10,000.00 |
10,000.00 |
| 713-03-D |
temporary pavement markings (12" width)
|
192   |
LNFT |
1.00 |
192.00 |
0.68 |
130.56 |
1.00 |
192.00 |
0.10 |
19.20 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.880 |
MILE |
130.00 |
1,544.40 |
143.00 |
1,698.84 |
200.00 |
2,376.00 |
10.00 |
118.80 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
11.060 |
MILE |
50.00 |
553.00 |
341.00 |
3,771.46 |
100.00 |
1,106.00 |
10.00 |
110.60 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
28.360 |
MILE |
100.00 |
2,836.00 |
541.00 |
15,342.76 |
200.00 |
5,672.00 |
20.00 |
567.20 |
| 713-07 |
temporary reflectorized raised pavement markers
|
785   |
EACH |
2.00 |
1,570.00 |
1.71 |
1,342.35 |
1.50 |
1,177.50 |
1.25 |
981.25 |
| 722-01 |
project site laboratory
|
1   |
EACH |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
3,000.00 |
3,000.00 |
2,000.00 |
2,000.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
350   |
SQYD |
90.00 |
31,500.00 |
124.29 |
43,501.50 |
140.00 |
49,000.00 |
100.00 |
35,000.00 |
| 726-01 |
bedding material
|
17.4 |
CUYD |
70.00 |
1,218.00 |
51.00 |
887.40 |
45.00 |
783.00 |
50.00 |
870.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
48,000.00 |
48,000.00 |
148,000.00 |
148,000.00 |
160,000.00 |
160,000.00 |
85,000.00 |
85,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
10   |
EACH |
80.00 |
800.00 |
74.00 |
740.00 |
75.00 |
750.00 |
85.00 |
850.00 |
| 731-02 |
reflectorized raised pavement markers
|
785   |
EACH |
6.00 |
4,710.00 |
5.41 |
4,246.85 |
5.00 |
3,925.00 |
5.00 |
3,925.00 |
| 732-01-D |
plastic pavement striping (12" width)
|
96   |
LNFT |
3.00 |
288.00 |
1.37 |
131.52 |
2.00 |
192.00 |
1.60 |
153.60 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.180 |
MILE |
2,000.00 |
28,360.00 |
2,037.00 |
28,884.66 |
2,000.00 |
28,360.00 |
1,700.00 |
24,106.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.530 |
MILE |
700.00 |
3,871.00 |
797.00 |
4,407.41 |
700.00 |
3,871.00 |
700.00 |
3,871.00 |
| 735-01 |
mailboxes
|
70   |
EACH |
10.00 |
700.00 |
12.40 |
868.00 |
10.00 |
700.00 |
1.00 |
70.00 |
| 735-02 |
mailbox supports (single)
|
70   |
EACH |
110.00 |
7,700.00 |
132.00 |
9,240.00 |
110.00 |
7,700.00 |
50.00 |
3,500.00 |
| 739-01 |
hydro-seeding
|
7.20 |
ACRE |
1,000.00 |
7,200.00 |
967.00 |
6,962.40 |
800.00 |
5,760.00 |
700.00 |
5,040.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
11,000.00 |
11,000.00 |
9,500.00 |
9,500.00 |
10,000.00 |
10,000.00 |
3,000.00 |
3,000.00 |
| S-001 |
cement treated base course (12 inch depth)
|
54,904   |
SQYD |
5.00 |
274,520.00 |
4.50 |
247,068.00 |
4.00 |
219,616.00 |
4.50 |
247,068.00 |
| S-002 |
u-channel post installation
|
40   |
each |
70.00 |
2,800.00 |
79.67 |
3,186.80 |
40.00 |
1,600.00 |
50.00 |
2,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,673,452.40 |
|
1,726,580.45 |
|
1,798,532.50 |
|
1,884,939.15 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - COVINGTON PAVING CO. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
126   |
LNFT |
4.00 |
504.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,697   |
CUYD |
14.00 |
37,758.00 |
|
|
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
3,000   |
CUYD |
14.00 |
42,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
18,292.5 |
TON |
54.90 |
1,004,258.25 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
590.4 |
TON |
80.00 |
47,232.00 |
|
|
|
|
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
84,480   |
SQYD |
2.04 |
172,339.20 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
87,210   |
SQYD |
1.00 |
87,210.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,423   |
CUYD |
3.00 |
- 7,269.00 |
|
|
|
|
|
|
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
60   |
LNFT |
123.00 |
7,380.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
8   |
LNFT |
144.00 |
1,152.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
700.00 |
700.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
462.5 |
LNFT |
70.00 |
32,375.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
100.0 |
LNFT |
20.00 |
2,000.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,100.00 |
16,800.00 |
|
|
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
35.5 |
SQYD |
125.00 |
4,437.50 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
192   |
LNFT |
1.16 |
222.72 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.880 |
MILE |
275.00 |
3,267.00 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
11.060 |
MILE |
300.00 |
3,318.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
28.360 |
MILE |
550.00 |
15,598.00 |
|
|
|
|
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
785   |
EACH |
2.50 |
1,962.50 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
350   |
SQYD |
111.50 |
39,025.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
17.4 |
CUYD |
50.00 |
870.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
140,000.00 |
140,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
10   |
EACH |
90.00 |
900.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
785   |
EACH |
5.40 |
4,239.00 |
|
|
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
96   |
LNFT |
2.00 |
192.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.180 |
MILE |
2,200.00 |
31,196.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.530 |
MILE |
700.00 |
3,871.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
70   |
EACH |
12.00 |
840.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
70   |
EACH |
130.00 |
9,100.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
7.20 |
ACRE |
1,000.00 |
7,200.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
6,500.00 |
6,500.00 |
|
|
|
|
|
|
| S-001 |
cement treated base course (12 inch depth)
|
54,904   |
SQYD |
4.19 |
230,047.76 |
|
|
|
|
|
|
| S-002 |
u-channel post installation
|
40   |
each |
80.00 |
3,200.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,972,925.93 |
|
|
|
|
|
|
|