| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
200   |
CUYD |
5.00 |
1,000.00 |
10.00 |
2,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,925   |
CUYD |
15.00 |
28,875.00 |
1.00 |
1,925.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
7,580.0 |
TON |
51.00 |
386,580.00 |
50.00 |
379,000.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,000.0 |
TON |
51.00 |
51,000.00 |
50.00 |
50,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
36,000.00 |
36,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.830 |
MILE |
500.00 |
2,915.00 |
150.00 |
874.50 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.830 |
MILE |
10.00 |
58.30 |
150.00 |
874.50 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
22.000 |
MILE |
500.00 |
11,000.00 |
200.00 |
4,400.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
10.00 |
5,000.00 |
5.00 |
2,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
48,000.00 |
48,000.00 |
64,000.00 |
64,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
800   |
EACH |
5.00 |
4,000.00 |
5.00 |
4,000.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
22.000 |
MILE |
1,600.00 |
35,200.00 |
2,100.00 |
46,200.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.810 |
MILE |
600.00 |
1,086.00 |
750.00 |
1,357.50 |
|
|
|
|
| 735-01 |
mailboxes
|
172   |
EACH |
12.00 |
2,064.00 |
1.00 |
172.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
161   |
EACH |
120.00 |
19,320.00 |
115.00 |
18,515.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
8   |
EACH |
170.00 |
1,360.00 |
175.00 |
1,400.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
3   |
EACH |
235.00 |
705.00 |
550.00 |
1,650.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
7,000.00 |
7,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
642,163.30 |
|
653,868.50 |
|
|
|
|
|