Letting of 3/30/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 132-03-0013
Parish: VERNON
Routes: LA 111
Description: E. JCT. LA 8 - 4.3 MI. NORTH
Type Const: grading, cold planing asphaltic concrete, lime treatment, cement treated base course,
superpave asphaltic concrete overlay, and related work.
 
RankLicenseBidderAmount
108815 W. E. MCDONALD & SON, LLC. $1,220,770.18
212312 GILCHRIST CONSTRUCTION CO. LLC $1,223,607.76
334356 PRAIRIE CONTRACTORS INC. $1,234,808.61
412487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,261,278.96
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
PRAIRIE CONTRACTORS INC.
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 7,500.00 7,500.00 12,000.00 12,000.00 4,000.00 4,000.00 25,000.00 25,000.00
202-02-H removal of guard rail 798      LNFT 3.00 2,394.00 5.00 3,990.00 6.00 4,788.00 4.00 3,192.00
203-08 borrow (vehicular measurement) 5,332      CUYD 8.00 42,656.00 12.00 63,984.00 8.00 42,656.00 9.00 47,988.00
203-08-A borrow (vehicular meas.)(selected soils) 250      CUYD 8.00 2,000.00 16.00 4,000.00 8.00 2,000.00 9.00 2,250.00
303-02 removal of existing patches 50      SQYD 50.00 2,500.00 50.00 2,500.00 55.00 2,750.00 25.00 1,250.00
304-01 lime 245.19   TON 125.00 30,648.75 25.00 6,129.75 126.00 30,893.94 120.00 29,422.80
304-04-B lime treatment (type d) (8 1/2" thick) 24,420      SQYD 1.90 46,398.00 0.10 2,442.00 1.90 46,398.00 1.90 46,398.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,805      CUYD 32.00 57,760.00 40.00 72,200.00 25.00 45,125.00 32.00 57,760.00
502-01 superpave asphaltic concrete 9,877.3    TON 46.00 454,355.80 55.00 543,251.50 62.00 612,392.60 46.20 456,331.26
502-01-A superpave asphaltic concrete (paved drives and
turnouts)
650.1    TON 75.00 48,757.50 75.00 48,757.50 35.00 22,753.50 75.00 48,757.50
509-01 cold planing asphaltic pavement 11,311      SQYD 1.20 13,573.20 1.75 19,794.25 1.40 15,835.40 3.25 36,760.75
509-02 contractor retained reclaimed asphaltic pavement - 236      CUYD 0.01 - 2.36 1.00 - 236.00 0.01 - 2.36 0.10 - 23.60
701-01-I cross drain pipe (24" rcp/pcp) 84      LNFT 80.00 6,720.00 100.00 8,400.00 100.00 8,400.00 90.00 7,560.00
701-08 relaying pipe 28      LNFT 75.00 2,100.00 100.00 2,800.00 114.00 3,192.00 90.00 2,520.00
701-15 concrete collar 4      EACH 800.00 3,200.00 2,200.00 8,800.00 800.00 3,200.00 900.00 3,600.00
704-03 blocked out guard rail 150.0    LNFT 16.00 2,400.00 18.00 2,700.00 16.00 2,400.00 18.00 2,700.00
704-07-A guard rail bridge attachments (single thrie beam) 150.0    LNFT 25.00 3,750.00 28.00 4,200.00 36.00 5,400.00 28.00 4,200.00
704-08-B guard rail transitions (double thrie beam) 300.0    LNFT 35.00 10,500.00 40.00 12,000.00 44.00 13,200.00 39.00 11,700.00
704-11-A guard rail end treatment (flared) 12      EACH 1,750.00 21,000.00 2,000.00 24,000.00 1,900.00 22,800.00 2,000.00 24,000.00
711-01-C riprap (30 lb, 12" thick) 78      SQYD 40.00 3,120.00 55.00 4,290.00 35.00 2,730.00 45.00 3,510.00
711-02-C riprap (30 lb) 214      CUYD 110.00 23,540.00 100.00 21,400.00 110.00 23,540.00 123.00 26,322.00
711-04 geotextile fabric 494      SQYD 2.50 1,235.00 2.50 1,235.00 3.00 1,482.00 2.50 1,235.00
713-01 temporary signs & barricades lump      LUMP 16,000.00 16,000.00 5,500.00 5,500.00 8,000.00 8,000.00 10,000.00 10,000.00
713-03-E temporary pavement markings (24" width) 14      LNFT 8.40 117.60 0.70 9.80 1.00 14.00 1.00 14.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
8.598  MILE 250.00 2,149.50 400.00 3,439.20 300.00 2,579.40 150.00 1,289.70
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.617  MILE 1.00 6.61 275.00 1,819.67 1.00 6.61 280.00 1,852.76
713-05-A temporary pavement markings (solid line)(4" width) 25.030  MILE 1.00 25.03 450.00 11,263.50 1.00 25.03 444.00 11,113.32
717-01 seeding 267      LB 6.00 1,602.00 7.00 1,869.00 7.00 1,869.00 10.00 2,670.00
718-01 fertilizer 5,700      LB 0.30 1,710.00 0.35 1,995.00 0.40 2,280.00 0.22 1,254.00
720-01-A erosion control system, slope protection (type a) 145      SQYD 1.50 217.50 1.75 253.75 2.00 290.00 3.30 478.50
721-01 asphalt mulch 13,794      GAL 1.50 20,691.00 1.56 21,518.64 1.78 24,553.32 1.78 24,553.32
722-01 project site laboratory 1      EACH 3,000.00 3,000.00 5,000.00 5,000.00 3,000.00 3,000.00 13,500.00 13,500.00
724-01-B pavement patching (12" minimum thickness) 20      SQYD 65.00 1,300.00 145.00 2,900.00 200.00 4,000.00 250.00 5,000.00
726-01 bedding material 24.0    CUYD 75.00 1,800.00 75.00 1,800.00 80.00 1,920.00 84.00 2,016.00
727-01 mobilization lump      LUMP 120,000.00 120,000.00 35,000.00 35,000.00 9,000.00 9,000.00 50,000.00 50,000.00
729-16-B object marker assembly (type 2) 18      EACH 55.00 990.00 65.00 1,170.00 60.00 1,080.00 62.00 1,116.00
729-16-C object marker assembly (type 3) 12      EACH 65.00 780.00 70.00 840.00 78.00 936.00 72.00 864.00
731-02 reflectorized raised pavement markers 566      EACH 4.50 2,547.00 5.00 2,830.00 5.00 2,830.00 5.00 2,830.00
732-01-E plastic pavement striping (24" width) 14      LNFT 2.40 33.60 2.75 38.50 3.00 42.00 2.67 37.38
732-02-A plastic pavement striping (solid line) (4" width) 12.714  MILE 2,000.00 25,428.00 1,900.00 24,156.60 1,900.00 24,156.60 1,950.00 24,792.30
732-03-A plastic pavement striping (broken line)(4" width) 3.308  MILE 1,000.00 3,308.00 700.00 2,315.60 750.00 2,481.00 723.00 2,391.68
735-01 mailboxes 21      EACH 1.00 21.00 25.00 525.00 2.00 42.00 15.00 315.00
735-02 mailbox supports (single) 11      EACH 170.00 1,870.00 150.00 1,650.00 175.00 1,925.00 150.00 1,650.00
735-03 mailbox supports (double) 4      EACH 175.00 700.00 250.00 1,000.00 180.00 720.00 210.00 840.00
735-04 mailbox supports (multiple) 2      EACH 325.00 650.00 400.00 800.00 400.00 800.00 350.00 700.00
740-01 construction layout lump      LUMP 7,500.00 7,500.00 7,500.00 7,500.00 200.00 200.00 10,000.00 10,000.00
S-001 cement treated base course (12 in depth) 48,839      SQYD 4.55 222,217.45 4.50 219,775.50 4.63 226,124.57 5.11 249,567.29
                       
 CONTRACTOR TOTAL       1,220,770.18   1,223,607.76   1,234,808.61   1,261,278.96