| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - PRAIRIE CONTRACTORS INC. |
- 4 - DIAMOND B CONSTRUCTION CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
7,500.00 |
7,500.00 |
12,000.00 |
12,000.00 |
4,000.00 |
4,000.00 |
25,000.00 |
25,000.00 |
| 202-02-H |
removal of guard rail
|
798   |
LNFT |
3.00 |
2,394.00 |
5.00 |
3,990.00 |
6.00 |
4,788.00 |
4.00 |
3,192.00 |
| 203-08 |
borrow (vehicular measurement)
|
5,332   |
CUYD |
8.00 |
42,656.00 |
12.00 |
63,984.00 |
8.00 |
42,656.00 |
9.00 |
47,988.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
250   |
CUYD |
8.00 |
2,000.00 |
16.00 |
4,000.00 |
8.00 |
2,000.00 |
9.00 |
2,250.00 |
| 303-02 |
removal of existing patches
|
50   |
SQYD |
50.00 |
2,500.00 |
50.00 |
2,500.00 |
55.00 |
2,750.00 |
25.00 |
1,250.00 |
| 304-01 |
lime
|
245.19 |
TON |
125.00 |
30,648.75 |
25.00 |
6,129.75 |
126.00 |
30,893.94 |
120.00 |
29,422.80 |
| 304-04-B |
lime treatment (type d) (8 1/2" thick)
|
24,420   |
SQYD |
1.90 |
46,398.00 |
0.10 |
2,442.00 |
1.90 |
46,398.00 |
1.90 |
46,398.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,805   |
CUYD |
32.00 |
57,760.00 |
40.00 |
72,200.00 |
25.00 |
45,125.00 |
32.00 |
57,760.00 |
| 502-01 |
superpave asphaltic concrete
|
9,877.3 |
TON |
46.00 |
454,355.80 |
55.00 |
543,251.50 |
62.00 |
612,392.60 |
46.20 |
456,331.26 |
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
650.1 |
TON |
75.00 |
48,757.50 |
75.00 |
48,757.50 |
35.00 |
22,753.50 |
75.00 |
48,757.50 |
| 509-01 |
cold planing asphaltic pavement
|
11,311   |
SQYD |
1.20 |
13,573.20 |
1.75 |
19,794.25 |
1.40 |
15,835.40 |
3.25 |
36,760.75 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 236   |
CUYD |
0.01 |
- 2.36 |
1.00 |
- 236.00 |
0.01 |
- 2.36 |
0.10 |
- 23.60 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
84   |
LNFT |
80.00 |
6,720.00 |
100.00 |
8,400.00 |
100.00 |
8,400.00 |
90.00 |
7,560.00 |
| 701-08 |
relaying pipe
|
28   |
LNFT |
75.00 |
2,100.00 |
100.00 |
2,800.00 |
114.00 |
3,192.00 |
90.00 |
2,520.00 |
| 701-15 |
concrete collar
|
4   |
EACH |
800.00 |
3,200.00 |
2,200.00 |
8,800.00 |
800.00 |
3,200.00 |
900.00 |
3,600.00 |
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
16.00 |
2,400.00 |
18.00 |
2,700.00 |
16.00 |
2,400.00 |
18.00 |
2,700.00 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
150.0 |
LNFT |
25.00 |
3,750.00 |
28.00 |
4,200.00 |
36.00 |
5,400.00 |
28.00 |
4,200.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
300.0 |
LNFT |
35.00 |
10,500.00 |
40.00 |
12,000.00 |
44.00 |
13,200.00 |
39.00 |
11,700.00 |
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
1,750.00 |
21,000.00 |
2,000.00 |
24,000.00 |
1,900.00 |
22,800.00 |
2,000.00 |
24,000.00 |
| 711-01-C |
riprap (30 lb, 12" thick)
|
78   |
SQYD |
40.00 |
3,120.00 |
55.00 |
4,290.00 |
35.00 |
2,730.00 |
45.00 |
3,510.00 |
| 711-02-C |
riprap (30 lb)
|
214   |
CUYD |
110.00 |
23,540.00 |
100.00 |
21,400.00 |
110.00 |
23,540.00 |
123.00 |
26,322.00 |
| 711-04 |
geotextile fabric
|
494   |
SQYD |
2.50 |
1,235.00 |
2.50 |
1,235.00 |
3.00 |
1,482.00 |
2.50 |
1,235.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
16,000.00 |
16,000.00 |
5,500.00 |
5,500.00 |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
14   |
LNFT |
8.40 |
117.60 |
0.70 |
9.80 |
1.00 |
14.00 |
1.00 |
14.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.598 |
MILE |
250.00 |
2,149.50 |
400.00 |
3,439.20 |
300.00 |
2,579.40 |
150.00 |
1,289.70 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.617 |
MILE |
1.00 |
6.61 |
275.00 |
1,819.67 |
1.00 |
6.61 |
280.00 |
1,852.76 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
25.030 |
MILE |
1.00 |
25.03 |
450.00 |
11,263.50 |
1.00 |
25.03 |
444.00 |
11,113.32 |
| 717-01 |
seeding
|
267   |
LB |
6.00 |
1,602.00 |
7.00 |
1,869.00 |
7.00 |
1,869.00 |
10.00 |
2,670.00 |
| 718-01 |
fertilizer
|
5,700   |
LB |
0.30 |
1,710.00 |
0.35 |
1,995.00 |
0.40 |
2,280.00 |
0.22 |
1,254.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
145   |
SQYD |
1.50 |
217.50 |
1.75 |
253.75 |
2.00 |
290.00 |
3.30 |
478.50 |
| 721-01 |
asphalt mulch
|
13,794   |
GAL |
1.50 |
20,691.00 |
1.56 |
21,518.64 |
1.78 |
24,553.32 |
1.78 |
24,553.32 |
| 722-01 |
project site laboratory
|
1   |
EACH |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
13,500.00 |
13,500.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
20   |
SQYD |
65.00 |
1,300.00 |
145.00 |
2,900.00 |
200.00 |
4,000.00 |
250.00 |
5,000.00 |
| 726-01 |
bedding material
|
24.0 |
CUYD |
75.00 |
1,800.00 |
75.00 |
1,800.00 |
80.00 |
1,920.00 |
84.00 |
2,016.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
120,000.00 |
120,000.00 |
35,000.00 |
35,000.00 |
9,000.00 |
9,000.00 |
50,000.00 |
50,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
18   |
EACH |
55.00 |
990.00 |
65.00 |
1,170.00 |
60.00 |
1,080.00 |
62.00 |
1,116.00 |
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
65.00 |
780.00 |
70.00 |
840.00 |
78.00 |
936.00 |
72.00 |
864.00 |
| 731-02 |
reflectorized raised pavement markers
|
566   |
EACH |
4.50 |
2,547.00 |
5.00 |
2,830.00 |
5.00 |
2,830.00 |
5.00 |
2,830.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
14   |
LNFT |
2.40 |
33.60 |
2.75 |
38.50 |
3.00 |
42.00 |
2.67 |
37.38 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.714 |
MILE |
2,000.00 |
25,428.00 |
1,900.00 |
24,156.60 |
1,900.00 |
24,156.60 |
1,950.00 |
24,792.30 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.308 |
MILE |
1,000.00 |
3,308.00 |
700.00 |
2,315.60 |
750.00 |
2,481.00 |
723.00 |
2,391.68 |
| 735-01 |
mailboxes
|
21   |
EACH |
1.00 |
21.00 |
25.00 |
525.00 |
2.00 |
42.00 |
15.00 |
315.00 |
| 735-02 |
mailbox supports (single)
|
11   |
EACH |
170.00 |
1,870.00 |
150.00 |
1,650.00 |
175.00 |
1,925.00 |
150.00 |
1,650.00 |
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
175.00 |
700.00 |
250.00 |
1,000.00 |
180.00 |
720.00 |
210.00 |
840.00 |
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
325.00 |
650.00 |
400.00 |
800.00 |
400.00 |
800.00 |
350.00 |
700.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
7,500.00 |
7,500.00 |
7,500.00 |
7,500.00 |
200.00 |
200.00 |
10,000.00 |
10,000.00 |
| S-001 |
cement treated base course (12 in depth)
|
48,839   |
SQYD |
4.55 |
222,217.45 |
4.50 |
219,775.50 |
4.63 |
226,124.57 |
5.11 |
249,567.29 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,220,770.18 |
|
1,223,607.76 |
|
1,234,808.61 |
|
1,261,278.96 |
|