| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
178   |
LNFT |
4.50 |
801.00 |
14.00 |
2,492.00 |
3.93 |
699.54 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
70   |
CUYD |
30.00 |
2,100.00 |
55.00 |
3,850.00 |
24.26 |
1,698.20 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,077   |
CUYD |
45.00 |
48,465.00 |
25.00 |
26,925.00 |
35.28 |
37,996.56 |
|
|
| 502-01 |
superpave asphaltic concrete
|
9,962.0 |
TON |
45.50 |
453,271.00 |
52.00 |
518,024.00 |
46.00 |
458,252.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
3,049.2 |
TON |
55.00 |
167,706.00 |
52.00 |
158,558.40 |
65.00 |
198,198.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
280.0 |
LNFT |
28.00 |
7,840.00 |
30.00 |
8,400.00 |
29.17 |
8,167.60 |
|
|
| 704-03 |
blocked out guard rail
|
62.5 |
LNFT |
18.00 |
1,125.00 |
20.00 |
1,250.00 |
19.08 |
1,192.50 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
93.8 |
LNFT |
50.00 |
4,690.00 |
40.00 |
3,752.00 |
53.86 |
5,052.06 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,100.00 |
4,200.00 |
2,000.00 |
4,000.00 |
2,245.00 |
4,490.00 |
|
|
| 711-01-C |
riprap (30 lb, 12" thick)
|
55   |
SQYD |
30.00 |
1,650.00 |
75.00 |
4,125.00 |
78.55 |
4,320.25 |
|
|
| 711-04 |
geotextile fabric
|
55   |
SQYD |
2.50 |
137.50 |
9.00 |
495.00 |
3.37 |
185.35 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,600.00 |
3,600.00 |
23,400.00 |
23,400.00 |
97,777.00 |
97,777.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.908 |
MILE |
375.00 |
2,965.50 |
175.00 |
1,383.90 |
146.00 |
1,154.56 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.248 |
MILE |
275.00 |
1,718.20 |
275.00 |
1,718.20 |
281.00 |
1,755.68 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
22.233 |
MILE |
475.00 |
10,560.67 |
1.00 |
22.23 |
505.00 |
11,227.66 |
|
|
| 724-01-C |
pavement patching (13" minimum thickness)
|
215   |
SQYD |
75.00 |
16,125.00 |
120.00 |
25,800.00 |
90.00 |
19,350.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
24,000.00 |
24,000.00 |
46,000.00 |
46,000.00 |
100,000.00 |
100,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
65.00 |
260.00 |
78.55 |
314.20 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
523   |
EACH |
5.00 |
2,615.00 |
4.40 |
2,301.20 |
5.05 |
2,641.15 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.116 |
MILE |
1,900.00 |
21,120.40 |
1,675.00 |
18,619.30 |
1,965.00 |
21,842.94 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.124 |
MILE |
700.00 |
2,186.80 |
600.00 |
1,874.40 |
728.00 |
2,274.27 |
|
|
| 735-01 |
mailboxes
|
115   |
EACH |
25.00 |
2,875.00 |
2.00 |
230.00 |
13.00 |
1,495.00 |
|
|
| 735-02 |
mailbox supports (single)
|
99   |
EACH |
120.00 |
11,880.00 |
115.00 |
11,385.00 |
174.00 |
17,226.00 |
|
|
| 735-03 |
mailbox supports (double)
|
9   |
EACH |
150.00 |
1,350.00 |
130.00 |
1,170.00 |
216.00 |
1,944.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
275.00 |
275.00 |
200.00 |
200.00 |
1,254.00 |
1,254.00 |
|
|
| 739-01 |
hydro-seeding
|
0.25 |
ACRE |
1,300.00 |
325.00 |
3,000.00 |
750.00 |
3,366.00 |
841.50 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,600.00 |
3,600.00 |
9,500.00 |
9,500.00 |
28,285.00 |
28,285.00 |
|
|
| S-101 |
special anchor section
|
2   |
EACH |
1,100.00 |
2,200.00 |
850.00 |
1,700.00 |
1,122.00 |
2,244.00 |
|
|
| S-102 |
surface preparation
|
lump |
LUMP |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
33,000.00 |
33,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
819,682.07 |
|
908,185.63 |
|
1,064,879.02 |
|
|
|