| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
276   |
LNFT |
9.00 |
2,484.00 |
8.00 |
2,208.00 |
4.28 |
1,181.28 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
100   |
CUYD |
35.00 |
3,500.00 |
35.00 |
3,500.00 |
32.47 |
3,247.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
192   |
CUYD |
20.00 |
3,840.00 |
60.00 |
11,520.00 |
49.95 |
9,590.40 |
|
|
| 502-01 |
superpave asphaltic concrete
|
9,054.4 |
TON |
49.00 |
443,665.60 |
49.00 |
443,665.60 |
56.34 |
510,124.89 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
462.9 |
TON |
49.00 |
22,682.10 |
80.00 |
37,032.00 |
85.00 |
39,346.50 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
78,733   |
SQYD |
0.90 |
70,859.70 |
1.00 |
78,733.00 |
1.18 |
92,904.94 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,266   |
CUYD |
0.01 |
- 22.66 |
1.00 |
- 2,266.00 |
0.10 |
- 226.60 |
|
|
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
16.50 |
2,475.00 |
17.00 |
2,550.00 |
20.17 |
3,025.50 |
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
25.0 |
LNFT |
40.00 |
1,000.00 |
42.00 |
1,050.00 |
48.90 |
1,222.50 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
46.00 |
2,300.00 |
48.00 |
2,400.00 |
56.23 |
2,811.50 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,000.00 |
4,000.00 |
2,100.00 |
4,200.00 |
2,444.84 |
4,889.68 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
37,600.00 |
37,600.00 |
12,000.00 |
12,000.00 |
5,866.39 |
5,866.39 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.061 |
MILE |
175.00 |
1,935.67 |
375.00 |
4,147.87 |
156.43 |
1,730.27 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.767 |
MILE |
295.00 |
1,701.26 |
275.00 |
1,585.92 |
305.76 |
1,763.31 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
33.148 |
MILE |
1.00 |
33.14 |
475.00 |
15,745.30 |
550.12 |
18,235.37 |
|
|
| 717-01 |
seeding
|
20   |
LB |
7.00 |
140.00 |
8.00 |
160.00 |
7.95 |
159.00 |
|
|
| 718-01 |
fertilizer
|
250   |
LB |
0.30 |
75.00 |
0.35 |
87.50 |
0.79 |
197.50 |
|
|
| 721-01 |
asphalt mulch
|
3,635   |
GAL |
1.50 |
5,452.50 |
1.60 |
5,816.00 |
1.53 |
5,561.55 |
|
|
| 724-01-C |
pavement patching (8" minimum thickness)
|
100   |
SQYD |
75.00 |
7,500.00 |
110.00 |
11,000.00 |
65.00 |
6,500.00 |
|
|
| 724-01-D |
pavement patching (16" minimum thickness)
|
300   |
SQYD |
125.00 |
37,500.00 |
125.00 |
37,500.00 |
97.10 |
29,130.00 |
|
|
| 724-03 |
pavement joint repair
|
1,500.0 |
TON |
50.00 |
75,000.00 |
55.00 |
82,500.00 |
100.00 |
150,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
90,000.00 |
90,000.00 |
99,750.00 |
99,750.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
80.00 |
160.00 |
85.00 |
170.00 |
97.80 |
195.60 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
4,217   |
EACH |
2.00 |
8,434.00 |
5.00 |
21,085.00 |
5.32 |
22,434.44 |
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
8,227   |
LNFT |
0.55 |
4,524.85 |
0.42 |
3,455.34 |
0.48 |
3,948.96 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,195   |
LNFT |
1.65 |
1,971.75 |
0.80 |
956.00 |
0.95 |
1,135.25 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,509   |
LNFT |
2.65 |
3,998.85 |
2.50 |
3,772.50 |
2.86 |
4,315.74 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
16.574 |
MILE |
1,675.00 |
27,761.45 |
1,800.00 |
29,833.20 |
2,138.72 |
35,447.14 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.884 |
MILE |
650.00 |
1,874.60 |
675.00 |
1,946.70 |
793.47 |
2,288.36 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
18   |
EACH |
165.00 |
2,970.00 |
150.00 |
2,700.00 |
152.80 |
2,750.40 |
|
|
| 735-01 |
mailboxes
|
12   |
EACH |
1.00 |
12.00 |
25.00 |
300.00 |
13.31 |
159.72 |
|
|
| 735-02 |
mailbox supports (single)
|
12   |
EACH |
125.00 |
1,500.00 |
160.00 |
1,920.00 |
137.41 |
1,648.92 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,500.00 |
5,500.00 |
10,000.00 |
10,000.00 |
11,735.22 |
11,735.22 |
|
|
| S-001 |
sawcuts in asphaltic concrete lifts
|
78,010   |
LNFT |
0.50 |
39,005.00 |
0.75 |
58,507.50 |
0.61 |
47,586.10 |
|
|
| S-002 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
70,464   |
LNFT |
0.90 |
63,417.60 |
1.50 |
105,696.00 |
1.53 |
107,809.92 |
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
7,546   |
LNFT |
1.00 |
7,546.00 |
2.00 |
15,092.00 |
1.53 |
11,545.38 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
942,397.41 |
|
1,100,569.43 |
|
1,240,012.13 |
|
|
|