Lead Project: 023-02-0025
Parish: GRANT
Routes: US 167
Description: JCT. LA 8 - BIG CREEK
Type Const: cold planing asphaltic concrete, superpave asphaltic concrete, sawing and sealing
joints, and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $942,397.41
212312 GILCHRIST CONSTRUCTION CO. LLC $1,100,569.43
312487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,240,012.13
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 276      LNFT 9.00 2,484.00 8.00 2,208.00 4.28 1,181.28    
203-08 borrow (vehicular measurement) 100      CUYD 35.00 3,500.00 35.00 3,500.00 32.47 3,247.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
192      CUYD 20.00 3,840.00 60.00 11,520.00 49.95 9,590.40    
502-01 superpave asphaltic concrete 9,054.4    TON 49.00 443,665.60 49.00 443,665.60 56.34 510,124.89    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
462.9    TON 49.00 22,682.10 80.00 37,032.00 85.00 39,346.50    
509-01 cold planing asphaltic pavement 78,733      SQYD 0.90 70,859.70 1.00 78,733.00 1.18 92,904.94    
509-02 contractor retained reclaimed asphaltic pavement - 2,266      CUYD 0.01 - 22.66 1.00 - 2,266.00 0.10 - 226.60    
704-03 blocked out guard rail 150.0    LNFT 16.50 2,475.00 17.00 2,550.00 20.17 3,025.50    
704-07-A guard rail bridge attachments (single thrie beam) 25.0    LNFT 40.00 1,000.00 42.00 1,050.00 48.90 1,222.50    
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 46.00 2,300.00 48.00 2,400.00 56.23 2,811.50    
704-11-A guard rail end treatment (flared) 2      EACH 2,000.00 4,000.00 2,100.00 4,200.00 2,444.84 4,889.68    
713-01 temporary signs & barricades lump      LUMP 37,600.00 37,600.00 12,000.00 12,000.00 5,866.39 5,866.39    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
11.061  MILE 175.00 1,935.67 375.00 4,147.87 156.43 1,730.27    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
5.767  MILE 295.00 1,701.26 275.00 1,585.92 305.76 1,763.31    
713-05-A temporary pavement markings (solid line)(4" width) 33.148  MILE 1.00 33.14 475.00 15,745.30 550.12 18,235.37    
717-01 seeding 20      LB 7.00 140.00 8.00 160.00 7.95 159.00    
718-01 fertilizer 250      LB 0.30 75.00 0.35 87.50 0.79 197.50    
721-01 asphalt mulch 3,635      GAL 1.50 5,452.50 1.60 5,816.00 1.53 5,561.55    
724-01-C pavement patching (8" minimum thickness) 100      SQYD 75.00 7,500.00 110.00 11,000.00 65.00 6,500.00    
724-01-D pavement patching (16" minimum thickness) 300      SQYD 125.00 37,500.00 125.00 37,500.00 97.10 29,130.00    
724-03 pavement joint repair 1,500.0    TON 50.00 75,000.00 55.00 82,500.00 100.00 150,000.00    
727-01 mobilization lump      LUMP 50,000.00 50,000.00 90,000.00 90,000.00 99,750.00 99,750.00    
729-16-C object marker assembly (type 3) 2      EACH 80.00 160.00 85.00 170.00 97.80 195.60    
731-02 reflectorized raised pavement markers 4,217      EACH 2.00 8,434.00 5.00 21,085.00 5.32 22,434.44    
732-01-A plastic pavement striping (4" width) 8,227      LNFT 0.55 4,524.85 0.42 3,455.34 0.48 3,948.96    
732-01-C plastic pavement striping (8" width) 1,195      LNFT 1.65 1,971.75 0.80 956.00 0.95 1,135.25    
732-01-E plastic pavement striping (24" width) 1,509      LNFT 2.65 3,998.85 2.50 3,772.50 2.86 4,315.74    
732-02-A plastic pavement striping (solid line) (4" width) 16.574  MILE 1,675.00 27,761.45 1,800.00 29,833.20 2,138.72 35,447.14    
732-03-A plastic pavement striping (broken line)(4" width) 2.884  MILE 650.00 1,874.60 675.00 1,946.70 793.47 2,288.36    
732-04-A plastic pavement legends & symbols (arrow) 18      EACH 165.00 2,970.00 150.00 2,700.00 152.80 2,750.40    
735-01 mailboxes 12      EACH 1.00 12.00 25.00 300.00 13.31 159.72    
735-02 mailbox supports (single) 12      EACH 125.00 1,500.00 160.00 1,920.00 137.41 1,648.92    
740-01 construction layout lump      LUMP 5,500.00 5,500.00 10,000.00 10,000.00 11,735.22 11,735.22    
S-001 sawcuts in asphaltic concrete lifts 78,010      LNFT 0.50 39,005.00 0.75 58,507.50 0.61 47,586.10    
S-002 sawing and sealing longitudinal joints in asphaltic
concrete overlay
70,464      LNFT 0.90 63,417.60 1.50 105,696.00 1.53 107,809.92    
S-003 sawing and sealing transverse joints in asphaltic
concrete overlay
7,546      LNFT 1.00 7,546.00 2.00 15,092.00 1.53 11,545.38    
                       
 CONTRACTOR TOTAL       942,397.41   1,100,569.43   1,240,012.13    