| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
38,150.00 |
38,150.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
422   |
LNFT |
4.21 |
1,776.62 |
11.00 |
4,642.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,308   |
CUYD |
50.71 |
66,328.68 |
25.00 |
32,700.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
15,235.4 |
TON |
50.99 |
776,853.04 |
54.00 |
822,711.60 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
1,012.7 |
TON |
65.00 |
65,825.50 |
85.00 |
86,079.50 |
|
|
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
96,487   |
SQYD |
2.50 |
241,217.50 |
2.50 |
241,217.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
101,464   |
SQYD |
2.00 |
202,928.00 |
2.10 |
213,074.40 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 4,155   |
CUYD |
0.10 |
- 415.50 |
0.01 |
- 41.55 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
3,395   |
LNFT |
1.32 |
4,481.40 |
1.10 |
3,734.50 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
4,234   |
LNFT |
1.50 |
6,351.00 |
1.25 |
5,292.50 |
|
|
|
|
| 602-05-I-01 |
full depth patching of jointed concrete pavement (9"
thick) (16.0 square yards and under) |
44.0 |
SQYD |
180.46 |
7,940.24 |
150.00 |
6,600.00 |
|
|
|
|
| 602-05-I-02 |
full depth patching of jointed concrete pavement (9"
thick) (16.1 square yards to 48.0 square yards) |
288.1 |
SQYD |
162.41 |
46,790.32 |
135.00 |
38,893.50 |
|
|
|
|
| 602-05-I-03 |
full depth patching of jointed concrete pavement (9"
thick) (48.1 square yards and over) |
141.3 |
SQYD |
144.36 |
20,398.06 |
120.00 |
16,956.00 |
|
|
|
|
| 602-10 |
longitudinal shoulder joints
|
6,790   |
LNFT |
1.20 |
8,148.00 |
1.00 |
6,790.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
65   |
EACH |
1,325.00 |
86,125.00 |
1,200.00 |
78,000.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
359.4 |
LNFT |
51.73 |
18,591.76 |
43.00 |
15,454.20 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
56.3 |
LNFT |
20.45 |
1,151.33 |
17.00 |
957.10 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
12.6 |
LNFT |
101.00 |
1,272.60 |
84.00 |
1,058.40 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,410.00 |
4,820.00 |
2,000.00 |
4,000.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
500.0 |
LNFT |
60.15 |
30,075.00 |
30.00 |
15,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
150,000.00 |
150,000.00 |
114,000.00 |
114,000.00 |
|
|
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
2,490   |
LNFT |
0.72 |
1,792.80 |
1.10 |
2,739.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
20.305 |
MILE |
151.00 |
3,066.05 |
215.00 |
4,365.57 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.041 |
MILE |
301.00 |
2,420.34 |
155.00 |
1,246.35 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
30.245 |
MILE |
542.00 |
16,392.79 |
495.00 |
14,971.27 |
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
211.00 |
1,266.00 |
105.00 |
630.00 |
|
|
|
|
| 713-06-E |
temporary pavement legends and symbols (school
crossing) |
6   |
EACH |
241.00 |
1,446.00 |
105.00 |
630.00 |
|
|
|
|
| 724-01-C |
pavement patching (18" minimum thickness)
|
2,500   |
SQYD |
65.00 |
162,500.00 |
105.00 |
262,500.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
1,000.0 |
TON |
90.00 |
90,000.00 |
75.00 |
75,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
171,500.00 |
171,500.00 |
176,000.00 |
176,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
97.00 |
194.00 |
80.00 |
160.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,662   |
EACH |
5.41 |
14,401.42 |
4.50 |
11,979.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,236   |
LNFT |
0.96 |
1,186.56 |
1.65 |
2,039.40 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
830   |
LNFT |
1.44 |
1,195.20 |
4.00 |
3,320.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.108 |
MILE |
2,106.00 |
19,181.44 |
3,000.00 |
27,324.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.510 |
MILE |
782.00 |
1,180.82 |
1,450.00 |
2,189.50 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
482.00 |
964.00 |
600.00 |
1,200.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
602.00 |
1,204.00 |
600.00 |
1,200.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.684 |
MILE |
3,560.00 |
2,435.04 |
7,000.00 |
4,788.00 |
|
|
|
|
| 735-01 |
mailboxes
|
59   |
EACH |
13.10 |
772.90 |
1.00 |
59.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
47   |
EACH |
130.00 |
6,110.00 |
125.00 |
5,875.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
332.00 |
664.00 |
325.00 |
650.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,895.00 |
40,895.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
26   |
EACH |
120.30 |
3,127.80 |
500.00 |
13,000.00 |
|
|
|
|
| S-001 |
catch basin modification
|
47   |
EACH |
2,000.00 |
94,000.00 |
3,200.00 |
150,400.00 |
|
|
|
|
| S-002 |
stone or recycled concrete (6" thickness)
|
78.9 |
CUYD |
102.26 |
8,068.31 |
85.00 |
6,706.50 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,424,773.02 |
|
2,511,092.24 |
|
|
|
|
|