Letting of 2/23/2005 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 853-36-0033
Parish: TANGIPAHOA
Routes: US 51
Description: JCT. NORTH BOUND LANE I-55 - EAST JCT. LA.22
Type Const: grading, cold planing asph. concrete, in-place stab. base course, superpave asph.
concrete pvmt., asph.surface treatment, pvmt. patching, pvmt. widening and related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC. $549,664.24
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $557,294.80
302179 BOH BROS. CONSTRUCTION CO., LLC. $576,067.47
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 1,000      CUYD 5.00 5,000.00 10.50 10,500.00 7.00 7,000.00    
203-08-A borrow (vehicular meas.)(selected soils) 1,000      CUYD 5.00 5,000.00 10.50 10,500.00 9.00 9,000.00    
303-01-B in-place cement stabilized base course (8 1/2" thick) 13,085      SQYD 5.60 73,276.00 7.55 98,791.75 5.00 65,425.00    
502-01 superpave asphaltic concrete 4,425.5    TON 49.00 216,849.50 45.60 201,802.80 51.50 227,913.25    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
296.9    TON 49.00 14,548.10 79.64 23,645.11 80.00 23,752.00    
507-01-B asphaltic surface treatment (2 applications) 22,132      SQYD 2.70 59,756.40 2.50 55,330.00 2.75 60,863.00    
509-01 cold planing asphaltic pavement 22,132      SQYD 1.70 37,624.40 1.18 26,115.76 1.30 28,771.60    
509-02 contractor retained reclaimed asphaltic pavement - 621      CUYD 1.00 - 621.00 0.20 - 124.20 10.00 - 6,210.00    
706-03-A incidental concrete paving (4" thick) 4.1    SQYD 120.00 492.00 52.50 215.25 100.00 410.00    
707-01 concrete curb 22.9    LNFT 60.00 1,374.00 26.25 601.12 50.00 1,145.00    
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 5,775.00 5,775.00 20,000.00 20,000.00    
713-03-C temporary pavement markings (8" width) 144      LNFT 0.40 57.60 0.21 30.24 0.10 14.40    
713-03-D temporary pavement markings (12" width) 42      LNFT 0.60 25.20 0.32 13.44 0.15 6.30    
713-03-E temporary pavement markings (24" width) 36      LNFT 1.20 43.20 0.63 22.68 0.50 18.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
3.860  MILE 140.00 540.40 167.36 646.00 10.00 38.60    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
5.580  MILE 20.00 111.60 262.50 1,464.75 15.00 83.70    
713-05-A temporary pavement markings (solid line)(4" width) 14.291  MILE 40.00 571.64 419.97 6,001.79 20.00 285.82    
713-07-A temporary reflectorized raised pavement markers (tabs) 512      EACH 2.00 1,024.00 1.58 808.96 1.25 640.00    
722-01 project site laboratory 1      EACH 100.00 100.00 3,105.87 3,105.87 1,000.00 1,000.00    
724-01-B pavement patching (12" minimum thickness) 517      SQYD 70.00 36,190.00 60.65 31,356.05 80.00 41,360.00    
724-02 pavement widening 441.4    SQYD 36.00 15,890.40 46.43 20,494.20 36.00 15,890.40    
727-01 mobilization lump      LUMP 40,000.00 40,000.00 31,000.00 31,000.00 55,000.00 55,000.00    
729-16-C object marker assembly (type 3) 12      EACH 100.00 1,200.00 68.25 819.00 150.00 1,800.00    
731-02 reflectorized raised pavement markers 256      EACH 5.50 1,408.00 5.25 1,344.00 5.25 1,344.00    
732-01-C plastic pavement striping (8" width) 48      LNFT 2.00 96.00 0.84 40.32 1.00 48.00    
732-01-D plastic pavement striping (12" width) 14      LNFT 3.00 42.00 1.26 17.64 1.70 23.80    
732-01-E plastic pavement striping (24" width) 12      LNFT 5.00 60.00 2.52 30.24 3.30 39.60    
732-02-A plastic pavement striping (solid line) (4" width) 4.770  MILE 2,200.00 10,494.00 1,837.50 8,764.87 2,100.00 10,017.00    
732-03-A plastic pavement striping (broken line)(4" width) 1.860  MILE 730.00 1,357.80 682.50 1,269.45 700.00 1,302.00    
735-01 mailboxes 3      EACH 1.00 3.00 13.42 40.26 2.00 6.00    
735-02 mailbox supports (single) 3      EACH 200.00 600.00 818.65 2,455.95 100.00 300.00    
736-09 loop detector 130      LNFT 15.00 1,950.00 12.60 1,638.00 12.00 1,560.00    
736-10 underground junction box 1      EACH 400.00 400.00 336.00 336.00 320.00 320.00    
739-01 hydro-seeding 2.50   ACRE 1,600.00 4,000.00 1,575.00 3,937.50 1,000.00 2,500.00    
740-01 construction layout lump      LUMP 7,000.00 7,000.00 4,305.00 4,305.00 2,000.00 2,000.00    
S-001 u-channel post installation 20      EACH 60.00 1,200.00 78.75 1,575.00 70.00 1,400.00    
S-002 cleaning existing ditches 500      LNFT 4.00 2,000.00 5.25 2,625.00 2.00 1,000.00    
                       
 CONTRACTOR TOTAL       549,664.24   557,294.80   576,067.47    