| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
1,000   |
CUYD |
5.00 |
5,000.00 |
10.50 |
10,500.00 |
7.00 |
7,000.00 |
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
1,000   |
CUYD |
5.00 |
5,000.00 |
10.50 |
10,500.00 |
9.00 |
9,000.00 |
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
13,085   |
SQYD |
5.60 |
73,276.00 |
7.55 |
98,791.75 |
5.00 |
65,425.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
4,425.5 |
TON |
49.00 |
216,849.50 |
45.60 |
201,802.80 |
51.50 |
227,913.25 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
296.9 |
TON |
49.00 |
14,548.10 |
79.64 |
23,645.11 |
80.00 |
23,752.00 |
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
22,132   |
SQYD |
2.70 |
59,756.40 |
2.50 |
55,330.00 |
2.75 |
60,863.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
22,132   |
SQYD |
1.70 |
37,624.40 |
1.18 |
26,115.76 |
1.30 |
28,771.60 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 621   |
CUYD |
1.00 |
- 621.00 |
0.20 |
- 124.20 |
10.00 |
- 6,210.00 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
4.1 |
SQYD |
120.00 |
492.00 |
52.50 |
215.25 |
100.00 |
410.00 |
|
|
| 707-01 |
concrete curb
|
22.9 |
LNFT |
60.00 |
1,374.00 |
26.25 |
601.12 |
50.00 |
1,145.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
5,775.00 |
5,775.00 |
20,000.00 |
20,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
144   |
LNFT |
0.40 |
57.60 |
0.21 |
30.24 |
0.10 |
14.40 |
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
42   |
LNFT |
0.60 |
25.20 |
0.32 |
13.44 |
0.15 |
6.30 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
36   |
LNFT |
1.20 |
43.20 |
0.63 |
22.68 |
0.50 |
18.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.860 |
MILE |
140.00 |
540.40 |
167.36 |
646.00 |
10.00 |
38.60 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.580 |
MILE |
20.00 |
111.60 |
262.50 |
1,464.75 |
15.00 |
83.70 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.291 |
MILE |
40.00 |
571.64 |
419.97 |
6,001.79 |
20.00 |
285.82 |
|
|
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
512   |
EACH |
2.00 |
1,024.00 |
1.58 |
808.96 |
1.25 |
640.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
100.00 |
100.00 |
3,105.87 |
3,105.87 |
1,000.00 |
1,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
517   |
SQYD |
70.00 |
36,190.00 |
60.65 |
31,356.05 |
80.00 |
41,360.00 |
|
|
| 724-02 |
pavement widening
|
441.4 |
SQYD |
36.00 |
15,890.40 |
46.43 |
20,494.20 |
36.00 |
15,890.40 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
31,000.00 |
31,000.00 |
55,000.00 |
55,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
100.00 |
1,200.00 |
68.25 |
819.00 |
150.00 |
1,800.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
256   |
EACH |
5.50 |
1,408.00 |
5.25 |
1,344.00 |
5.25 |
1,344.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
48   |
LNFT |
2.00 |
96.00 |
0.84 |
40.32 |
1.00 |
48.00 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
14   |
LNFT |
3.00 |
42.00 |
1.26 |
17.64 |
1.70 |
23.80 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
5.00 |
60.00 |
2.52 |
30.24 |
3.30 |
39.60 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.770 |
MILE |
2,200.00 |
10,494.00 |
1,837.50 |
8,764.87 |
2,100.00 |
10,017.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.860 |
MILE |
730.00 |
1,357.80 |
682.50 |
1,269.45 |
700.00 |
1,302.00 |
|
|
| 735-01 |
mailboxes
|
3   |
EACH |
1.00 |
3.00 |
13.42 |
40.26 |
2.00 |
6.00 |
|
|
| 735-02 |
mailbox supports (single)
|
3   |
EACH |
200.00 |
600.00 |
818.65 |
2,455.95 |
100.00 |
300.00 |
|
|
| 736-09 |
loop detector
|
130   |
LNFT |
15.00 |
1,950.00 |
12.60 |
1,638.00 |
12.00 |
1,560.00 |
|
|
| 736-10 |
underground junction box
|
1   |
EACH |
400.00 |
400.00 |
336.00 |
336.00 |
320.00 |
320.00 |
|
|
| 739-01 |
hydro-seeding
|
2.50 |
ACRE |
1,600.00 |
4,000.00 |
1,575.00 |
3,937.50 |
1,000.00 |
2,500.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,000.00 |
7,000.00 |
4,305.00 |
4,305.00 |
2,000.00 |
2,000.00 |
|
|
| S-001 |
u-channel post installation
|
20   |
EACH |
60.00 |
1,200.00 |
78.75 |
1,575.00 |
70.00 |
1,400.00 |
|
|
| S-002 |
cleaning existing ditches
|
500   |
LNFT |
4.00 |
2,000.00 |
5.25 |
2,625.00 |
2.00 |
1,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
549,664.24 |
|
557,294.80 |
|
576,067.47 |
|
|
|