| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-F |
removal of concrete combination curb & gutter
|
925.0 |
LNFT |
10.00 |
9,250.00 |
10.00 |
9,250.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
10,997.7 |
TON |
55.00 |
604,873.50 |
54.00 |
593,875.80 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
800.0 |
TON |
55.00 |
44,000.00 |
110.00 |
88,000.00 |
|
|
|
|
| 509-01-A |
cold planing asphaltic pavement (2.0" thick)
|
1,713   |
SQYD |
3.00 |
5,139.00 |
3.00 |
5,139.00 |
|
|
|
|
| 509-01-B |
cold planing asphaltic pavement (3.5" thick)
|
52,545   |
SQYD |
3.75 |
197,043.75 |
4.00 |
210,180.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic concrete
|
- 2,602   |
CUYD |
10.00 |
- 26,020.00 |
10.00 |
- 26,020.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
875   |
LNFT |
3.00 |
2,625.00 |
1.50 |
1,312.50 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
1,125   |
LNFT |
3.00 |
3,375.00 |
1.50 |
1,687.50 |
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
500   |
LNFT |
3.00 |
1,500.00 |
3.00 |
1,500.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
109   |
EACH |
500.00 |
54,500.00 |
900.00 |
98,100.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
140   |
EACH |
100.00 |
14,000.00 |
50.00 |
7,000.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
500.0 |
SQYD |
50.00 |
25,000.00 |
50.00 |
25,000.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
1,025.0 |
LNFT |
30.00 |
30,750.00 |
40.00 |
41,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
300,000.00 |
300,000.00 |
130,000.00 |
130,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
15,000   |
LNFT |
0.10 |
1,500.00 |
0.10 |
1,500.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
8,100   |
LNFT |
0.20 |
1,620.00 |
1.00 |
8,100.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.760 |
MILE |
10.00 |
57.60 |
120.00 |
691.20 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.760 |
MILE |
15.00 |
86.40 |
300.00 |
1,728.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
51.210 |
MILE |
20.00 |
1,024.20 |
100.00 |
5,121.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
126   |
EACH |
10.00 |
1,260.00 |
10.00 |
1,260.00 |
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
50.00 |
300.00 |
10.00 |
60.00 |
|
|
|
|
| 713-06-E |
temporary pavement legends and symbols (school
crossing) |
27   |
EACH |
30.00 |
810.00 |
10.00 |
270.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
9,000   |
SQYD |
50.00 |
450,000.00 |
60.00 |
540,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
200,000.00 |
200,000.00 |
220,000.00 |
220,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,026   |
EACH |
6.00 |
6,156.00 |
5.50 |
5,643.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
5,000   |
LNFT |
1.00 |
5,000.00 |
1.00 |
5,000.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
2,700   |
LNFT |
3.00 |
8,100.00 |
3.00 |
8,100.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.070 |
MILE |
2,500.00 |
42,675.00 |
2,200.00 |
37,554.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.920 |
MILE |
850.00 |
1,632.00 |
800.00 |
1,536.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
42   |
EACH |
140.00 |
5,880.00 |
130.00 |
5,460.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
7   |
EACH |
150.00 |
1,050.00 |
140.00 |
980.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
560.00 |
1,120.00 |
500.00 |
1,000.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
9   |
EACH |
440.00 |
3,960.00 |
400.00 |
3,600.00 |
|
|
|
|
| 736-09 |
loop detector
|
2,120   |
LNFT |
10.00 |
21,200.00 |
10.00 |
21,200.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| S-002 |
tree pruning
|
lump |
LUMP |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| S-003 |
cleaning catch basins
|
24   |
EACH |
500.00 |
12,000.00 |
120.00 |
2,880.00 |
|
|
|
|
| S-004 |
sidewalk handicap ramps
|
1,400.0 |
SQYD |
75.00 |
105,000.00 |
120.00 |
168,000.00 |
|
|
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
875   |
LNFT |
3.00 |
2,625.00 |
1.70 |
1,487.50 |
|
|
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
1,125   |
LNFT |
3.00 |
3,375.00 |
1.70 |
1,912.50 |
|
|
|
|
| S-927 |
sawing in ashphaltic concrete lifts
|
2,000   |
LNFT |
2.00 |
4,000.00 |
0.10 |
200.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,185,467.45 |
|
2,261,808.00 |
|
|
|
|
|