Letting of 2/23/2005 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 744-61-0007
Parish: W BATON ROUGE
Routes:
Description: PORT ALLEN LEVEE-TOP AND COMMUNITY BICYCLE PATH, PHASE II
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, portland cement concrete sidewalk and related work.
 
RankLicenseBidderAmount
137032 GARRETT-LABORDE CONSTRUCTION LLC $257,140.20
236183 POINTE COUPEE CONTRACTORS LLC $269,058.90
325587 GUTCON, INC. $274,389.07
425747 KOSTMAYER CONSTRUCTION, LLC $293,076.60
500849 F.G. SULLIVAN, JR. CONTRACTOR LLC $297,490.70
602109 CHAMBERS CONSTRUCTION CO., INC. $317,087.52
702074 CIRCLE, INC. $362,300.15
42360 L. KING COMPANY LLC IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
GARRETT-LABORDE CONSTRUCTION LLC
- 2 -
POINTE COUPEE CONTRACTORS LLC
- 3 -
GUTCON, INC.
- 4 -
KOSTMAYER CONSTRUCTION, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 5,000.00 5,000.00 17,000.00 17,000.00 2,000.00 2,000.00 17,000.00 17,000.00
202-02-D removal of concrete walks & drives 23      SQYD 50.00 1,150.00 10.00 230.00 25.00 575.00 9.00 207.00
202-02-G removal of surfacing & stabilized base 387.2    SQYD 40.00 15,488.00 20.00 7,744.00 22.00 8,518.40 21.00 8,131.20
203-08 borrow (vehicular measurement) 2,980      CUYD 12.00 35,760.00 10.00 29,800.00 10.00 29,800.00 13.00 38,740.00
302-02-B class ii base course (8 1/2" thick) 681.7    SQYD 10.00 6,817.00 20.00 13,634.00 20.00 13,634.00 16.00 10,907.20
502-01 superpave asphaltic concrete (2" thick) 78.4    TON 110.00 8,624.00 243.00 19,051.20 100.00 7,840.00 205.00 16,072.00
701-06-A side drain pipe arch (15" equiv.) 110      LNFT 25.00 2,750.00 50.00 5,500.00 35.00 3,850.00 60.00 6,600.00
702-03-A catch basins (cb-01) 3      EACH 3,000.00 9,000.00 2,500.00 7,500.00 5,000.00 15,000.00 2,800.00 8,400.00
702-04-B adjusting catch basins 7      EACH 1,000.00 7,000.00 500.00 3,500.00 2,000.00 14,000.00 480.00 3,360.00
706-01-E concrete walk (8" thick) 2,181.9    SQYD 47.00 102,549.30 45.00 98,185.50 52.00 113,458.80 46.00 100,367.40
706-03-A incidental concrete paving (4" thick) 149.3    SQYD 40.00 5,972.00 28.00 4,180.40 40.00 5,972.00 34.00 5,076.20
712-01-A concrete cast-in-place revetment (4" thick) 635      SQYD 40.00 25,400.00 28.00 17,780.00 40.00 25,400.00 34.00 21,590.00
713-01 temporary signs & barricades lump      LUMP 3,000.00 3,000.00 7,500.00 7,500.00 5,000.00 5,000.00 4,800.00 4,800.00
716-01-A mulch (vegetative) 0.45   ACRE 6,000.00 2,700.00 2,700.00 1,215.00 2,000.00 900.00 3,000.00 1,350.00
717-01 seeding 16      LB 20.00 320.00 12.00 192.00 15.00 240.00 48.00 768.00
718-01 fertilizer 450      LB 2.00 900.00 0.50 225.00 0.50 225.00 1.80 810.00
726-01 bedding material 6.0    CUYD 100.00 600.00 30.00 180.00 30.00 180.00 60.00 360.00
727-01 mobilization lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 22,000.00 22,000.00
729-01 sign (type a) 53.6    SQFT 24.00 1,286.40 28.00 1,500.80 33.00 1,768.80 26.00 1,393.60
729-21 u-channel post 12      EACH 110.00 1,320.00 15.00 180.00 60.00 720.00 115.00 1,380.00
732-02-A plastic pavement striping (solid line) (4" width) 0.244  MILE 6,000.00 1,464.00 4,620.00 1,127.28 5,082.00 1,240.00 5,000.00 1,220.00
732-02-C plastic pavement striping (solid line) (8" width) 0.029  MILE 12,000.00 348.00 9,240.00 267.96 10,164.00 294.75 10,000.00 290.00
732-02-D plastic pavement striping (solid line) (12" width) 0.034  MILE 36,000.00 1,224.00 27,720.00 942.48 30,492.00 1,036.72 30,000.00 1,020.00
732-03-A plastic pavement striping (broken line)(4" width) 0.067  MILE 2,500.00 167.50 1,840.00 123.28 2,024.00 135.60 2,000.00 134.00
732-04 plastic pavement legends & symbols (bike) 2      EACH 650.00 1,300.00 500.00 1,000.00 550.00 1,100.00 1,000.00 2,000.00
740-01 construction layout lump      LUMP 5,000.00 5,000.00 20,000.00 20,000.00 10,000.00 10,000.00 17,000.00 17,000.00
S-001 locking bollards 2      EACH 1,000.00 2,000.00 250.00 500.00 750.00 1,500.00 1,050.00 2,100.00
                       
 CONTRACTOR TOTAL       257,140.20   269,058.90   274,389.07   293,076.60
 
Item Number Item Description Quantity Unit of Measure - 5 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 6 -
CHAMBERS CONSTRUCTION CO., INC.
- 7 -
CIRCLE, INC.

L. KING COMPANY LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 1,000.00 1,000.00 8,700.00 8,700.00 17,000.00 17,000.00 11,457.00 11,457.00
202-02-D removal of concrete walks & drives 23      SQYD 25.00 575.00 20.00 460.00 11.00 253.00 55.00 1,265.00
202-02-G removal of surfacing & stabilized base 387.2    SQYD 10.00 3,872.00 20.00 7,744.00 10.50 4,065.60 30.00 11,616.00
203-08 borrow (vehicular measurement) 2,980      CUYD 15.00 44,700.00 15.00 44,700.00 11.50 34,270.00 9.50 28,310.00
302-02-B class ii base course (8 1/2" thick) 681.7    SQYD 27.00 18,405.90 30.00 20,451.00 17.00 11,588.90 13.50 9,202.95
502-01 superpave asphaltic concrete (2" thick) 78.4    TON 100.00 7,840.00 140.00 10,976.00 134.00 10,505.60 79.00 6,193.60
701-06-A side drain pipe arch (15" equiv.) 110      LNFT 40.00 4,400.00 70.00 7,700.00 37.00 4,070.00 46.00 5,060.00
702-03-A catch basins (cb-01) 3      EACH 3,000.00 9,000.00 5,000.00 15,000.00 2,550.00 7,650.00 1,795.00 5,385.00
702-04-B adjusting catch basins 7      EACH 1,000.00 7,000.00 3,000.00 21,000.00 2,400.00 16,800.00 1,846.00 12,922.00
706-01-E concrete walk (8" thick) 2,181.9    SQYD 47.00 102,549.30 50.00 109,095.00 62.50 136,368.75 56.00 122,186.40
706-03-A incidental concrete paving (4" thick) 149.3    SQYD 31.00 4,628.30 60.00 8,958.00 96.00 14,332.80 30.00 4,479.00
712-01-A concrete cast-in-place revetment (4" thick) 635      SQYD 31.00 19,685.00 40.00 25,400.00 91.00 57,785.00 28.00 17,780.00
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 5,000.00 5,000.00 1,300.00 1,300.00 2,787.00 2,787.00
716-01-A mulch (vegetative) 0.45   ACRE 800.00 360.00 1,500.00 675.00 3,050.00 1,372.50 1,487.00 669.15
717-01 seeding 16      LB 16.00 256.00 50.00 800.00 19.50 312.00 10.00 160.00
718-01 fertilizer 450      LB 0.40 180.00 3.00 1,350.00 2.00 900.00 0.60 270.00
726-01 bedding material 6.0    CUYD 50.00 300.00 50.00 300.00 51.00 306.00 20.00 120.00
727-01 mobilization lump      LUMP 26,000.00 26,000.00 13,700.00 13,700.00 14,000.00 14,000.00 20,000.00 20,000.00
729-01 sign (type a) 53.6    SQFT 12.00 643.20 30.00 1,608.00 33.00 1,768.80 16.50 884.40
729-21 u-channel post 12      EACH 100.00 1,200.00 50.00 600.00 65.00 780.00 40.00 480.00
732-02-A plastic pavement striping (solid line) (4" width) 0.244  MILE 5,000.00 1,220.00 4,600.00 1,122.40 5,540.00 1,351.76 5,154.00 1,257.57
732-02-C plastic pavement striping (solid line) (8" width) 0.029  MILE 10,000.00 290.00 14,550.00 421.95 11,600.00 336.40 10,304.00 298.81
732-02-D plastic pavement striping (solid line) (12" width) 0.034  MILE 28,000.00 952.00 14,200.00 482.80 39,000.00 1,326.00 30,924.00 1,051.41
732-03-A plastic pavement striping (broken line)(4" width) 0.067  MILE 2,000.00 134.00 5,125.00 343.37 2,344.00 157.04 2,051.00 137.41
732-04 plastic pavement legends & symbols (bike) 2      EACH 600.00 1,200.00 750.00 1,500.00 610.00 1,220.00 557.00 1,114.00
740-01 construction layout lump      LUMP 25,300.00 25,300.00 5,000.00 5,000.00 21,100.00 21,100.00 23,122.00 23,122.00
S-001 locking bollards 2      EACH 400.00 800.00 2,000.00 4,000.00 690.00 1,380.00 285.00 570.00
                       
 CONTRACTOR TOTAL       297,490.70   317,087.52   362,300.15   IRREGULAR